This document provides an amendment to a solicitation for repair and alteration services at multiple facilities. Key details include:
The solicitation is for repair and renovation services at three buildings (B180, B327, B384) located at the 158th Fighter Wing in South Burlington, Vermont. Work includes interior renovations, HVAC and electrical system installations and updates, communication cabling, and utility installations. The estimated value is between $1-5 million. The North American Industry Classification System code is 238220 and it is set aside for small businesses with less than $39.5 million in annual revenue. The pre-bid conference is scheduled as indicated in the solicitation and questions must be submitted by a specified deadline. The bid opening date is also provided. Interested parties must register on beta.SAM.gov to access solicitation documents. The amendment incorporates questions and answers to provide clarification on scope items such as insulation requirements, paving thicknesses, equipment removal responsibilities, and design details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 Abstract of Offers W50S9C-20-B-0001 - Certified-Signed.pdf | ||
| Q and A as of 30 Jun 20 W50S9C20B0001 Repair Multi-Facilities.pdf | ||
| Q and A as of 26 Jun 20 W50S9C20B0001 Repair Multi-Facilities.pdf | ||
| Q and A as of 25 Jun 20 W50S9C20B0001 Repair Multi-Facilities.pdf | ||
| Q and A as of 16 Jun 20 W50S9C20B0001 Repair Multi-Facilities.pdf | ||
| Pre-Bid Minutes - Attendance - Power Point Slides W50S9C20B0001.pdf | ||
| W50S9C20B0001 - Amendment 0001.pdf | ||
| 2001 - B-327 DRAWINGS_100419.pdf | ||
| 0001 - B-180 PROJECT MANUAL_Rev 051120.pdf | ||
| 0001 - B-180 DRAWINGS_100419.pdf | ||
| 3001 - B-384 PROJECT MANUAL_Rev 051120.pdf | ||
| 2001 - B-327 PROJECT MANUAL_Rev 051120.pdf | ||
| W50S9C20B0001.pdf | ||
| 3001 - B-384 DRAWINGS_100419.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
To formally incorporate Q and A as of 30 Jun 20 W50S9C20B0001 Repair Mulit- Facilities, as posted on Beta.Sam.Gov, as part of the solicitation documents.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9C20B0001
X 9B. DATED (SEE ITEM 11)
02-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jun-2020
CODE
USPFO VT 158 MISSION SUPPORT CONTRACTING
45 NCO DR SUITE A
SOUTH BURLINGTON VT 05403-5867
W50S9C 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S9C20B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Q AND A AS OF 30 JUN 20
1. Question: What is the current Bid Bond form and where can it be downloaded?
Answer – The current Bid Bond form is SF24 in accordance with FAR 28.106-1. The current revision is 08/2016. The form is updated and available at https://www.gsa.gov/forms-library/bid-bond
2. Question: Will the equipment in B-180 be removed by the Government prior to Notice to Proceed?
Answer – Yes. Spec. Section 011000 “Summary” 1.5 “Work By Owner”, B states “Preceding Work: Owner will perform the following operations at Project site. Those operations are scheduled to be substantially complete before work under this Contract begins.
Move furniture and equipment out of areas to be renovated.”
3. Question: Is the B-180 Mezzanine removed by the contractor and turned over to the Government?
Answer – Yes, per demo note #11 on A-2 of the B-180 Drawings.
4. Question: Regarding specification section 096723 Resinous flooring: Part a. Please clarify what exactly is expected as a “reinforcing membrane”. A reinforcing membrane by dur-a-flex would add quite a bit to the cost of the installation.
Answer – The reinforcing membrane is to be provided as required by the manufacturer to span over any cracks in the existing slab so that they do not telegraph through the resinous flooring. Patching may also be required to prep the existing slabs. Both the slabs in B180 and in B327 are in fairly good condition and shouldn’t require widespread repairs or patching.
5. Question: Part “b” to question above. Integral base is specified but resilient base is scheduled on the drawings. Please clarify what is correct.
Answer –Delete integral resinous base. Please provide rubber base as indicated on the Drawings and as Specified in 096513.
6. Question: Please clarify the scope of work to be included within bid item #0002 B-180 Machine Shop – Utilities. Part a. Is this item only for work outside of the building?
Answer – Bid Item #0002 B-180 Machine Shop – Utilities, shall include all work associated with water, gas, and sewer services, as indicated on the Drawings and Specifications. This includes all of the work inside and outside of the building. This was broken out separately as the building does not currently have these services.
7. Question: Part “b” to question 6 above. Is this item only for mechanical and electrical or should it include site work, pavement, lawn restoration etc.?
Answer – See answer to question #6 above.
8. Question: At overhead doors 100.2 & 100.3, there are existing exterior bollards scheduled to remain. Excavation at building perimeter for grounding system. Are bollards at these door locations salvageable for re-installation or will new bollards be required?
Answer – The ground loop at the perimeter of the building is typically installed approximately 18”-24” below grade and can be located further from the building as required to not disturb the existing bollards. The existing bollard construction is unknown, but we assume they can be salvaged and reused.
9. Question: What is the thickness of the existing asphalt pavement? Please provide an assumed thickness for estimating purposes.
Answer – Assumed thickness is 5”. Thicknesses may vary.
10. Question: B-384 AME Storage – What is the thickness of the existing asphalt pavement? Please provide an assumed thickness for estimating purposes.
Answer – See answer to question # 9 above.
11. Question: M0.1 – Mechanical Notes – is the intent to install acoustic liner and double wall insulated ductwork with perforated inner per notes #35 & 38 for all buildings?
Answer – Yes, mechanical notes # 35 and #38 are included in all three drawing sets and apply to all three buildings although B-384 has no air handling unit or ductwork.
12. Question: At buildings B-180 & B-327, the drawings and specifications call for dense pack cellulose at the exterior walls and roof assemblies. Our insulation subcontractor says that this will be difficult if not impossible to achieve with metal framing. Fiber mesh is typically used in wood framed assemblies – fiber mesh is not able to be used with metal gauge framing due to the amount of fastening required. The only method for installation of dense pack cellulose would be drill and fill/insertion method after drywall is installed. The drywall would then need to be patched/painted. This is a difficult application on a ceiling and with blocking etc. allows for error/areas that aren’t able to be seen to be left uninsulated. Is spray foam of equivalent R-value acceptable?
Answer – The government has used this wall insulation system with success in the past. At the contractor’s option, the dense pack cellulose insulation called out in the wall and roof assemblies may be replaced with Roxul insulation in the same depths/thicknesses. Roxul provides an equivalent R-value per inch. Some of the cavity depths are larger than a single batt thickness and 2 batts may be required. Maintain the designated Spray in Place Urethane insulation against the metal siding and roofing as an air barrier and fill the remaining cavity space with Roxul.
13. Question: Does the sprinkler piping inside B384, B385 and B180 get painted?
Answer - Yes, per Section 099000, 1.2B -1. Painting includes field painting bare and covered pipes.
14. Question: Will Vermont Gas excavate and backfill for the new gas line to B327?
Answer – Assume trenching, prep work, and backfill will be required by the contractor. Gas pipe installation will be performed by VT Gas up to and including the meter.
15. Question: On B385 (B384?) S-1 it calls for 40psi and 60psi rigid insulation under the footings. Which one is correct?
Answer – Double checked calculations and found 40psi is adequate.
16. Question: On drawing P0.1 of Alter B-180, insulation of piping, valves, and fittings detail, there is mention of pre-molded fiberglass fittings. Please confirm if you are requiring HamFab fittings.
Answer – Yes we require pre-molded fiberglass fittings and PVC covers as per the insulation schedule in the specifications
17. Question: Same drawing and detail also states “wrap with fiberglass reinforcing cloth”, though on the insulation schedule, it requires PVC fittings. Please confirm what is required.
Answer – PVC is required per the specification schedule. The note shall be stricken from the detail.
18. Question: Where does CP-1 on drawing PO.1 drain to?
Answer – It does not appear that CP-1 is required in building B180 as the fan coil can make it to its termination point without additional lift.
19. Question: In order to coordinate with Vermont Gas, will you please provide Street addresses for each of the building #s 180 and 327?
Answer - Street addresses are:
B180: 126 NCO Drive B327: 145 NCO Drive
20. Question: At Buildings B-180 (Detail 16 on drawing A-7) & B-327 (Detail 9 on drawing -1), a Schluter Reno Ramp is shown at the overhead doors. The Reno Ramps are designated as K SS. What does the SS stand for? A Schluter’s representative has confirmed that they do not come in stainless steel only aluminum. Please clarify
Answer - Yes SS stands for Stainless Steel. Aluminum is acceptable.
21. Question: At Building B-180, Civil drawing C-1 shows a paved walk in front of door 100.1.
Architectural drawing A-1 does not show any walk. What is required at this location – are we removing the existing walk and restoring the lawn or are we removing walk for installation of ground loop and patching and infilling paved walk?
Answer - There is existing asphalt paving in front of door 100.1 as shown on X-1 and C-1.
Per the note on C-1 pointing to this area, saw-cut and remove the paving as required to install the grounding loop and restore paving.
22. Question: What are the weights of the different pieces of shop equipment being moved from B313 to B180?
Answer – The government does not have specific weights on each pieces of equipment. It is anticipated that the heaviest piece of equipment should not exceed 14,000 lbs.
23. Question: B384 Detail C/S-1: The shape and logistics of adding this new footer on top of the existing footer is going to be very tricky. It would require large excavation to saw-cut the existing footer horizontally and remove, and then custom formwork would be needed to achieve the new chamfer shape shown in the detail. To simplify the process, would it be acceptable to enlarge the entire footer down to the base, pinning into the sides of the existing and using a simple box formwork to create a new footer with outside dimensions of 12".
Answer – It is acceptable to use this alternative method which required the wall to extend down to the existing footing. Please note that the existing foundation, footing depth is unknown.
24. Question: B384 Detail A/S-1 and 1/S-1: Should new wall footing and foundation wall construction be completed in alternating sections to minimize disruption to existing and eliminate need for temporary shoring?
Answer – A shallow foundation at the new wall is used to minimize the depth of excavation needed. Means and methods are up to the contractor.
25. Question: B384 Detail 1, 2, 3/A-3: Please advise if the framing at the louver and fan openings can be done with steel girts in lieu of the specified 12 GA. steel studs as shown.
Answer – No. Please construct with 12 gauge stud framing as designed.
26. Question: The exterior walls call out for 1” of spray foam followed by 8 ¼” of dense pack.
Because the foam would act as a vapor barrier there would be excessive amounts of condensation on the surface of the foam. In turn creating mold and other issues. Either the foam needs to be in excess of 2 1/2” (R- 18.75) or the assembly would require a smart poly – Which way should this be proposed?
Answer - Increase the urethane thickness in the wall assemblies to 3” and fill the remainder of the cavity with either dense pack cellulose or Roxul insulation.
27. Question: The roof assembly will have the same issues as the walls, the R-value of the 2” of foam is not high enough to cause the dew point to fall inside the foam. I would suggest in the roof using just spray foam or at least R-49, would one of these suggestions be acceptable?
Answer - Increase the urethane thickness in the roof assemblies to 8-1/2” and fill the remainder of the cavity with either dense pack cellulose or Roxul insulation
28. Question: We noticed a change in Issued organization in Amendment #1. Please clarify to which address the bid needs to be hand delivered and more over let us know if we need to submit the names of the personnel and their details for the bid opening ceremony.
Answer – No Change to delivery location or procedures. Please comply with Solicitation Section 00100 Item 6 BID REPOSITORY AND BID OPENING found on page 13 of 46.
REMINDER – ALL QUESTIONS MUST BE SUBMITTED BY FRIDAY 26 JUNE 20 –
FIVE DAYS PRIOR TO BID OPENING DATE.
(End of Summary of Changes)