24B0004 QA_ Response_09.03.24.docx

DOCX document 27 KB Posted

Attached to
PSXE222005 Repair Bldg 90100 for Blue Horizons
Solicitation number
W50S98-24-B-0004
Issued by

About this file

This document appears to be a set of questions and answers (Q&A) related to a federal solicitation for the repair of Building 90100 for the Blue Horizons project, Solicitation Number W50S98-24-B-0004.

The Q&A provides clarification on various aspects of the project, including details about the ice maker and coffee maker, sliding glass door specifications, accessible signs, metal lettering, floor graphics, water distribution and storm drainage specifications, a mural wall, communications systems, fire protection, door and hardware schedules, and window shades. It also includes information about the curtain wall specification and interior storefront requirements. Overall, the Q&A addresses technical details and requirements for the construction project, which is being procured by the Tennessee Army National Guard.

View the file

Other files

File Type Posted
OF_1419.pdf PDF
24B0004 Sign In Sheet.pdf PDF
BIA notes 28D.pdf PDF
24B0004 QA 2_Response_09.12.24.docx DOCX document
24B0004 QA_ Response_09.12.24.docx DOCX document
Wall image.jpg JPG image
INDEX_rev1_09.12.24.pdf PDF
08 44 13 Glazed Aluminum Curtain Walls.pdf PDF
35-IT4.2.pdf PDF
36-IT5.1.pdf PDF
W50S9824B0004.pdf PDF
00-COVER.pdf PDF
27.01.00 - Computer and Telephone Wiring.pdf PDF
33-IT2.1.pdf PDF
Blue Horizons_Hardware Specification.pdf PDF
W50S9824B0004P0002.pdf PDF
Blue Horizons_Hardware Sets.pdf PDF
34-IT4.1.pdf PDF
Site-Visit Minutes 24B0004.pdf PDF
Pre-Bid Slides 24B0004.pptx PPTX presentation
Site Visit Sign In Sheet 24B0004.pdf PDF
W50S9824B0004P0001.pdf PDF
W50S9824B0004.pdf PDF
134th Repair Bldg 190 for Blue Horizons_Specifications_04.26.24.pdf PDF
W50S9824B0004.pdf PDF
134th Repair Building 90100 for Blue Horizons_Drawings_4-26-24.pdf PDF
Construction SOW PSXE222005 Repair Bldg 90100 for Blue Horizons rev1.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSXE 222005 Repair Building 90100 for Blue Horizons W50S98-24-B-0004 Q&A 19 August 2024

1. On drawing A7.1 detail 1, A7.1 under counter icemaker is listed as well as detail 2, A7.1 which lists a coffee maker. Are the purchases of these items included or not included in this requirement?

The ice maker and coffee maker will be furnished under a separate contract. Contractors are not to purchase these items.

2. Drawing A6.1 detail 3 A6.1 item D3 is a sliding glass door. Please provide a drawing detail and or manufacturer basis of design. Also, is the door manual or electric operated?

The basis of design is Kawneer 990 sliding doors and they are manual.

3. Drawing A0.2 detail 2 A0.2 lists accessible signs/pictograms. Sign locations note 1 and 2 is not clear. Note three speaks of the Building Directory. Is a new directory to be provided or is the current one to be updated? Also, there is not a sign schedule listed for these items or other room numbers for the facility.

These signs are part of our general notes and do not apply to this scope of work.

4. Drawing A7.1 detail 3 A7.1 requires metal lettering – what type of metal? Are the letters to be painted, if so what colors? Are they to be standoff type or require a depth?

Provide powder coated aluminum letters ½” thick on standoffs.

5. Drawing A1.1 entry vestibule requires an applied floor graphic. What are the size, color and material expected to be used? Does this overlay on the LVT?

This is an applied graphic made of high traffic rated polyvinyl. It should be blue to match the provided logo below. The rough dimensions are 7’x7’.

6. Specifications lists Division 33 11 00 – Water Distribution System, Division 33 30 00 – Sanitary Sewer System and Division 33 40 00 – Storm Drainage Facilities; however, there are not any Civil Drawings. Please provide clarification.

Please disregard Water Distribution and Storm Drainage Facilities Specifications unless work requires

7. Drawing A4.2 detail 1 A4.2, depicts a mural wall, is this to be provided in the requirement? If so, please provide detail/drawing.

Provide price for custom printed vinyl wall covering for noted walls.

8. Drawing E3.1 Communications Specification – this drawing references complete system of rough-in; however, there are no communications drawings. Only reference made to communications is for existing outlets on E1.2 to remain. Is there a new system to be put in place?

See attached the complete Drawing Set with Comm Drawings IT2.1, IT4.1, IT4.2, and IT5.1. Additionally, Please find attached the Specification Section 27 01 00 which accompanies the Drawing sheets.

9. During review of this project, it has been noted there are no Fire Protection Drawings. Is this correct?

Correct. The existing building is not sprinklered, and it is not required to be sprinklered per 2018 IBC 903.2.

10. The door and frame schedule on sheet A6.1 does not list the Hardware set number nor is there a hardware schedule in the specifications. We will need the hardware schedule and the door and frame schedule showing which set goes in what door.

Please find attached the Hardware specification and the Door and Frame Schedule.

11. There is a note on sheet A6.1 General Glazing Notes that states “Provide Window Shades To Match Base Standard Coordinate with COR. There is no specifications for window shades and we will need the specifications to properly price window shades.

Sunshadow, 3000 Net Solar Screen Fabric. Color: Charcoal, 1% openness. Manual operation.

https://www.rolleaseacmeda.com/us/products/fabric-detail/3000-net_us

27 August 2024

12. Drawing A6.1 detail 1/A6.1 elevations A and B call for curtainwall (correctly). However, there is no curtainwall specification provided. Is one available?

See attached new specification Section 08 44 14 – Glazed Aluminum Curtain Walls.

13. Views 6 and 7 on sheet 6.1 are labelled as interior storefront sections (applicable to storefront elevations E and F). The sections are shown with 1" insulated glazing, which is appropriate for exterior storefront. For interior storefront, center-set storefront with 1/4" glazing is more typical. Please clarify whether the interior storefront elevations (E and F) require 1" insulated glazing E and F should be center-set storefront with ¼” glazing.

14. The are no door hardware sets listed for the storefront doors except for paragraph 2.5 in the storefront specification. While these sets seem appropriate for exterior doors, this hardware does not seem appropriate for the interior doors (103, and 114 -118). Please clarify hardware requirements for these interior doors.

Please find attached the Hardware specification and the Door and Frame Schedule.