This document contains answers to questions regarding electrical specifications for a building repair project. The project involves repairing Building 408 Dormitory for the Tennessee Army National Guard. Metal clad, armored, and nonmetallic sheathed cables cannot be used except for light fixture whips and service entrance. SE and USE cables are permitted only for the service entrance from the pad mounted transformer to the main switchboard through existing underground conduits. The mechanical room cabinets must be NEMA 12 rain tight with welded conduit hubs. Portable fire extinguishers are not required. The building will be unoccupied during construction. The CQC Manager can also serve as the SSHO if qualified for both roles. Existing fiber and copper telecommunications lines will be back pulled to manhole MH-14 and reinstalled with new equipment once construction is complete. All communications wiring is part of CLIN-002.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 5.pdf | ||
| Abstract of Offers 20B7001 Signed.pdf | ||
| Revised Detail B1 A-501.jpg | JPG image | |
| RFI Roof Insulation Revision.pdf | ||
| Amendment 3.pdf | ||
| Revised Finish Materials Legend 11-15-19.png | PNG image | |
| Amendment 2.pdf | ||
| Questions 36-40.pdf | ||
| 23 07 00.pdf | ||
| Amendment 1.pdf | ||
| Questions 34-35.pdf | ||
| Question 11-33 Answered.pdf | ||
| Prep-Bid_Minutes_W50S98-20-B-7001.pdf | ||
| Sign_in_Sheet_Page_2_of_2.pdf | ||
| Sign_in_Sheet_Page_1_of_2.pdf | ||
| Pre-Bid_Slides.pdf | ||
| W50S98-20-B-7001_Solicitation.pdf | ||
| Repair_B408_-_Specifications.zip | ZIP file |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 1. Specification 26 20 00 3.1.3.2 indicates Metal clad Cable. Can Metal clad be used in walls and in ceilings on this project?
Answer 1. 26 20 00 3.1.1 indicates to provide insulated conductors installed in rigid steel conduit, IMC, rigid non‐metallic conduit, or EMT except where specifically indicated or specified otherwise or required by NFPA 70. Type MC would be permitted for light fixture whips, concealed install only.
Question 2. Specification 26 20 00 3.1.3.3 indicates Armored Cable. Can Armored Cable be used in walls and in ceilings on this project?
Answer 2. 26 20 00 3.1.1 indicates to provide insulated conductors installed in rigid steel conduit, IMC, rigid non‐metallic conduit, or EMT except where specifically indicated or specified otherwise or required by NFPA 70. Type AC cable is NOT permitted.
Question 3. Specification 26 20 00 3.1.9 indicates Nonmetallic Sheathed Cable Installation. Can
Nonmetallic Sheathed Cable Installation be used in walls and in ceilings on this project?
Answer 3. 26 20 00 3.1.1 indicates to provide insulated conductors installed in rigid steel conduit, IMC, rigid non‐metallic conduit, or EMT except where specifically indicated or specified otherwise or required by NFPA 70. Type Nonmetallic Sheathed cable is NOT permitted.
Question 4. Specification 26 20 00 2.7.5 indicates SE and USE cables. Can SE and USE cables be used on this project?
Answer 4. Per this spec section, the type SE and USE cables can ONLY be used for service entrance (pad mounted transformer to main switchboard). The service entrance is in existing underground conduits therefore Type USE would be used. Install per NEC 2017.
Question 5. Specification 26 20 00 2.13.1.d indicates Basement Mechanical Room cabinets: NEMA 12 rain tight with conduit hubs welded to the cabinet. Is MDP required to be NEMA 12 rain tight? Is MDP required to have hubs welded to the cabinet.
Answer 5. In mech room, provide NEMA 12 electrical enclosures installed per NEMA 12 requirements.
Raintight and welded hubs is from a NEMA 3R or 4, etc and is a typo. Mech room has so much water piping, NEMA 12 will help protect if there is a leak.
Question 6. The drawings nor specifications calls for fire extinguishers and cabinets
Answer 6. Portable fire extinguishers are not required.
Question 7. Will the building be occupied or unoccupied while construction work is being performed?
Answer 7. The building will be unoccupied.
Question 8. Can the CQC Manager also serve as the SSHO?
Answer 8. Yes it is allowed, as long as that person meets the requirements for both of the positions as defined in Specifications Section 01 35 26, Section 1.7.1.1.1
Question 9. The note on Drawing T-0001 , indicates to demo the telecommunications back to the nearest manhole. We do not see a manhole on any of the site drawings. Please provide / verify this location.
Answer 9. The contractor will be responsible for getting a communications company to back pull the existing fiber and copper to the manhole (MH-14) behind 408. Once the construction is done the Contractor will have a communications company re-install the Fiber and copper into the building with new termination equipment.
Question 10. The above work (referencing question 1) and all interior wiring shall be part of CLIN-002.
Please verify.
Answer 10. All communications wiring shall be part of CLIN-002.