This document is an amendment to a solicitation for a construction project. The amendment incorporates forty questions and answers regarding project requirements and specifications. It also updates the wage determination to the latest version. Key details include that the project involves repair and renovation work at Building 408 Dormitory at the Tennessee Army National Guard facility. The scope of work includes electrical, telecommunications, plumbing and HVAC upgrades. The amendment must be acknowledged by April 14, 2020. The wage determination is modified and includes laborer and operator wage rates.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers 20B7001 Signed.pdf | ||
| RFI Roof Insulation Revision.pdf | ||
| Amendment 3.pdf | ||
| Revised Detail B1 A-501.jpg | JPG image | |
| Amendment 2.pdf | ||
| Questions 36-40.pdf | ||
| Revised Finish Materials Legend 11-15-19.png | PNG image | |
| 23 07 00.pdf | ||
| Amendment 1.pdf | ||
| Questions 34-35.pdf | ||
| Question 11-33 Answered.pdf | ||
| Questions_1-10_Answered.pdf | ||
| Prep-Bid_Minutes_W50S98-20-B-7001.pdf | ||
| Sign_in_Sheet_Page_2_of_2.pdf | ||
| Sign_in_Sheet_Page_1_of_2.pdf | ||
| Pre-Bid_Slides.pdf | ||
| W50S98-20-B-7001_Solicitation.pdf | ||
| Repair_B408_-_Specifications.zip | ZIP file |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSXE122006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REASON FOR AMENDMENT: To incorporate 40 questions and new w age determination.
1. This amendment adds questions 1-40 that w ere posted to FBO during solicitation. Questions 1-40 are hereby incorporated into this amendment
2. This amendment updates the w age determination to TN20200001 01/03/2020
3. This amendment must be acknow ledged by 14 April 2020 at 10:00 AM EST
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9820B7001
X 9B. DATED (SEE ITEM 11)
17-Oct-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Apr-2020
CODE
134TH ARW CONTRACTING OFFICE (FA6423)
134TH ARW CONTRACTING OFFICE
123 BRISCOE DRIVE
LOUISVILLE TN 37777-6227
W912L7 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S9820B7001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTION AND ANSWERS
Question 1. Specification 26 20 00 3.1.3.2 indicates Metal clad Cable. Can Metal clad be used in walls and in ceilings on this project?
Answer 1. 26 20 00 3.1.1 indicates to provide insulated conductors installed in rigid steel conduit, IMC, rigid non‐metallic conduit, or EMT except where specifically indicated or specified otherwise or required by NFPA 70. Type MC would be permitted for light fixture whips, concealed install only.
Question 2. Specification 26 20 00 3.1.3.3 indicates Armored Cable. Can Armored Cable be used in walls and in ceilings on this project?
Answer 2. 26 20 00 3.1.1 indicates to provide insulated conductors installed in rigid steel conduit, IMC, rigid non‐metallic conduit, or EMT except where specifically indicated or specified otherwise or required by NFPA 70. Type AC cable is NOT permitted.
Question 3. Specification 26 20 00 3.1.9 indicates Nonmetallic Sheathed Cable Installation. Can Nonmetallic Sheathed Cable Installation be used in walls and in ceilings on this project?
Answer 3. 26 20 00 3.1.1 indicates to provide insulated conductors installed in rigid steel conduit, IMC, rigid non‐metallic conduit, or EMT except where specifically indicated or specified otherwise or required by NFPA 70. Type Nonmetallic Sheathed cable is NOT permitted.
Question 4. Specification 26 20 00 2.7.5 indicates SE and USE cables. Can SE and USE cables be used on this project?
Answer 4. Per this spec section, the type SE and USE cables can ONLY be used for service entrance (pad mounted transformer to main switchboard). The service entrance is in existing underground conduits therefore Type USE would be used. Install per NEC 2017.
Question 5. Specification 26 20 00 2.13.1.d indicates Basement Mechanical Room cabinets: NEMA 12 rain tight with conduit hubs welded to the cabinet. Is MDP required to be NEMA 12 rain tight? Is MDP required to have hubs welded to the cabinet.
Answer 5. In mech room, provide NEMA 12 electrical enclosures installed per NEMA 12 requirements.
Raintight and welded hubs is from a NEMA 3R or 4, etc and is a typo. Mech room has so much water piping, NEMA 12 will help protect if there is a leak.
Question 6. The drawings nor specifications calls for fire extinguishers and cabinets Answer 6. Portable fire extinguishers are not required.
Question 7. Will the building be occupied or unoccupied while construction work is being performed?
Answer 7. The building will be unoccupied.
Question 8. Can the CQC Manager also serve as the SSHO?
Answer 8. Yes it is allowed, as long as that person meets the requirements for both of the positions as defined in Specifications Section 01 35 26, Section 1.7.1.1.1 Question 9. The note on Drawing T‐0001 , indicates to demo the telecommunications back to the nearest manhole. We do not see a manhole on any of the site drawings. Please provide / verify this location.
Answer 9. The contractor will be responsible for getting a communications company to back pull the existing fiber and copper to the manhole (MH‐14) behind 408. Once the construction is done the Contractor will have a communications company re‐install the Fiber and copper into the building with new termination equipment.
Question 10. The above work (referencing question 1) and all interior wiring shall be part of CLIN‐002.
Please verify.
Answer 10. All communications wiring shall be part of CLIN-002.
Question 11. The drawings indicate to lift the slab and inject polyurethane foam to stabilize the slab.
a. We do not understand lifting the slab. Please clarify.
b. We have used pressure injection grout to stabilize a settling subgrade, but not polyurethane foam. We do not believe this is structural.
c. We suggest removing the slab in this unit to observe the failing condition and remove any bad soil and replace with flowable fill, and new slab.
Answer 11.
a. The slab on grade has experienced differential settling at the building corner and requires lifting.
b. Per the geotechnical engineer, polyurethane foam is an expansive material that will lift the slab during injection.
c. If removal of slab, regrading, and slab placement is preferred, a demo plan and slab design will be required to be submitted prior to performing any work.
Question 12. The drawings nor specifications calls for fire extinguishers and cabinets nor is stair tread covers called for. Spec. section 122100 Window Shutters is specifying blackout blinds as provided in building 406. It was my understanding that building 408 was to have horizontal or vertical blinds.
Please let us know of any changes to the scope of work in your next amendment.
Answer 12. Fire extinguishers are not required by the UFC’s when the facility is equipped with fully approved sprinkler and mass notification systems. In addition, the base specifically requested they not be included in the project as they are a maintenance issue in that building. Stair tread coating is specified in Section 09 67 23.13 Standard Resinous Flooring. Blackout shades are not mentioned in the drawings or specifications. Section 12 21 00 Window Shutters refers to horizontal polysatin plantation‐type shutters.
Question 13. There are horizontal expansion joint covers shown at the elevator addition. There is no vertical expansion joint covers shown at the 2” brick joints at the elevator addition. There is no specifications for the expansion joint covers. Please clarify if vertical expansion joint covers are required and provide specifications.
Answer 13.
‐ 2” horizontal floor expansion joints (conc. slab to conc. slab) shall be equal to Balco ES‐200 series with GF‐2P mill finish aluminum saddle plate.
‐2” vertical wall expansion joints (brick to cmu or brick to brick where walls are flush) shall be equal to Balco FCVS‐2‐SIL.
11. 2” vertical wall expansion joints (brick to cmu or brick to brick where walls form an inside corner) shall be equal to Balco FCVSE‐2‐SAN.
‐2” metal soffit ceiling expansion joints (new metal soffit panels to existing brick veneer) shall be equal to Balco ACWC‐2.
‐GC to submit samples for color selection.
Floor and ceiling expansion joints shall occur on all three floors where the new elevator breezeway connects to the existing open‐air south stair tower. Wall expansion joints shall occur on all three floors where the new elevator breezeway brick column wraps are adjacent to the existing brick veneer at the open‐air south stair tower and shall be located on each side of the new brick wrapped steel columns Question 14. Is this project sales tax exempt?
Answer 14. No Question 15. Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations.
Answer 15. Yes, however, email should also be utilized for RFI, Submittal, etc. delivery.
Question 16. Who is the fire alarm servicer on site and specifically on the building?
Answer 16. Simplex Question 17. Who is the DDC integrators who the new Mechanical system will tie in to?
Answer 17. Currently B408 ties into the Barber Coleman system. However, currently a project is in design using the bases of Schneider Electrical (T.A.C./Invensys System) as the bassis of design.
Question 18. We are not finding any drawings released on the FBO links/ Files.
Answer 18. As stated in the solicitation, please email TSgt Maxwell for drawings.
Question 19. Once released, will the Gov allow more time for RFIs to be submitted?
Answer 19. Once the contract is awarded the contractor will be able to submit RFIs throughout the project when needed.
Question 20. Is there any asbestos, lead based paints or any other hazardous materials to be abated?
Answer 20. No Question 21. Is there a Hazardous material test report available?
Answer 21. No, the building was constructed in 1993.
Question 22. Drawing T‐001 Telecommunications Outside Plant Cabling Notes No.1 and 2.Is the existing fiber 12 Strand Single Mode. Please provide characteristics of existing fiber and copper.
Who is responsible to provide testing of existing fiber and copper prior to pulling back to(MH‐14) behind
408. Who is responsible to provide testing of existing fiber and copper after pulling from (MH‐14) behind 408 to building. Will the surge protection equipment used for the original 200pr. terminations be saved to be reinstalled.
Answer 22. Leave the existing OSP copper and fiber in place including surge protection. Base comm would be responsible for retesting and commissioning of the existing cable upon completion of construction. Any damage to the cable due to construction would be the responsibility of the contractor.
Question 23. A. All equipment racks shown on drawings are wall mounted and not in a rack. B. Please confirm if a wall mounted swing rack is be installed in the MDF.
Answer 23. A. This is correct. The existing telecom rooms were too small to accommodate a rack and still maintain minimum clearances on 3 sides. A floor mounted cabinet which also secures to the wall was used to allow for these clearances. B. There is not room for a cabinet or a rack. In its place there will be a 4U wall mounted fiber patch panel/splice. A 12 ST SM and a 6ST MM will be installed to each TR.
The initial design had a 6SM/6MM but the UFC requires a minimum of a 12 SM fiber. These cables will need to be separate cables and not a hybrid.
Question 24. A. Conduit and sleeves are not shown on drawings.
Is there existing conduit and/or sleeves installed between the MDF and communication rooms A121, A221 and A321. B. Is there existing conduit and/or sleeves installed between the cable tray on each floor.
Answer 24. A. These conduits are shown on the electrical drawings. B. There should be cable tray down the corridor in front of the telecom room. The tray should penetrate the TR on each floor except the basement.
Question 25. Drawings do not indicate cable tray or conduit from corridor to comm rooms. What is to be provided from corridor cable tray to communications room?
Answer 25. See answer above. This needs to be added. Cable tray should extend down corridor and penetrate the TR.
Question 26. On drawing T‐106 detail D1 12 ST SM FOC WITH MESH INNERDUCT FROM MDF‐1 TO IDF1,2 AND 3. Please provide mesh innerduct and type specification. Example: MAXCELL with 1 cell, 2 cell or 3 cell. And 1 Inch, 2 inch or 3 inch ECT.
Answer 26. We can’t specify manufacturer on Government projects. 3‐cell in an empty conduit. 1‐inch corrugated innerduct is also acceptable for the riser as long as the conduit is maxed out with the innerduct during installation. Example: 4‐inch duct receives four (4) 1‐inch corrugated innerducts.
Question 27. Drawings T‐110, T‐120 and T‐130 Detail A1 shows 6 SM/6 MM FOC. , however specification 271000 section 2.3.1.2 shows 12 ST SM. Please confirm what type of fiber is to be used.
Answer 27. 12 SM 6 MM to each comm room from the Basement. This is a change from a 6SM/6MM.
UFC requires a minimum of a 12 SM for building backbones.
Question 28. Specifications indicate plenum rated cabling for horizontal and backbone cabling.
Please clarify if cabling is to be plenum rated.
Answer 28. Plenum rated cabling will be used for all horizontal cabling. Backbone cabling does not have to be since it will be in the conduit riser between the floors.
Question 29. On drawing T‐502 Detail B1 indicates conduit bonding to cable tray, however Detail B2 indicates the conduit stubbed up. Are we to run and bond all conduits to cable tray.
Answer 29. These details show two different scenarios that could arise in a retrofit situation. All conduit should be installed back to the cable tray. In rare instances where that is not possible, then a stub up conduit is allowed as long as it is less than 50 feet away from the tray. J‐hooks or other approved cable supports can be used for the transition.
Question 30. On drawing T‐106 Telecom General Notes R. refers to a drawing ED‐103 that was not provided. Please provide drawing ED 103 for review.
Answer 30. There is not a T‐106 in the drawing set. T‐001 has the General notes. The referenced note pertains to the electrical demo drawings as a reference. Just disregard that comment and reference the TD drawings within the telecom set. They are the same thing.
Question 31. I noticed on page 516, 1.7.1.2 that the casework for this job is supposed to be manufactured with FSC material. Are you requiring that all Cabinets be supplied by a Certified FSC Chain of Custody Fabricator? And supply all appropriate paperwork for LEED points?
Answer 31. Yes, all wood provided on the project shall be certified by FSC Chain of Custody or other similar third‐party program, however LEED points are not required. Submit sustainable wood certification data with copies of invoices bearing certification numbers in accordance with Section 01 33
29 SUSTAINABILITY REPORTING.
Question 32. The plumbing specifications sect. 22 00 00, 3.1.2.4 paragraph a, page 22 , reference soldered joints shall be made with flux and are only Acceptable for piping 2 inches and smaller. What types of joints will be accepted larger then 2 inches, excluding press connections.
Answer 32. All plumbing piping 3” and smaller shall be copper per Table II and 3.1.2.4 should be “piping 3 inches and smaller” not 2”.
Question 33. enlarged standard and ADA floor plans on sheet A‐401 is showing tile floors in all toilets.
The finish schedule on sheet A‐610 is calling for a poured floor 1 (TNEMEC) floor. Please verify which flooring product is to be used.
Answer 33. All toilet rooms labeled 'TLT' on the Room Finish Schedule on sheet A-610, except for toilet room A105, shall have Ceramic Floor Tile 1 (CFT1), not Poured Floor 1 (PF1) as currently noted. CFT1 shall be 6"x12" unpolished porcelain tiles on the main portion of the floor, and the shower stall floors shall be 2"x2" unpolished mosaic porcelain tiles. Toilet room A105 shall remain with a Poured Floor (epoxy resin). Disregard the floor, base, wall, ceiling and miscellaneous material legends on sheet A-610. Revised finished material legends will be issued
NLT 11-14-19.
Question 34. WP-1 (Wall protection – Rail) is called out on sheet A-610 in the Miscellaneous Finish Material Legend. However, the WP-1 does not show up on the Room Finish Schedule for any room. Sheet A-301 / B-1 Building Section shows a product that appears to be a chair rail or a wall protection rail but it is unclear where the product goes and what the product is. Specification section 066116 is specifying a solid polymer product but does not say it is for the Wall Protection Rail. Please clarify product material and where wall protection rails are to be installed.
Answer 34. Refer to General Sheet Notes #13 on all three floor plan sheets. The note refers to the use of Continuous Wall Guards as shown on Sheet A-001. On Sheet A-001, under Control Joints, Fixtures and Devices, a note at the far-right points to the Wall Rail and states "Install Bumper Guards at all Corridors and Lounge Areas". Revise this note to read "Install 4-inch tall x 3/8 inch thick Wall Protection Rails at all Corridors and Lounge Areas at the height indicated". Specification Section 06 61 16 describes the solid polymer product to be used as Wall Protection Rails (WP-1). Disregard the Material Legends Chart on Sheet A-610. It will be revised and distributed NLT 11-15-19.
Question 35. Can you give us some direction on the factory finishing specification for the millwork in Section 06410 Custom Cabinets ? The finish system typically utilized for this type of project would be the AWI Systems 2,3,or 5 with the required defect sanding prior to stain and sealer and sealer sanding before top coats . These are the type finishes utilized on previous TANG project Bldg
406. Please advise Answer 35. Specifications Section 06 20 00, Finish Carpentry:
Part 2.1.6, Hardwood Plywood: Concerning the apparent scarce availability of lumber core hardwood plywood specified in this section, approval is given to use Combination Core hardwood plywood. The plywood shall consist of a center veneer core and a crossband veneer on both sides of the center with a layer of Medium Density Fiberboard (MDF) under the face and back veneer. Face and back veneers shall be rotary cut maple or birch of 3/32 inch thickness.
Part 2.2, Countertops; Subpart 2.2.1, Solid Surface: Delete reference to Section 06
61 16, Solid Polymer Fabrications and instead use Section 12 36 00, Vanity Countertops, Window Sills and Chase Countertops.
Part 2.6.2.1, Cabinet Hardware: Delete Subpart (a.) regarding European style concealed hinges. Instead insert the following: Hinges shall be five (5) knuckle, 2.75”, grade 1, type 304 stainless steel for all hinged doors. Two hinges for doors 4 feet in height or less and three hinges for doors over 4 feet in height.
Part 2.6.2.1, Cabinet Hardware: Under Subpart (e.) Include the following: Lockable hasps as located on the drawings for the room dividers on sheet A-410 shall be equal to Hafele America Co. part number 235.17.200 with matte nickel finish.
Part 2.6.2, Cabinets, Aprons and Room Divider Millwork: Include the following at the end of the paragraph: Drawer boxes shall be fabricated of ½ inch solid birch, 9/16” Baltic birch or maple plywood with dovetail joints at all four corners. Drawer bottoms shall be ¼” tempered hardboard, birch or maple hardwood plywood, set in to ¼ inch grooves on all four sides with hot-melt glue. Drawer heads shall be replaceable in case of damage and attached to the drawer boxes with wood screws.
Part 3.3.1, Countertops: Delete reference to Section 06 61 16, Solid Surfacing
Fabrications and instead reference Section 12 36 00, Vanity Countertops, Window Sills and Chase Countertops.
The balance of Specifications Section 06 20 00 still applies.
Drawing sheet A-410, Millwork Elevations B1 & B3:
Apply the requirements for ¾ inch x ¾ inch stainless steel open shelf protective angles indicated in Elevation B3 to the open shelving in Elevation B1. ALL open shelves in the Room Divider Millwork shall have this protection applied to the bottom shelf front lip.
Specifications Section 12 36 00, Vanity Countertops, Window Sills and Chase Countertops:
Part 2.2, Subpart 2.2.1, Vanity Countertop and Backsplash: Delete the requirement for 0.094 inch thick material and replace with 1.125 inch thick. Chase countertops and window sills shall remain at 0.75 inch thick.
Part 2.2.1.1, Solid Polymer Countertops: Delete the requirement for 0.094 inch thick material and replace with 1.125 inch thick. Chase countertops and window sills shall remain at 0.75 inch thick.
A verbal question was posed regarding the vented attic as it relates to heating and cooling loads. Our mechanical engineers verified that the FCU’s on the 3rd floor have been sized to account for the additional heating and cooling loads from the vented attic.
Therefore, the attic shall remain vented, and the thermal envelope formed by the rigid insulation placed on the new sloping metal trusses and decking shall remain as designed.
36. Question 36. Per specifications section 21 13 13.00 10 Wet Pipe Sprinkler System, the sprinkler system is to be a wet pipe sprinkler system in all areas of the building. The elevator pit and top of shaft must be protected by the same supply pipe and must be an antifreeze filled system. Is the governments intent to have the entire fire suppression system to be an antifreeze filled system or just an anitifreeze system above the elevator pit and top of shaft? Would the government consider using a dry pipe system in lieu of the antifreeze filled system?
Answer 36: Please see design drawings, an antifreeze system is shown in the drawings and referenced in the specifications for application in the elevator pit. Elevator machinery is located in the pit. Dry pipe sprinkler systems are not preferred in this application. If the contractor can prove the dry pipe is a significant saving it can be considered. Please note the UFC requires Nitrogen Generators for all dry pipe systems.
37. Question 37. The windows specified on the project do not seem to require blast loading but the exterior doors do require blast loading requirements. Is this the government’s intention to not have blast loading requirements on the windows of the project, specifically the first floor windows?
Answer 37: The latest version of UFC 4‐010‐01, DoD Minimum Antiterrorism Standards, dated 12 December 2018 no longer requires door and window framing systems to be anchored to the surrounding wall systems for blast protection when the facility is within a protected perimeter fence and is a minimum distance away from said fence. The only requirement is that the glazing for ALL replacement exterior doors and windows must be blast resistant by utilizing laminated glass on the innermost pane of insulated glazing systems and to have a glazing frame bite in accordance with ASTM F 2248. Specifications Section 08 81 00 Glazing describes the types of systems required for exterior windows and doors, however, include the ASTM frame bite requirement noted above to this specification section as the section does not currently state this requirement.
38. Question 38. Sheets T‐110, T‐120, and T‐130 show cable tray running throughout the corridors.
Sheets T‐502 and T‐503 show details for the cable trays as far as conduit connections and fire rated pass throughs, however there is not a sheet or a specification as to what size and type of tray are required.
The specifications have a general description of both ladder and basket type cable tray, but once again a specific type or cut sheet is not available. We need to know what is specified so that we can get the right type/size of tray quoted.
Answer 38: The cable tray needs to be 12” x 2” wire basket tray designed for low voltage network cabling. The ladder runway is typical 12‐inch ladder runway. We cannot specify a specific manufacturer on Federal projects so we have to keep the specifications generic. Although, the tray and runway sizes are included on the drawings.
39. Question 39. Sheets E‐601, E‐620, E‐630, and E‐631 do not indicate the 480‐120/208V 3P 4W panel MDP as being new. It does indicate that we are to re‐use the existing secondary raceways and pull in new conductors as indicated on the 1‐line diagram. What is not shown is the actual footage of the existing raceways. The electrical drawings refer us to sheet C‐101 for a location of the existing utility transformer and the existing 800A MDP. Although both items are clearly visible, we still need to know the footage of the secondary raceways because sheet C‐101 does not show us how or what path these secondary raceways are ran. Also, just want to confirm that panel MDP is existing and to remain. None of the previously mentioned E‐sheets indicate that this is to be a new 800A MDP. The only new 800A panel shown is MDP‐1.
Answer 39:
1. Provide a new MDP. See all demo sheets for General Note C. E‐601 does state MDP “LOCATED IN…”, this should state “LOCATE IN….”.
2. Provide secondary conductors, transformer, MDP, etc., per drawings. The existing B408 As‐Builts do not indicate the existing secondary underground ducts from transformer to existing MDP. The new transformer and associated new pad will be located in the same location as the existing pad mounted transformer and the new MDP will be in the same location as the existing MDP. Estimate length based on location of transformer and MDP and add footage for ends and assume a depth.
40. Question 40. Sheets AL‐110, AL120 & AL130 shows wall tags as TYPE DC, this wall is between Bedroom & Dayroom. Enlarged Standard Dorm Plans with Tags Detail B2/A‐401. Show those same walls as TYPE AA. Which wall type is correct?
Answer 40: All walls between the dorm rooms and the lounge and corridors are to be type DC. The wall tag show on the ‘Enlarged Standard and ADA/ABA Dorm Plans with Wall Tags’ between the rooms and the lounge noted as type AA is incorrect.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
"General Decision Number: TN20200001 01/03/2020
Superseded General Decision Number: TN20190001
State: Tennessee
Construction Type: Heavy Flood Control
Counties: Tennessee Statewide.
RIVER, HARBOR AND FLOOD CONTROL PROJECTS ON THE MISSISSIPPI
RIVER AND TRIBUTARIES (excluding any contracts for any phase of construction of a Lock and Dam) EXCEPT THE METROPOLITAN AREAS
OF MEMPHIS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020
SUTN2010-001 09/01/1997
Rates Fringes
CARPENTER........................$ 7.25
Laborers:
Air Tool Operator...........$ 7.25
CHAIN SAW OPERATOR OR FILER.$ 7.25
REVETMENT & DIKES...........$ 7.25
UNSKILLED...................$ 7.25
Power equipment operators:
ASPHALT PLANT DRYER OPR.,
ASPHALT DISTRIBUTOR,
ASPHALT ROLLER, BULLDOZER
(ROUGH, INCL. DISC, PLOW,
OR ROLLER), MOTOR PATROL
(HAUL ROADS), TRENCHING
MACHINE (18"" & UNDER),
SELF-PROPELLED ROLLER
(EXCEPT ASPHALT, END DUMP
EQUIP. (OFF HIGHWAY),
MIXER (CONCRETE UP TO 21
CU. FT.), BOTTOM DUMP
EUCLIDS (AND LIKE
EQUIPMENT)..................$ 7.25 .05
BULLDOZER (FINISHER, PUSH
CAT & ON BARGES), MOTOR
PATROL FINISHER, SCRAPER &
LIKE EQUIP., FRONT END
LOADER, BACKHOE TRACTOR
MOUNTED) ASPHALT FINISHER
OR SPREADING MACHINE, WELL
POINT SYSTEM OPR., SELF
PROPELLED LOADER (CONVEYOR
TYPE).......................$ 7.25 .05
FIREMAN (HEAVY
CONSTRUCTION), PILEDRIVER,
LEADSMAN, WINCHMAN..........$ 7.25 .05
OILER, PUMP, GREASER,
TRACTOR (FARM TYPE INCL.
DISC, PLOW OR ROLLER).......$ 7.25 .05
PILEDRIVER OPR., MECHANIC
(HEAVY EQUIP.), CRANES,
DERRICKS, DRAGLINES,
WELDER, POWER SHOVELS &
BACKHOES, MIXER (CONCRETE,
21 CU. FT. & OVER),
ASPHALT PLANT OPR.,
TRENCHING MACHINE (OVER
18"")........................$ 7.75 .05
Truck drivers:
1 1/2 TONS OR LESS..........$ 7.25
OVER 1 1/2 TONS.............$ 7.25
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .