Attachment 5 - Form 3 Paint Booth BLDG 1046.pdf
PDF 1 MB Posted
- Attached to
- ADAL Corrosion Control Facility Federal contract opportunity
- Solicitation number
- W50S9525BA001
- Issued by
- Department of the Army National Guard
About this file
This document is a Hazard Abatement Plan for a paint facility within a maintenance squadron, dated 11 APR 2006. The plan identifies serious ventilation deficiencies in rooms 8 and 9 of building 1046, where the paint booth does not adequately draw paint vapors away from workers, creating significant health and fire hazards. Interim control measures include mandatory full face respirator use, ensuring all doors remain open for ventilation, and reducing spraying applications until the facility can be repaired/renovated.
The project has a total cost of $3,000,000, with an estimated completion date of 30 SEP 2020. The project is currently in the design phase, with the functional manager being Christopher A. Gamble from the 169 Maintenance Squadron. The abatement plan classifies the hazard as a Risk Assessment Code (RAC) 2 - Serious, with a severity level of II and a probability of "B" (Probable will Occur in Time). The primary objective is to submit the project through Civil Engineering to repair and renovate the paint facility to meet current codes and requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Bid Conference Information.pptx | PPTX presentation | |
| Pre-Bid Conference Roster.pdf | ||
| W50S9525BA0010002 - Amendment 02 SF 30.pdf | ||
| Attachment 3 - Questions and Answers.pdf | ||
| Attachment 4 - Hazardous Material Survey - 2019.pdf | ||
| W50S9525BA0010002 - Conformed through Amendment 02.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3000000
Wash/fuels/paint facility
14285.71
Facility
In Design
11 APR 2006
2 (14285.71)
Christopher A. Gamble
Health
3000000
30 SEP 20203000000
2(II,B) - Serious
Submit through CE to repair / renovate the paint facility in full to meet current codes/requirements.
O&M
II,B = 21.0II
Christopher A. Gamble
(312) 583-8342
In Design
2 - Serious
B - Probable will Occur in Time
Full face respirators must be worn and all doors open for ventilation. Reduce (if possible) spraying applications until system/facility is repaired/renovated.
169 Maintenance Squadron
Inspection
(312) 583-8342
11 APR 2006
The structural Maintenance paint booth does not meet the requirement for the ventilation system. It does not adequately draw the paint vapor away from the individual working in the area. This creates a serious health and fire hazard. Ventilation in rooms 8 and 9 of building 1046 does not function properly. Air flow in ventilation system in room 8 was found to be low and no air flow in room 9 during the ventilation survey.