Questions and Answers 3.3.2023.pdf
PDF 1 MB Posted
- Attached to
- Construct F16 Mission Training Center Federal contract opportunity
- Solicitation number
- W50S95-23-B-0001
- Issued by
- Department of the Army National Guard
About this file
This is a solicitation for construction services to demolish an existing building and construct a new Mission Training Center at McEntire Joint National Guard Base in South Carolina. The base bid includes demolishing building 958 and constructing the new facility, which will consist of four simulator bays and supporting spaces. Site work will include substructure, exterior building, interior, HVAC, electrical, plumbing, fire protection, communication and demolition. The contract duration is 549 days. The project value is between $5-10 million. The NAICS code is 236220 with a $45 million size standard. The solicitation is set aside 100% for small business. Brand name products and sole source requirements are specified. The pre-bid conference is January 27, 2023 with proposals due by the amended date.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-16 MTC (Flight Simulator) McEntire Joint National Guard Base, South Carolina
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
1 Specs
1.00 22 13.00 20
- paragraph 1.2.1
Notes: letter g. States: The offeror's price is valid for at least 120 days from the receipt of proposals. Solicitation W50S923B0001, number 13. Additional Solicitation requirements letter D. states offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. Please confirm if the price validation period for the F16 MTC project is 120 calendar days, 120 work days or 90 calendar days.
169CES
CONFIRMED - 90 Calendar Days.
2 Dwgs LS100 Please clarify if all grassing is to be included with CLIN 0011 or in the base bid?
Architectural All grasses in this project are Base Bid. The Landscape - Trees & Shrubs are CLIN 0011.
3 Dwgs C101 Please clarify if all demolition required within the CLIN options is to be included in the Base Bid.
Civil CLIN 0001 Only. Demolition required for each of the Optional Line Items (CLINS 0002 through 0011) to be provided as part of each selected Optional Line Item.
4 Dwgs C102
The parking area that runs along Alabama Road states "New Parking Stall, Mill 2" Existing Pavement and Overlay with Surface Course Pavement". Please clarify if this is a new parking area or there is existing asphalt in this area.
Civil
See Sheets C100 and C102. Some of the parking along Alabama Road is existing and some will be new along Alabama Road. Be advised, any "NEW PARKING STALLS" will require new pavement as detailed on Sheet C501 "PAVEMENT SECTION". Refer to Drawings C100 Existing Conditions and Site Plan to view existing pavement and pavement areas that will be new where there is no existing pavement.
5 Dwgs C102 Please clarify if any of the striping for the parking stalls must be eradicated or they can be left as is.
Civil New Parking Striping to be provided.
6 Dwgs C102
Please specify on the plans which parking stall are to receive full depth pavement and which are to be milled as there is no clear way to differentiate between the two.
Civil See Response to Item 4 (above).
7 Dwgs C102 Please clarify paving design for HMA Access Driveways for CLIN 0010.
Civil HMA access driveways will require new pavement as detailed on Sheet C501
"PAVEMENT SECTION".
8 Dwgs C102 Please clarify paving design for "Restore Asphalt Pavement" that must be removed for new storm drain installation.
Civil Refer to Utility Trench Restoration Detail on Drawing C501.
9 Dwgs C102 Please clarify if all asphalt must be sawcut where new asphalt meets existing asphalt.
Civil All asphalt shall be sawcut where new asphalt meets existing asphalt.
10 Dwgs C103
Is contractor required to pay any sanitary sewer tap/connection fees. If so, can the amounts be provided or a POC be provided? 169CES
Contractor is not required to pay tap fees. The installation owns the utilities on the base. Contractor shall coordinate with the Civil Engineering Squadron on connecting the sanitary sewer.
11 Dwgs C103 Is contractor required to pay any water tap/connection fees. If so, can the amounts be provided or a POC be provided?
169CES
Contractor is not required to pay tap fees. The installation owns the utilities on the base.
12 Dwgs C103 Is contractor required to pay any gas tap/connection fees. If so, can the amounts be provided or a POC be provided?
169CES
Contractor is not required to pay tap fees. The installation owns the utilities on the base.
13 Dwgs C103 Please clarify who will be providing the Water and Gas meters.
Mechanical
Water meter provided by Contractor per P-701 and Specification 22 00 00. Gas meter provided by utility company per D1 / M-601.
14 Dwgs C102 Please provide edge of asphalt for installation of parking stalls along Alabama Road.
Civil Edge of Asphalt is roughly at the edge of the parking striping - street side.
15 Dwgs C103 Please provide size of new gas line to be run to building. Mechanical Gas line to meter assembly sized by utility company per D1 / M-601.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
16 Dwgs C103 Please provide size and material of existing line the new gas line will tie into.
Civil 2" plastic line.
17 Specs Please provide specifications for Gas Line.
Mechanical / Civil Facility gas piping per Specification 23 11 25.
18 Specs 32 12 16 Please clarify if prime coats are required.
Civil
Prime coats are not required prior to base course paving. A tack coat is required between base course and surface course. A tack coat is also required between existing pavement and surface course for milling work.
19 Dwgs C103 Please provide locations of new water and gas meters. Mechanical Refer to A2 / P-401 for water meter. Refer to A2 / MP101 for gas meter.
20 Specs 01 14 00 Can brown windscreen be used in lieu of brown slats for construction security fence?
169CES
Yes, as long as any tears are repaired immediately throughout construction.
21 Specs 01 14 00
Please clarify if the 8' high barbed wire Security fence can also serve at the Staging Area fence and that 2 separate fences are not required.
Project Management
The ICD/ICS 705 document requires the Construction Site to be secured. Since there is a "STAGING AREA SECURITY FENCE & GATE" being provided in the job (See Sheet C101), that meets the criteria for the securing Secure Area construction materials.
22 General Please clarify if an irrigation system is required for this project.
Project
Management There will be no permanent irrigation system provided in this project.
23 Specs
Please provide specifications for termite control if this is required.
Architectural
SEE ATTACHED Spec Section 31 31 16.13 - CHEMICAL TERMITE CONTROL.
Coordinate with pest management for chemical usage documentation and control
24 Specs 01 14 00
Is Security Fence to be post driven or on stands/panels?
169CES /
Project
Management
The Security Fence is to meet the preferences of the Site Security Manager (SSM) and approved by the Accrediting Official (AO) as outlined in the Construction Security Plan (CSP). Base Security Officials does not have a preference and both methods are approved.
25 Dwgs LS100 If CLINS are not awarded are these CLIN areas to be graded, topsoiled and seeded and be included in Base Bid?
Project Management
No. If OLIs 5/10/11 (associated with site work as identified on Sheet LS100) are not taken, the existing surface area will remain untouched. If any grade is disturbed by construction activities, disturbed surface grades will need to be repaired including topsoil and grass seeding and/or sod.
26 Specs 28 10 05
Specification section 28 10 05 is not a full ESS specification. Please confirm that the contractor shall only provide the required ESS infrastructure with pull string only to include the equipment rack and that all ESS cabling, devices, and equipment shall not be included in the final proposal.
Project Management
Confirmed as stated. ESS install (by others) may take place while the contractor is still on site. Some coordination may be required.
27 Specs 11 94 10
Specification section 11 94 10 Rooftop Fall Protection Anchors details rooftop anchors with leading edge self-retracting lifelines but the roof plans show a horizontal lifeline system. Please confirm which system is required.
Architectural
DELETE Spec Section 11 94 10 Rooftop Fall Protection Anchors. Replace with ATTACHED Spec Section 11 94 11 - ROOFTOP CABLE FALL PROTECTION SYSTEM.
28 Specs 26 08 00
The full specification does not include 26 08 00 Apparatus Inspection and Testing. Please confirm if third party first tier apparatus inspection and testing is required for the electrical system.
Electrical
Specification 260800 Apparatus Inspection and Testing is not required in this set of construction documents.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
29 Dwgs EP601
The electrical drawings show a connection requirement for a portable emergency generator (PEG). Please confirm that the contractor shall only provide the male connector at the NMTS only and that the PEG shall not be included in the final proposal.
Electrical
Confirmed. The PEG is not included in the scope of work.
30 Dwgs C104 & AE201
Sheet C104 shows a Roof Drain system but does not show lines tying into the roof drain system from the building. Sheet AE201 shows the downspouts emptying on the ground. Please clarify if the downspouts are to tie-in to roof drain system and what size pipe from downspout to roof drain system.
Civil / Architectural
Downspouts are to tie into the Sub-surface Storm Drain System via cast-iron downspout boots. All connected to the roof / storm system with 6" PVC pipe and Tee-Wye fittings. SEE ATTACHED Downspout Boot Detail.
31 Dwgs AE202 Please clarify if downspout boots are to be use and if so please provide specification.
Civil / Architectural See Response to Item 30 (above).
32 Specs 05 12 00, Para. 1.3
Spec section 05 12 00 para 1.3 requires the steel fabricator and erector be AISC certified. Would an ISO 9001-2015 certified manufacturer be considered as an acceptable substitute for the AISC certification?
Structural
This is acceptable with FSB as long as the owner approves of ISO 9001-2015 certified manufacturer in lieu of AISC Certification.
33 Specs
33.01 14 00 para 1.7.1
Please provide clarity at badging requirements. Para 1.7.1 under spec section 01 14 00 calls out that a badge request form must be submitted and more information can be found in paragraph 1.25.2;
however, there is no paragraph 1.25.2. Are their any citizenship requirements to work on the base?
169CES
For base access an EAL will need to be provided so that we may conduct the vetting and badging process. This will be identified in the Pre-Contract Briefing.
As for citizenship requirements ICD 705 Chapter 3. Fixed Facility SCIF Construction section B. Construction Security Paragraph 5 states:
Construction and design of SCIFs should be performed by U.S. companies using U.S. citizens to reduce risk, but may be performed by U.S. companies using U.S.
persons (an individual who has been lawfully admitted for permanent residence as defined in 8 U.S.C. § 1101(a)(20) or who is a protected individual as defined by Title 8 U.S.C. § 1324b (a)(3)). The AO shall ensure mitigations are implemented when using non- U.S. citizens. These mitigations shall be documented in the CSP.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
34 Specs
34.01 35 26 para 3.1.3
Spec 01 35 26 para 3.1.3 calls out Contract documents identify materials such as PCB, lead paint, and friable and non-friable asbestos and other OSHA regulated chemicals; however, no such callouts have been found. Please provide a hazardous materials survey or clarify if any hazardous materials are expected to be encountered.
Project Management
SEE ATTACHED Asbestos and Lead-Based Paint Testing Report for Existing Building 958.
4.0 Conclusions and Recommendations
The asbestos and lead-based paint assessment conducted on Building 958 located on Alabama Road at MCJNGB in Hopkins, South Carolina did not identify the presence of asbestos-containing materials or lead-based paint. If additional suspect ACMs not included in this report are discovered and will be disturbed by the renovation/demolition activities, bulk samples must be collected by a licensed asbestos inspector and analyzed for asbestos content, prior to disturbance of the suspect material(s).
SCDHEC requires a 10-working day written notification including submittal of this asbestos assessment report prior to building demolition. This report should be provided to contractors and design entities associated with the building demolition to ensure compliance with SCDHEC requirements for building demolitions. The installation ENV will need to know of any Haz waste found, stored or disposed of “PRIOR” to disposal and with manifest coordination “PRIOR” to disposal
35 Specs
35.01 35 26 para 3.1.3
No Hazardous Materials survey has been supplied for the building scheduled to be razed. Please supply survey or clarify if the contractor should include costs to perform a hazardous materials survey prior to demolition.
Project Management
See Response to Item 34 (above).
36 Specs & Dwgs
01 14 00 par
1.20.2 &
Sheet C101
Specifications call for (2) temp. security fencing gates but the plans only show one. Please clarify how many gates are required for the temp. security fence.
Project Management
The number of entry control access gates is to be determined by the Contractor and to be approved by the Contracting Officer. If the Contractor requires only one access point to the construction site, then it may be just one gate- or perhaps a second gate that remains chained shut and only opened if high volume movements on site are required.
37 Dwgs C103 Is GC responsible for installation of natural gas line? Mechanical Refer to A1 / M-501 and D1 / M-601 for delineation.
38 Dwgs C103 Is GC responsible for natural gas meter or regulators?
Mechanical Gas meter provided by utility company per D1 / M-601. Regulators by Contractor.
39 Dwgs C103 Please provide material type of new gas line.
Mechanical / Civil Facility gas piping per Specification 23 11 25.
40 Specs 22 00 00
Plumbing - Will propress fitting be allowed for the copper water lines? Propress fittings are not listed on the TABLE for approved materials but they are mentioned throughout the specs. Please let the contractor know if propress fittings are allowed.
Plumbing
Piping materials and fittings must be in accordance with the specified table for approved materials without deviation.
41 General Natural Gas Line - Will ProPress/MegaPress fittings be allowed on the natural gas line?
Mechanical / Civil Facility gas piping per Specification 23 11 25 without deviation.
42 Dwgs C102 Please provide exact locations of Detectable Warning Surfaces.
Civil Detectable warning surface location is called out on Drawing C102.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
43 Dwgs IF101 Sheet Keynote #5 lists 18"x18" Recycling Bin(d) to be CFCI. How many gallons are the bins required to hold?
Interiors Provide 40 gallon units. See ATTMT Item 43 - Sample Product Cut Sheet. There are many manufacturers available.
44 Dwgs IF101 Can a Basis of Design be provided for the Recycling Bin with a color listed?
Interiors See Response to Item 43 (above).
45 Dwgs EY601
The access control and intrusion detection system riser shows that a single mode fiber shall be installed from each control panel to the base defense operations center. Will the contractor be responsible for installing the fiber between the new F16 building and BDOC? If so please provide more detail on the type of fiber the contractor shall furnish and install.
Electrical / Security
/ 169CES
Security
Contractor will have ADVANTOR run the fiber from the panel to the Comm Rm.
From the Comm Rm it will traverse base fiber to the designated locations.
46 General
Site Visit - The site visit did not allow for access inside the building scheduled to be demolished. Please provide As-Builts to determine depth/construction of foundations, quantity/construction of interior walls and MEPFP in need of demo and safe disconnection as part of the building's demo.
Project Management
See ATTMT Item 46a & b containing Existing Bldg 958 Drawings.
47 Specs 00 14 00
Paragraph 1.26.1.1 Site Access - number 2. Guard Booth - Will the guard booth need to have concrete pad poured prior to setting the Guard booth?
Project Management
There is no requirement to have a concrete pad with the guard booth. This booth will however need to remain functional in inclement weather conditions.
48 Specs 00 14 00
Paragraph 1.26.1.1 Site Access - number 2. Guard Booth - Will the guard booth need to have bollards placed on either end of the booth?
Project Management
There is no specific requirement to have bollards provided with the guard booth other than this booth will need to be located (and potentially protected) by whatever means required by OSHA and any other applicable jobsite safety codes and guidelines.
49 Specs 00 14 00
Paragraph 1.26.1.1 Site Access - number 2. Guard Booth - Will the guard booth need to have any type of data or security lines?
Project Management
Data Lines will be required only if the "...workspace for maintaining paperwork associated with entering and exiting the Construction Zone" requires said lines.
No hard-wired security lines are required.
50 Specs 00 14 00
Paragraph 1.26.1.1 Site Access - number 2. Guard Booth - Does the base require the guard booth to be any specific color, white, beige, gray metal?
Project Management
Guard Booth shall be brown matching the fabric covering at the construction perimeter fence.
51 Specs 00 10 00
Section 00100 references a bid repository in the solicitation. Will Govt. consider allowing electronic bid submissions? Various vendors tend to withhold their pricing until day of bidding and an electronic submission will allow pricing from all vendors.
169CES
Only hand carried or mailed bids received before the bid opening will be considered.
52 Specs 00 10 00
Page 14 of 86 para. 5 references a bid repository for hand carried bids. Can bidders also ship the bid proposals to this address? 169CES
Amendment 0001 provides the mail address for bids: Bids may also be mailed to USPFO-SC, Purchasing and Contracting, ATTN: Kevin Esber, 9 National Guard Road, Columbia, SC 29201.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
53 Specs 08 71 00
Please clarify this perceived incongruity. The redacted sole source for cores and locksets requires Best brand, however from vol. I spec.
page. 661, spec. 08 71 00-14 it states for example, “FSIC Core 23-030 X “C” Keyway to match existing base system”. It does not reflect the Best sole source, instead it asks to match existing. Please clarify the cores and locksets, as there is no existing keyways to match. It is new construction.
169CES /
Architectural
The standard for McEntire JNGB is Best brand lock hardware with CORMAX SFIC (small format interchangeable core) utilizing 45H heavy duty mortise lock or 9K heavy duty cylindrical locks as specified
54 Specs 08 71 00
Vol. I spec. page 661, spec. 08 71 00-14 lists the core descriptions as, “FSIC Core”. FSIC means “Large Format” such as a Schlage brand.
However, the sole source Best core and lockset is an SFIC, “Small Format”. Therefore, it seems, the spec. Hardware schedule and the redacted Sole Source for the hardware are inconsistent. Please clarify the core and locksets for the openings.
169CES /
Architectural
The standard for McEntire JNGB is Best brand lock hardware with CORMAX SFIC (small format interchangeable core) utilizing 45H heavy duty mortise lock or 9K heavy duty cylindrical locks as specified
55 Specs 01 33 29
Can you please confirm if the spec. 01 33 29 Sustainability Reporting from Addendum 1 and its various implications are valid and will be exercised on the project?
Project Management
In a word, "Yes." Reference the GBCI Technical Guide - New Construction and Renovations Guiding Principles Implemented by UFC 1-200-02 (Dec 2016) for Third Party Construction Phase compliance goals.
The Construction Contractor shall familiarize itself with the relevant requirements and provide the necessary information and instruction to all subcontractors and installers.
56 Specs Can bids be mailed in or do they have to be hand carried? 169CES See Response to Items 51 & 52 (above).
57 Specs
Is this project applicable to the buy American Act?
Project
Management
Spec Section SECTION 01 14 00, paragraph 1.20.3.2 Procurement and Storage of Building/Finishing Material states, "The contractor is required to comply with the "Buy American Act."
Are the transformers owned by the base or by local utilities companies?
Civil Base Owned.
Is any of the material from the existing building being salvaged by the Government?
169CES /
Project
Management
Government will remove reusable parts (door hardware, door closure, etc.)
prior to demolition.
Can drawings/specifications be sent digitally to interested subcontractors?
169CES /
Project
Management
Prime contractors can send drawings/specs out digitall to interested subcontractors.
Will the CORPS of Engineers be involved on this project? 169CES / Project
Management
The US Army Corps of Engineers will not be personally involved in the project;
however, some specifications reference applicable US Army Corps of Engineers publications, references, and standards.
62 Dwgs
Is RMS 3.0 required? 169CES / Project
Management
RMS 3.0 is not required.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
63 Dwgs
For the building to be demolished as shown on C101 of plans, is there a hazardous material survey available for the building, OR if there is a hazardous material survey can the Govt. please provide the survey so we know what if anything needs remediated or abated, such as lead paint or ACM, asbestos containing material?
Project Management
Yes. See Response to Item 34 (above).
64 Dwgs C201 & C104
Sheet C201 notes the drain inlets and storm sewer piping at the mechanical yard as part of OLI #6. However the description of OLI #6 on the cover sheet does not mention storm drainage and sheet C104 shows the storm drainage at the mechanical yard as base bid.
Please clarify if the storm drainage for the mechanical yard should be included in the base bid or OLI #6.
Civil
OLI #6 shall include the drain inlets and storm sewer piping at the mechanical yard.
65 Dwgs G001
The descriptions for OLI #5 and OLI #10 both mention “curb cuts” as part of the scope of the option. The plans do not show any kind of curb work (cut/removal or new) associated with these options.
Please verify no curb cuts are required for OLI #5 and OLI #10. If curb cuts are required please provide plans that show the extent/requirements.
Project Management /
Civil
It is acknowledged that there appear to be no curb cuts associated with OLIs #5 and #10. Transitions from grade to street in these areas appear to be "edge of pavement" conditions.
66 Dwgs C102 & C201
Sheets C102 and C201 both note the mechanical yard as having 2” minimum stone ground cover in the base bid. The mechanical yard surface detail on sheet C502 notes “6” Thick Compacted 2” Clean Stone”. Please clarify: is the intent for the stone material at the mechanical yard to be roughly 2” in diameter and placed 6” thick?
Project Management /
Civil
Yes, as stated.
67 ICD/ICS 705
Has the architect of record incorporated the ICD/ICS 705 Technical Specifications into the project specifications or do we need to provide a copy of the ICD/ICS 705 specifications along with the project specifications for purposes of acquiring subcontractor pricing?
Architectural / Project
Management
The ICD/ICS 705 is part of the project specifications. Agreed.
VERSION 1.5: IC TECH SPEC - FOR ICD/ICS 705, DATED MAR 13, 2020 AND UFC 4-
010-05 will be critical for Sub-Contractor pricing.
We respectfully request that the government extend this proposal due date by seven (7) calendar days (21 February) to ensure enough time for subcontractor engagement and comprehensive pricing that is fair and reasonable.
169CES
Bid opening has been extended to 10 March 2023.
69 Specs
Existing building 958 is a fairly new metal building which is to be demolished as per the RFP. Is there anything the Government would like to salvage, recycle, or does everything go to the landfill?
169CES
See Response to Items 59 (above).
70 Specs & Dwgs
R-33 insulated metal wall panels are specified for the new building, which are not available. Will the Government accept R-30 panels which is an industry standard or “provide us testing and temperature information that R-33 was based on” to understand R-value requirements?
Architectural
Refer to Centria - Total Clad Insulated Metal Wall Panel.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
71 Dwgs AE001
Partition Types A1, A2 & A3 on AE001 notes “fire safing infill” at the top of the wall but this is a non-rated partition. Please verify that fire safing infill is required at the top of non-rated partitions.
Architectural
It is not. Delete “FIRE SAFING INFILL” and "FLEXIBLE SPRAY (BOTH SIDES)" at the top of non-rated partitions.
72 Dwgs AE001
Partitions Types, C, D and S on AE001 note “any applicable listed UL H-O-W system design”. What does “H-O-W” mean? Architectural
“H-O-W” means HEAD OF WALL.
73 Dwgs AE001
What is the required length of the steel clip angles spaced at 32” on center noted on AE001 at partitions types B1 and B2? Architectural
Steel Clip angle size is 3”x3”.
74 Dwgs AE305 & AE502
Architectural sections A1/A305 and A3/AE502 note “geotextile bentonite waterproofing” under the depressed slab areas. Is this required at all depressed slab areas? If so is this in lieu of or in addition to the 15 mil vapor barrier?
Architectural
“Geotextile Bentonite Waterproofing” under the depressed slab only occurs at the recessed Raised Access Floor areas and lapped flat 6" beneath the Vapor Retarder of the FF 100'-0" concrete slab.
75 Specs 07 13 53
I have been unable to locate any elastomeric sheet waterproofing on the plans. Does section 071353 apply to this project? If so please provide locations.
Architectural Section 07 13 53 applies to this project. Refer to Architectural Sections A1/A305 and A3/AE502.
76 Dwgs Which rooms, if any, require mold/moisture resistant gypsum board?
Architectural No room in this project requires mold/moisture resistant gypsum board.
77 Dwgs
Are concrete pads required in the base bid for the 2 chillers and the transformer in the mechanical yard? If so please provide pad dimensions, thickness, reinforcing requirements (if any) and base requirements (if any). Also if concrete pads are required in the base bid would they be deleted if Option #7 is accepted?
Mechanical
Concrete housekeeping pads are required for the chillers and transformer in the base bid and are also required if Option #7 is accepted. Pads shall be 6” height and constructed per D3 / S-002.
78 Specs 32 31 19
I have been unable to locate any steel ornamental fencing on the plans. Does section 323119 apply to this project? If so please provide locations.
Civil / Architectural Section 32 31 19 - STEEL ORNAMENTAL FENCE SYSTEM is not needed and can be omitted from this project.
79 Dwgs C103
What is the size and type of piping for the fire service line shown on sheet C103 from the pump house to the building?
Fire Protection
Per Spec 330505, Ductile iron piping is specified in paragraph 2.1, and is used for domestic and fire protection water systems per piping schedule in 2.12. Per Sheet F-001, fire service line from pump house to building is 6". Lead-ins are welded stainless steel with flange at 12" above the floor per FX401.
80 Dwgs C103
What is the size and type of piping for the water line shown on sheet C103 that comes out of the pump house and terminates at a post indicator valve?
Fire Protection
Per Spec 330505, Ductile iron piping is specified in paragraph 2.1, and is used for domestic and fire protection water systems per piping schedule in 2.12. Per Sheet F-001 and C-103, the fire service line from the street to the pump enclosure is 6" and the post indicator valve is on that line. Lead-ins are welded stainless steel with flange at 12" above the floor per FX401.
81 Dwgs C103
What is the size and type of piping for the water line shown on sheet C103 that supplies the new hydrant along South Carolina Road?
Fire Protection
Per Spec 330505, Ductile iron piping is specified in paragraph 2.1, and is used for domestic and fire protection water systems per piping schedule in 2.12. See also C103. A 6" DI pipe is shown on hydrant detail on Sheet C503.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
82 Dwgs
What is the required slab thickness and reinforcing (if any) for the Pump House slab on grade?
Fire Protection / Structural
See Spec section 213000 para. 2.3, Fire Pump Enclosure for enclosure structural and design requirements. Submit foundation drawings indicating slab thickness and reinforcing per 3.3.2.b and 2.10.
83 Specs 00100
Section 00100 of solicitation, page 14 of 86 para. 5 references a bid repository for hand carried bids. Can bidders also ship the bid proposals to this address?
169CES
See Response to Items 51 & 52 (above).
84 Specs 00100
Section 00100 references a bid repository in the solicitation. Will Govt. consider allowing electronic bid submissions? Various vendors tend to withhold their pricing until day of bidding and an electronic submission will allow pricing from all vendors.
169CES
See Response to Items 51 & 52 (above).
85 Specs 08 71 00
Please clarify this perceived incongruity. The redacted sole source for cores and locksets requires Best brand, however from vol. I spec.
page. 661, spec. 08 71 00-14 it states for example, “FSIC Core 23-030 X “C” Keyway to match existing base system”. It does not reflect the Best sole source, instead it asks to match existing. Please clarify the cores and locksets, as there is no existing keyways to match. It is new construction.
169CES /
Architectural
The standard for McEntire JNGB is Best brand lock hardware with CORMAX SFIC (small format interchangeable core) utilizing 45H heavy duty mortise lock or 9K heavy duty cylindrical locks as specified
86 Specs 08 71 00
Vol. I spec. page 661, spec. 08 71 00-14 lists the core descriptions as, “FSIC Core”. FSIC means “Large Format” such as a Schlage brand.
However, the sole source Best core and lockset is an SFIC, “Small Format”. Therefore, it seems, the spec. Hardware schedule and the redacted Sole Source for the hardware are inconsistent. Please clarify the core and locksets for the openings.
169CES /
Architectural
The standard for McEntire JNGB is Best brand lock hardware with CORMAX SFIC (small format interchangeable core) utilizing 45H heavy duty mortise lock or 9K heavy duty cylindrical locks as specified
87 Specs 01 33 29
Can you please confirm if the spec. 01 33 29 Sustainability Reporting from Addendum 1 and its various implications are valid and will be exercised on the project?
Project Management
See Response to Item 55 (above).
88 Dwgs C101
For the building to be demolished as shown on C101 of plans, is there a hazardous material survey available for the building, OR if there is a hazardous material survey can the Govt. please provide the survey so we know what if anything needs remediated or abated, such as lead paint or ACM, asbestos containing material?
Project Management
See Response to Item 34 (above).
89 Specs 08 71 00
Addendum 2 spec. 0871 00-21 hardware group 12 lists a lockmaster Elec. combo. Lock LKM7003X10 but Lockmaster’s website seems to show the LKM10K has replaced the LKM7000 series. Shall we price with the LKM10K item which replaces the item Govt. has shown on the hardware schedule?
Architectural
If the manufacturer confirms that it functions the same as the older model -price the newer model.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
90 Specs 32 31 19
Spec 32 31 19 is for a steel ornamental fence system, however, we don’t find details for an ornamental fence on the drawings. Is there a steel ornamental fence on the project; is the spec. valid? Please advise.
Civil
See Response to Item 78 (above).
91 Specs 08 41 13 &
09 06 00
Spec Section 084113 Pg 8 Section 2.2.3 Finish Organic Coating Fluoropolymer (PAINT)
Section 090600 - Finish Schedule Pg 2- 2.2.2.2 Anodized Clear
Please confirm finish.
Interiors
Utilize the Storefront Spec Section 084113.
92 Specs 09 06 00
Section 090600 Finish schedule Pg 2- 2.2.2.2
2.2.1.4 Glass and Glazing
Solarban z50 (2) Optiblue + Clear
Please confirm glass makeup.
Interiors
Per SECTION 09 06 00 SCHEDULES FOR FINISHES, 2.2.1.4 Glass and Glazing, use the PPG Solarban z50 (2) Optiblue for the outer pane of glass and the Clear laminated Glass for the inner pane of glass for all Insulating Glass Units including the entry and door glazing.
Delete reference to clear bronze and relpace with PPG Solarban z50 (2) Optiblu as shown below in SECTION 08 81 00 GLAZING, 2.1.4 Tempered Glass: ASTM C1048, Kind FT (fully tempered), Condition A (uncoated), Type I, Class 1 (transparent) and 2 (tinted heat absorbing), Quality q3, 1/4 inch thick. Color must be clear bronze PPG Solarban z50 (2) Optiblue for exterior insulated glazing outside pane. Provide at exterior glazing and wherever safety glazing material is indicated or specified.
93 Specs
The spec for the ESD and dustproof flooring.
I do not see any specific manufacturers or products specified for ERF ( OLI # 3 ) or Conc 1 and Conc 2 ( Base Bid ).
Is there a spec?
Interiors
Specification Section 090600 SCHEDULES FOR FINISHES lists BOD products for CONC2 (paragraph 2.3.1.8) and ERF1 (paragraph 2.3.1.9). Refer to response to #186 for CONC1 BOD product.
94 Specs
Can we provide an alternative to Standard - Stonclad ESD in the specifications?
Dur-a-flex: Dur-a-gard ESD (Armor-stat ESD Topcoat is optional) Interiors
Substitutions are allowed as long as they have the same salient characteristics of the BOD product. The proposed substitution is acceptable.
95 Dwgs The drawings call for 14” PVC storm drain piping. PVC is only available in 12” and 15”, which do they want to use?
Civil If 14-inch diameter PVC pipe is unavailable, provide 15-inch diameter PVC pipe.
96 Dwgs
The plans call for 12” RCP storm drain piping. 12” RCP is not currently being made by any of the suppliers in SC. Can we use 15” RCP, 12” HDPE, or 12” PVC? Which would be preferred?
Civil
Provide 12-inch class 52 ductile iron interior cement lined exterior asphaltic coated in lieu of 12-inch RCP.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
97 Dwgs
The bio-beds show a 4” perforated PVC drain line under the beds.
Perforated PVC is not available. We can get perforated HDPE pipe, or we would have to hand drill 4” PVC in the field? Which is preferred?
Civil
Alternate pipe materials will be evaluated during the construction phase.
98 Dwgs
I do not see a detail for the mixture of materials for the bio-beds?
a. Please provide details as to materials to mix and ra o?
b. Is the bio material to be wrapped in a permeable liner to wrap the bio mixture? (I see one detail over the perforated pipe showing depth of mix and mulch, but that is only detail I see) It shows fabric between the rock and bio-mix but not clear if fabric is to wrap entire area of bio-mix?
Civil
Refer to Drawing C504 Underdrain Detail Notes for planting mix ratio.
Permeable filter fabric is required at bottom of planting mix throughout the Bioretention Basins.
99 Dwgs & Specs
The asphalt suppliers say they do not see a SCDOT requirement listed or Type Asphalt, what type is required Type B, Type C, or other?
Civil Base Course shall be SCDOT HMA Intermediate Type C. Surface Course shall be SCDOT HMA Surface Course Type C.
100 Specs
Is this a sales tax free project? Project Management /
169CES
Yes. General Contractor should apply for tax exemption on Form ST-10G. See South Carolina Code 12-36-2120(29), SC Regulation 117-314.11, South Carolina Revenue Ruling #04-09.
101 Dwgs ET601
How many racks are going into each IT closet? Sheet ET-601 is the rack elevation drawings. The unsecure IT room has one rack and the secure IT room has two racks. However, on sheet ET-401 the secure room is showing 4 racks. Can we get clarification on the number of racks that are needed?
Comm
Contractor is to provide one (1) rack in the non-secure comm room and (2) racks in the secure comm room. Replace dual rack in secure comm with one on each side of the room. Each rack shall be supplied by the power panel on the same side of the room as the rack.
102 Dwgs ET401
On sheet ET-401 looking at the non-secure closest there are tele-comm symbols around the rooms. These symbols do not show what number they are (ex: S4, N4) like on the other sheets. We want to make sure we are running the correct number of drops to each outlet. Can you clarify what the correct drops are for these symbols?
Comm
N2 and wall phone are the only drops required in this room. Disregard the unlabeled drops. Wall phone shall receive one (1) Cat6 cable.
103 Dwgs ET601
Looking at the rack elevation drawings ET-601 there are a number of patch panels and wire managers. After looking over the plans and counting the devices the number of patch panels are more on the ET- 601 drawings then what is needed. Do we need to provide the number of patch panels and wire managers based on these elevation drawings? We are assuming they have the extras listed for future use.
Comm
Provide shop drawings with correct amount of patch panels, horizontal wire management, and face plates and RJ45 jacks in rooms. Shop drawings are part of the pre-construction submittals. Provide 25% spare ports for fiber and copper for all patch panels.
104 Dwgs ET601
Also looking at the rack elevation drawings ET 601, are these wire managers and patch panels 2U rack units size OR are they 1U? Comm
48 port patch panels that can be utilized can be 2RU and wire managers between panels can be 2RU.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
105 Dwgs ET601 & ES101
Sheet ET601 shows a 24 strand fiber coming in the IT closet and a 25 pair copper. Is there 24 strands of fiber we can splice to in that manhole located on sheet ES-101? Or are we going to be pulling this fiber from another location to that manhole then into the building?
Comm
Coordinate with contract officer or representative.
106 Dwgs Does each camera location have (1) Cat6 drop or do any cameras have a spare drop?
Comm One (1) Cat6 cable is satisfactory
107 Dwgs Will the Cat6 drops from the cameras go back to the secure IT closest?
Comm Cat6 drops for cameras shall go to the security office 111. Provide Black and Red separation where required.
108 Dwgs Will the Cat6 drops from the cameras going back to the secure IT closest require shielding on the cable?
Comm All CCTV drops shall be shielded.
109 Dwgs Will all the door controllers for the access controls be located in the secure or the non-secure IT rooms?
Comm ALL Non-secure access control shall go to the non-secure telecom room 116. all secure access control shall go to the security office room 111.
110 Dwgs
If the access control devices like card readers or cameras are provided by others (Govt) will the Contractor be expected/required to install?
Comm No. Unless required by the Contracting Officer or Representative.
111 Dwgs ET501
On sheet ET-501 will black fiber be acceptable in lieu of other called out colored fiber while using colored collars that go around the LC connectors?
Comm Black fiber is acceptable if the cable itself has a color coding at each end and boots of each connector.
112 Dwgs ET501 Will two fiber strands per port be acceptable on the four-port faceplate referenced on sheet ET-501?
Comm Yes, 2 LCs per port. One fiber to each LC connector.
113 Dwgs AE201
Sheet AE201 shows the Unit insignia sign as being 6’x6’ contradicting the sign specs. 10 14 01 para. 2.2.1 which mention 13’x13’. Which is correct?
Architectural If awarded, the Unit Insignia Sign (OLI#8) will be 6'x6'.
114 Dwgs AE201
Assuming the LED sign shall be 6’x6’ as shown on drawing AE201 shall we follow the specs. 10 14 01 para. 2.2 details for the remainder of the LED sign components such as aluminum backs, subframes, returns, and illumination details? The same spec. para.
2.2.1 references a 13’x13’ sign which calls into question the validity of the other associated dimensions for para. 2.2.
Architectural
One (1) Cat6 cable is satisfactory
115 Dwgs LS100
On Sheet LS100, tree and plant sizes are not listed for the plant material. Landscapers will need the sizes, gallon size OR caliper for the trees. Please provide.
Project Management
All trees to be 6ft in height. Maiden Grass plantings 18" in height.
116 Dwgs C102
Referencing Sheet C102, will full-depth asphalt patch be allowed where 12’’ RCP pipe is to be replaced?
Civil
See A/E Response No. 96. A 12" Class 52 DIP will be installed in lieu of the 12" RCP to facilitate full depth asphalt pavement to be installed to the maximum extent technically feasible. Prior to ordering 12" DIP for this location, Contractor shall confirm size and invert elevations of the existing 12" RCP to be replaced.
117 Dwgs C104
On Sheet C104, should a potential lowering of water main to accommodate storm outlet pipe be included in the base bid OR included in the alternate?
Civil
Refer to Test Pit Note and Symbol on Drawing C104 regarding water main offset for water main crossing of proposed storm sewer. Test pit will confirm if relocation of water main is required. Base bid should include water main lowering if required.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
118 Dwgs C104
On sheet C104 please provide detail for roof drain cleanout assemblies.
Civil
Roof drain cleanout assemblies shall be installed with 4" Brass Plug with Depressed Nut, 4" diameter PVC pipe cleanout riser, 4" diameter 45-degree PVC street elbow, PVC Wye Fittings similar to the 6" Service Lateral and Cleanout Detail on Drawing C501.
119 Dwgs C104
On Sheet C104, shall the Contractor provide downspout adapters and ties to 8’’ and 14’’ PVC on the east side of the building? None of this is shown. Please advise.
Civil Refer to A/E Response No. 30.
120 Dwgs C104
On sheet C104 the roof drain pipe leg between 43’ of 8” PVC and 153’ of 14” PVC on east side of building is not sized. Please provide those sizes for clarity.
Civil
Refer to Storm Sewer Profile on Drawing C201 for size of storm sewer. Yard Drain No. 8 shall be shifted to the west to allow 8" PVC and 14" PVC pipes to transition at the yard drain. The cleanout at this location can be eliminated.
121 Dwgs C104 On sheet C104, please describe scope of “reconstructing” existing storm boxes.
Civil The existing casting shall be reset on existing structure with proposed grades with new brick and mortar.
122 Dwgs & Specs FALL PROTECTION: Is there a horizontal lifeline spanning between anchor points?
Architectural See Response to Item 27 (above).
123 Dwgs & Specs
FALL PROTECTION: Can we use shock absorbing style anchors clamped to the standing seam roofs instead of the anchor type specified?
• The internal energy absorber of the shock absorbing anchor is designed to greatly reduce the loads on the roof structure. The rigid design as specified will most likely need to be connected to the structure below and not the seams as described in the specification.
Additionally, the anchor and attachment as described in the specification is not available on the market to our knowledge and would have to be custom designed. I have attached what is considered an industry standard for this type structure for your reference and consideration.
Architectural
DELETE Spec Section 11 94 10 Rooftop Fall Protection Anchors and replace with ATTACHED Spec Section 11 94 11 - ROOFTOP CABLE FALL PROTECTION SYSTEM
124 Dwgs AE101 & SB502
AE101- Addendum #2-note #4- “ 3/8” Painted steel checkered plate- SB502/A2- Addendum #2- “ 1/2” steel checkered plate.
Please clarify which thickness is desired/required.
Architectural
Change Note #4 on AE101 to 1/2".
125 Dwgs
Downspouts are shown on Drawing AE202 elevations and roof drain perimeter piping is indicated on Drawing C104, but connection between the downspout and 14” perimeter roof drain piping is not provided. Please provide information for the downspout boot and size piping to 14” roof drain.
Civil / Architectural
See Response to Item 30 (above).
Please provide a Hazardous Material Survey for the building to be demolished. It will need to be provided before demolition can proceed.
Project Management
See Response to Item 34 (above).
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
Are Addendum 1 and Addendum 2 issued with the solicitation documents to be acknowledged on the bid form in section 19 of the SF1442 or just the amendments issued?
169CES
Addendum 1 and 2 of the Specifications are incorporated into the original Solicitation, along with all other attachments to the original Solicitation. Only the Amendments to the Solicitation are required to be acknowledged on the bid form in Section 19.
128 Specs
Spec section 09 06 00 Schedule of Finishes states a Centria color for FWP1 and FWP2 Metal Wall Panels. Will similar standard colors from alternate manufacturers be considered? The Centria color is considered a custom color and is driving up the costs of the panels for alternate manufacturers.
Architectural
Standard Colors from (approved) alternate manufacturers will be considered.
129 Dwgs
The rock sizing on the drawings does not match quarry sizing for this area. Please clarify.
a. 4” rock is not available from surrounding quarries. Surge rock for this area has 2” – 8” rock in it. None with just 4” rock.
b. #57 stone is clean stone but it will have some stone that does not 100% pass ¾ screen. 789 stone will 100% pass ¾ screen, but it will have some fines in it?
Civil
a. 4" rock was selected to minimize potential Foreign Object Debris on the Air Base. 2"-4" rock is acceptable. 8" rock is not acceptable. Stone within the gravel yard shall be a uniform gradation.
b. Material to be submitted during construction phase for review by the Engineer and Government. Gravel bedding for pipe and structures can contain some fine aggregate. However stone for underdrains and gravel jacket shall be clean stone with no fines.
130 Specs
Spec 07 27 10.00 10 does not match up with the AB detail plan AE002, Spec 07 27 10.00 10 has 10 Envelopes to be tested and calls out for Arch and Arch + HVAC. This differs from the AB detail plan of 2 envelopes to be tested and 07 05 23, stating Architectural only.
Architectural
Disregard the 10 envelopes incorrectly listed in Spec 07 27 10.00 10 and replace with the values shown in the revised SECTION 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM attachment. Spec Sections 07 05 23 - PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS and 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM are both required and work together. Refer to Spec Sections 07 05 23 - PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS, 3.4.1 Architectural Only Test and 3.4.1.1 Test Goal outlining the requirements.
131 Dwgs
ARCHITECTURAL DETAILS as they pertain to POSSIBLE KNOCKOUS:
See attached drawings/details.
• Insulated wall panel laps/joints don’t align, but appear at page 1 “isometric”. Presuming a future knockout? Can we get more detail showing jamb and header for insulated panels and brick?
• Brick CJs don’t line up in eleva ons for OLI #5
• Low roof framing; or, has HSS irt at 169’ 6”?
Architectural
• Align vertical FWP1 joints with panels above at each of the four knockout panels. Refer to sheet AE603 for details that are included as part of this scope of work - FWP1 panel edge trims details at the jamb and head of the four knockouts will be similar OH (both sides of FWP1 butt joints) seperated by a 3/8" gap filled with backer rod and sealant - color to match FWP1 panels. (Note:
the 1/2" EXT GYPSUM SHEATHING on the CFMF studs will be continuous to the RO of the base bid STC door assembly and cut back to the steel tubes only when/if the opening is enlarged in the future)
• OLI #5 deals with parking and sidewalks NOT Brick control joints. Install Brick CJs as shown with backer rod and sealant - color to match MV1.
• Low roof framing; or, has HSS irt at 169’ 6”? - The A/E does not understand this question.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Answer
132 Dwgs & Specs Addm No. 2
Addendum 002 states, “This addendum consists of (5) pages and the…” however the Addendum 002 document that was received only included 4 pages. Please verify that there should only be 4 pages to the document, and we are not missing pages.
Project Management
Four pages.
133 Dwgs & Specs Addm No. 2
Addendum 002 attachment “Combined Drawings” included a 15th drawing numbered “FA601” that was not listed in the Addendum 002 attachment list nor in the instructions under Modifications to the Drawings. Please verify that we are to replace in its entirety the original drawing FA601 dated March 26, 2021, with the Addendum 002 version dated 03/10/2022.
Project Management
Yes. Include Replacement Sheet FA601 replacement sheet in the Contract Document Set.
134 Dwgs & Specs Addm No. 2
Addendum 002 included an attachment of specification section 32 31 13 “Fencing”. It is listed as item 001.2-3 as titled “Chain Link Fences and Gates” with instructions to replace the attached revised Section 32 31 13, however the original specifications do not include this section. Please verify that we are to add this section and not replace another section with the revised attached section.
Project Management
Yes. ADD New Specification Section 32 31 13 - FENCING to the Contract Documents.
135 Specs
01 32 17.00 20
Paragraph 34. “Time Extensions for Unusually Severe Weather” discusses “[W]eather experienced… must be found to be unusually severe… more severe than the adverse weather anticipated for the project location during any given month.” How is the “adverse weather anticipated” calculated?
169CES
Please see paragraphs 34.1.1 through 34.1.5 as that describes what constitutes a baseline. NOAA weather data can be utilized to gauge a baseline, anyone can request a weather report for zip code 29044 based on a certain period of time (i.e. last 3 years). Baseline will depend on when the NTP is issued and the contractor’s progress schedule and when it plans to perform what work.
136 Specs
01 14 00
Please clarify the temporary fencing requirements with regard to the construction zone and staging area referenced in Specification Section 01 14 00. Are these two separate fenced areas or is the staging area the same as the construction zone area as it appears to be indicated on the drawings? Are the fencing requirements the same for each area? Two different gate widths are indicated in each section 12-foot for the construction zone and 8-foot for the staging area. Please indicate which width is required/preferred. If separate, please indicate where each area is to be located.
Project Management
The Staging area and the Construction Zone are the same thing. The fence shall include two entry control points. One for day to day access by contractor personnel (main gate with the Guard Booth), and one for government emergency/fire response access/circulation. Entry Control Points shall have gates that are a minimum of 12 feet wide for vehicles.
BIDDER INQUIRIES
No. Ref Doc Para. Question E v a
Ans…