Attachment 1 - SOO Front Gate Sign UPDATED.pdf
PDF 942 KB Posted
- Attached to
- Electronic Messaging Center LED Sign Federal contract opportunity
- Solicitation number
- W50S9025QA007
- Issued by
- Department of the Army National Guard
About this file
This Statement of Objectives (SOO) outlines Biddle Air National Guard (ANG) Base's requirement for a new Electronic Message Center (EMC) sign at the main gate. The project specifications call for a full-color LED sign approximately 4'6"x 8'5" that fits the existing housing, with a 10mm display capable of showing text, graphics, and video from at least 40 feet away. The sign must have a weather and tamper-proof casing, automatic brightness adjustment, 208v single-phase electrical connectivity, LC to LC Single Mode Fiber connection, and a remote programmable content management system.
The contractor will be responsible for removing the current sign, installing the new EMC, and ensuring full functionality, with no government assistance provided. Contractor representatives must obtain a military base pass for installation access. The project requires a three-year warranty covering parts, site services, and any defects. The SOO is dated 22 August 2025 and specifically focuses on replacing the front gate electronic messaging system to communicate base-wide information to airmen, staff, and visitors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - SOO Front Gate Sign UPDATED.pdf | ||
| Attachment 1 - SOO Front Gate Sign UPDATED.pdf | ||
| Attachment 3 - Questions and Answers Front Gate Sign.pdf | ||
| Biddle EMC Photos.pdf | ||
| Attachment 1 - SOO Front Gate Sign.pdf | ||
| Attachment 2 - WD 2015-5794 Rev 29.pdf | ||
| Solicitation - W50S9025QA007.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objectives Biddle ANG Base
Front Gate EMC Replacement 22 August 2025
1. Overall Objective. Biddle ANG Base requires the procurement and installation of a new Electronic Message Center (EMC) sign at the main gate to communicate important base-wide information such as safety alerts, event notifications, and operational updates to Airman, staff and visitors.
1.1. The Electronic Message Center sign should be approximately 4’6”x 8’5" and these are the Government measured dimensions of the existing sign including the housing. The current housing should be preserved, and the sign should fit into the existing infrastructure with minimal modification. The contractor will be ultimately responsible for verifying all measurements. The sign must be full-color LED capable of displaying text, graphics and video. The EMC must have a minimum of 10mm display with at least a 40 ft. viewing distance. The EMC must have a weather and tamper proof casing and automatic brightness for readability in all lighting conditions. The EMC must meet electrical standard specifications (208v single phase with a 30-amp breaker). The sign requires LC to LC Single Mode Fiber connectivity. A remote programmable content management system that is compatible with the sign must be provided.
The ECM must have a three-year warranty on parts, site services, and any defects.
1.2. The contractor shall remove and properly dispose of the current sign at an off-base location.
The contractor must install the new ECM in the existing housing at the Biddle ANG Base main gate. The contractor must ensure the ECM is fully functional prior to final acceptance of the work. The contractor must ensure they have the appropriate equipment, parts, tools and personnel to install the EMC; no assistance will be provided by the Government. Contractor representatives and employees must be able to obtain a military base pass to access DOD installation.
File details come from the government source that posted it. Updated .