Attachment 1 - SOO Front Gate Sign UPDATED.pdf
PDF 272 KB Posted
- Attached to
- Electronic Messaging Center LED Sign Federal contract opportunity
- Solicitation number
- W50S9025QA007
- Issued by
- Department of the Army National Guard
About this file
This Statement of Objectives (SOO) details the Biddle Air National Guard (ANG) Base's requirement for a new Electronic Message Center (EMC) sign at the main gate. The project specifications call for a full-color LED sign approximately 4'6" x 8'5", capable of displaying text, graphics, and video with a minimum 10mm display and 40 ft. viewing distance. Key technical requirements include weather and tamper-proof casing, automatic brightness adjustment, 208v single-phase electrical connectivity, Ethernet (Cat 6) cable/fiber connection, and a remote programmable content management system.
The contractor will be responsible for removing the existing sign, installing the new EMC in the current housing with minimal modifications, and ensuring full functionality. The project requires the contractor to provide all necessary equipment, parts, tools, and personnel for installation, with no government assistance. The new sign must come with a three-year warranty on parts, site services, and defects. Contractor representatives will need to obtain a military base pass to access the Department of Defense (DOD) installation. The project is dated for 21 August 2025 and focuses on improving base-wide communication for Airmen, staff, and visitors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - SOO Front Gate Sign UPDATED.pdf | ||
| Attachment 1 - SOO Front Gate Sign UPDATED.pdf | ||
| Attachment 3 - Questions and Answers Front Gate Sign.pdf | ||
| Biddle EMC Photos.pdf | ||
| Attachment 1 - SOO Front Gate Sign.pdf | ||
| Attachment 2 - WD 2015-5794 Rev 29.pdf | ||
| Solicitation - W50S9025QA007.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objectives Biddle ANG Base
Front Gate EMC Replacement 21 August 2025
1. Overall Objective. Biddle ANG Base requires the procurement and installation of a new Electronic Message Center (EMC) sign at the main gate to communicate important base-wide information such as safety alerts, event notifications, and operational updates to Airman, staff and visitors.
1.1. The Electronic Message Center sign should be approximately 4’6” x 8’5” (L x W). The current housing should be preserved, and the sign should fit into the existing infrastructure with minimal modification. The contractor will be ultimately responsible for verifying all measurements. The sign must be full-color LED capable of displaying text, graphics and video.
The EMC must have a minimum of 10mm display with at least a 40 ft. viewing distance. The EMC must have a weather and tamper proof casing and automatic brightness for readability in all lighting conditions. The EMC must meet electrical standard specifications (208v single phase with a 30-amp breaker). The sign requires Ethernet cable/fiber (Cat 6) connectivity. A remote programmable content management system that is compatible with the sign must be provided.
The ECM must have a three-year warranty on parts, site services, and any defects.
1.2. The contractor shall remove and properly dispose of the current sign at an off-base location.
The contractor must install the new ECM in the existing housing at the Biddle ANG Base main gate. The contractor must ensure the ECM is fully functional prior to final acceptance of the work. The contractor must ensure they have the appropriate equipment, parts, tools and personnel to install the EMC; no assistance will be provided by the Government. Contractor representatives and employees must be able to obtain a military base pass to access DOD installation.