Questions and Answers Compiled DPEZ182200 Repair SIM Bldg.pdf

PDF 68 KB Posted

Attached to
Modifications to C130 Simulator Building
Solicitation number
W50S8W20R0011
Issued by

About this file

This document contains questions and answers regarding a solicitation for modifications to a C-130 simulator building. The solicitation requests design-build services for repairs and upgrades including installation of a new VESDA system in computer and high bay rooms. Quotes are due on September 21, 2020 with questions due by September 10. A site visit is scheduled for September 1. The facility drawings and door schedule are provided for reference, but contractors must field verify all aspects of the work. The government simulator contractor will provide and install the associated VESDA system, while the facility contractor will integrate inputs and outputs from that system into the new building fire alarm system. The pre-action fire suppression system will remain unchanged.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Compiled DPEZ182200 Repair SIM Bldg

1. Will the CAD files for this project be made available to the awarded design-build team?

ANSWER: Yes.

2. It was discussed that the fire alarm system would have device locations and a fire alarm layout for the simulator building. Do you have an idea when these drawings will be available for us to look at?

ANSWER: Original Bldg Drawings are included for reference, but contractor responsible to field verify.

3. Does the existing fire system need to be live during construction?

ANSWER: Please see SOW revisions in Addendum 1.

4. What is the anticipated award date?

ANSWER: 28 September 2020

5. What is the size of the roll up doors?

ANSWER: Please see Door Schedule on sheet A402. Approximate size is 20’x22’. Contractor to field verify prior to ordering.

6. VESDA System: What’s government provided and what’s not?

ANSWER: Please see SOW revisions in Addendum 1. In Summary:

- Government (sim contractor) will provide and install VESDA system associated with the trainer.

- Facility contractor will provide and install VESDA system associated with the computer room and high bay rooms.

- Facility contractor will integrate listed inputs and outputs in solicitation from trainer system to building fire alarm system.

- Fire suppression system will not be modified, keeping pre-action system. Delete spec section 211313

- Facility will not require a complete new system. Work is not planned to fire alarm system beyond what is described in the solicitation. Components/systems that are added in the solicitation shall be new and complete.

File details come from the government source that posted it. Updated .