BRIDGING DOCS.pdf

PDF 6 MB Posted

Attached to
Modifications to C130 Simulator Building Federal contract opportunity
Solicitation number
W50S8W20R0011
Issued by
Department of the Army National Guard

About this file

This solicitation is for a design-build project to perform modifications to a C130 simulator building located at the Wyoming Air National Guard. The project magnitude is estimated between $250,000 to $500,000. Quotes are due on September 21, 2020 by 10:00 AM MST. Questions regarding the solicitation are due by September 10, 2020 at 10:00 AM MST. A site visit is scheduled for September 1, 2020 at 1:00 PM MST at the building location. An entry authority list must be returned by August 31, 2020 at 10:00 AM MST for site access. The soliciting agency is the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPV

MECHANICAL/FIRE

PROTECTION

WST SIM MAINT

PARTS STOR

WST HIGH BAY

INSTRUCTORS

SUITE

WST COMPUTER ROOM

DATA STORAGE/SAFE

COMM

VESTIBULE

MAINT

RECEPTION

LOBBY

SITE MGR

(CONTRACT)

PO/QAR

(GOV'T)

MEN

WOMEN

OFFICE

SECURITY

ELEV

CORR.

STAIR

STAIR

WORK NOTES:

1 (E) 24"x12" COMM TRENCH

2 (E) RAISED FLOOR SYSTEM

3 REMOVE EXISTING TRANSLUCENT PANELS (AND RETURN TO THE GOVERNMENT) ONLY ONCE ROLL-UP DOORS ARE DELIVERED AND READY FOR

INSTALLATION

4 FIRESTOP BELOW FLOOR OPENING AFTER SIM INSTALLATION IS COMPLETE

5 FROST WINDOW TO SAME OPACITY AS WINDOW IN RM 114

6 PAINT FLOOR WITH OIL RESISTANT NON-SLIP PAINT, PREP SURFACE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS

7 NEW WELDED METAL STAIR, PROVIDE SHOP DRAWING STAMPED BY STRUCTURAL ENGINEER

8 REMOVE EXISTING KABA LOCK AND RETURN TO GOVERNMENT, NO EXTERIOR HARDWARE, PROVIDE BLANK COVER PAINTED TO MATCH DOOR WITH

TAMPER RESISTANT FASTENERS

9 COORDINATE NEW WALL AND DOOR WITH STRUCTURAL STEEL ABOVE TO SECURE STUDS TO STEEL AND PROVIDE DIAGONAL BRACING. PROVIDE

EXPANDED METAL MESH ABOVE CEILING AT VERTICAL FACE OF STUDS AROUND PIPING AND DUCTWORK. OVERLAP MINIMUM 4" AND SPOT WELD

MAXIMUM 96 SQUARE INCH OPENINGS WITH MAXIMUM 6" DIMENSION IN ANY DIRECTION

10 PAINT ENTIRE FLOOR WITH OIL RESISTANT NON SLIP COATING. PROVIDE EXPANSION JOINT MATERIAL AT MOTION SLAB. PAINT TRENCH COVERS

INDIVIDUALLY, PREPARE SURFACES TO BE PAINTED IN ACCORDANCE WITH PAINT MANUFACTURER'S RECOMMENDATIONS

11 SIM CONTRACTOR WILL PROVIDE TEMPLATE TO LOCATE 36 HOLES TO BE DRILLED UNDER THIS CONTRACT IN REACTION PAD. HOLES SHALL BE 1.125" IN

DIAMETER, AND 8.25" TO 8.5" DEEP

12 GRIND CONCRETE AT PAD LOCATIONS ON REACTION PAD WITHIN TOLERANCES IN TFR

DEMO NOTES:

1 REMOVE FLOOR TILES IN RM 116 AND GRIND ADHESIVE WITH DIAMOND IMPREGNATED

BLADE DESIGNED FOR ADHESIVE REMOVAL, REPAIR ANY DAMAGE TO EXISTING

EXPANSION JOINT SEALANT AROUND MOTION BASE

A

A

U P

(E)REACTION PAD

P7

1ST FLOOR PLAN

SCALE

"=1'

TYPICAL PARTITION TYPE

SCALE 1"=1'

P7

2ND FLOOR PLAN

"=1'

MIOS

CLASSROOM

MEN

WOMEN

UNIT

JAN.

STORAGE

GALLEY &

VENDING

BREAK

AREA

LOBBY

STAIR

STAIR

ELEV

CORR.

EQUIPMENT

PLATFORM

BRIEF/DEBRIEF

#2

BRIEF/DEBRIEF

#1

WORK NOTES:

1 FROST WINDOWS TO SAME OPACITY AS WINDOWS IN RM 114

2 PROVIDE DIAGONAL BRACING ABOVE CEILING. PROVIDE EXPANDED METAL MESH ABOVE

CEILING AT VERTICAL FACE OF STUDS AROUND PIPING AND DUCTWORK. OVERLAP

MINIMUM 6" AND SPOT WELD TO CREATE MAXIMUM 96 SQUARE INCH OPENINGS WITH

MAXIMUM 6" DIMENSION IN EITHER DIRECTION.

3 AFTER SNS INSTALLATION INFILL OPENING WITH WALL TYPE P7. TRIM PATCH AND PAINT

OPENING AND ENTIRE WEST WALL OF ROOM 210 TO MATCH REST OF ROOM. PAINT PATCH

TO MATCH (N) WEST HIGH BAY SIDE OF WALL.

DEMO NOTES:

1 REMOVE PORTION OF (E) CASEWORK TO ALLOW INSTALLATION OF NEW WALL

TWO UPPER CABINETS AND ONE LOWER TRIM AND FINISH EDGE OF COUNTER

2 CREATE MINIMUM 84" WIDE BY 84" TALL OPENING INTO M103 210. STRUCTURAL ENGINEER

TO DETERMINE LINTEL/REINFORCEMTN/BOND BEAM. COORDINATE WITH ELECTRICAL FOR

TEMPORARY RELOCATION OF OUTLETS AND NETWORK DROPS.

P7

P1

1ST FLOOR REFLECTED CEILING PLAN

"=1'

EO

WORK NOTES:

1 MODIFY GRID TO MEET AT NEW WALL

2ND FLOOR REFLECTED CEILING PLAN

"=1'

WORK NOTES:

1 RE: ELECTRICAL DWGS FOR NEW LIGHT FIXTURE

2 MODIFY GRID TO MEET AT NEW WALL

WORK NOTES:

1 REFERENCE ELECTRICAL DRAWINGS FOR GOVERNMENT PROVIDED,

CONTRACTOR INSTALLED GPS ANTENNA. SEAL COAX CABLE

PENETRATION.

SOUTH ELEVATION

SCALE

"=1'

NORTH ELEVATION

SCALE

"=1'

VERTICAL PLANE, DOWNWARD

DRAWBRIDGE WEIGHTS AT STAIR LANDING:

267 LBS (EACH OF 4 POINTS)

HORIZONTAL PLANE, OUTWARD 800 LBS (EACH OF UPPER 2 POINTS)

HORIZONTAL PLANE, INWARD 800 LBS (EACH OF LOWER 2 POINTS)

VERTICAL PLANE, DOWNWARD

CABLE SUPPORT INTERFACE WEIGHTS

1675 LBS

HORIZONTAL PLANE, OUTWARD 400 LBS

TORQUE MOMENT AT FORCE POINT 620 FT/LBS

DELEGATED DESIGN:

REFERENCE REFERENCE SPECIFICATIONS SECTION

055000 METAL FABRICATIONS

A20

A STAIR SECTION

SCALE: 1/2"=1'-0"

A20

B STAIR SECTION

SCALE: 1/2"=1'-0"

DOOR DETAILS

DOOR SCHEDULE

FRAME TYPES

DOOR TYPES

TAG

PLUMBING SCHEDULE

ITEM

CP-1 CONDENSATE PUMP

EW-1 EYEWASH

DESCRIPTION

TMV-1 THERMOSTATIC MIXING VALVE

NOTES:

LOW PROFILE, 70 GPH AT 5 FT HEAD, AUTO START/STOP, INTEGRAL DISCHARGE CHECK VALVE, OVERFLOW DETECTION SWITCH, 120V/1 PHASE, 6FT CORD WITH GROUNDED PLUG, 120V/1 PHASE, 1.5 AMPS, 93 WATTS.

PEDESTAL MOUNT EYE/FACE WASH, CORROSION RESISTANT, STAINLESS STEEL COMPONENTS, 3.7 GPM FLOW CONTROL, TYPE 304 STAINLESS STEEL INLINE STRAINER, UNIVERSAL SIGN, DUST COVER, PROVIDE WITH TMV-1. INSTALLATION TO COMPLY WIHT ANSI 2358.1

EMERGENCY TEMPERING VALVE FOR SINGLE EYE/FACE WASH, MAX 10 GPM, POSITIVE SHUT OFF, AUTOMATIC SCALD PROTECTION, ADJUSTABLE TEMPERATURE, MAX 5 PSI PRESSURE DROP AT 4.1 GPM

MS-1

TERRAZZO, 24"x24" CORNER SINK, FAUCET VACUUM BREAKER, INTEGRAL STOPS, WALL BRACE, PAIL HOOK AND HOSE THREAD, PROVIDE MOP HANGER

GENERAL NOTES (FOR ALL MECHANICAL DRAWINGS)

1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, PRIOR TO BID, AND BECOME FAMILIAR WITH THE EXTENT OF THE WORK REQUIRED. NO EXTRAS WILL BE ALLOWED FOR ALTERATIONS OF A FORESEEABLE NATURE REQUIRED TO ACHIEVE THE END

RESULT AS INDICATED BY CONTRACT DOCUMENTS.

2. CONTRACTOR IS TO PROVIDE COMPLETE CONNECTIONS TO ALL EQUIPMENT.

3. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING, COORDINATE ANY EQUIPMENT DOWNTIME, AND COORDINATE GENERAL WORK SCHEDULE WITH THE PROPERTY MANAGER.

4. CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING BID, AND VERIFY DIMENSIONS AND EXISTING CONDITIONS RELATED TO THE WORK.

5. ALL CUTTING, PATCHING AND CORE DRILLING FOR THE INSTALLATION OF NEW EQUIPMENT, DUCTS, HANGERS, ETC. SHALL BE HELD TO A MINIMUM AND BE ACCOMPLISHED IN A CAREFUL MANNER.

6. CONTRACTOR TO COORDINATE THE LOCATION OF ALL DUCTWORK, CEILING DEVICES, GRILLES, REGISTERS AND DIFFUSERS WITH REFLECTED CEILING PLAN AND STRUCTURE PRIOR TO BEGINNING WORK.

7. DUCT DIMENSIONS GIVEN ARE OUTSIDE SHEET METAL DIMENSIONS.

8. MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT

DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER.

9. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR TO MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM HIS WORK.

10. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE STATE CODES, LOCAL CODES AND OWNER'S STANDARDS INDICATED BY THE CONSTRUCTION DOCUMENTS.

SHUT-OFF VALVE W/TAMPER SWITCH

FIRE DEPARTMENT CONNECTION-WALL TYPE

O.S. & Y VALVE

FIRE PROTECTION

FLOW SWITCH

FIRE ALARM

FIRE PIPE

CHILLED WATER RETURN

HEATING WATER RETURN

HEATING WATER SUPPLY

CHILLED WATER SUPPLY

SHUT OFF VALVE IN RISER

DRAIN VALVE W/ HOSE END

PLUG OR BALANCING SHUT-OFF VALVE IN RISER

FLOW CONTROL VALVE W/ CHECK

STRAINER W/ BLOW-OFF VALVE

N.O. VALVE W/ LOCKING COVER

TEMPERATURE CONTROL VALVE, 3-WAY

VALVES & SPECIALTIES

CHECK VALVE

SHUT-OFF VALVE

GLOBE VALVE

FLOW INDICATOR

DRAIN PIPE

MECHANICAL LEGEND

PLUG FOR DIVISION 15400 (PLUMBING SYSTEMS)

CALIBRATED BALANCING SHUT-OFF VALVE FOR

DIVISION 15600 (HYDRONIC SYSTEMS)

PRESSURE INDEPENDENT AUTOMATIC BALANCING VALVE

CONTROLS (IN PLAN)

HUMIDISTAT/SENSOR

THERMOSTAT/SENSOR

FLEXIBLE DUCT

HORIZONTAL CLEANOUT

HVAC DUCTWORK

SUPPLY AIR DUCT DOWN

OA, RA OR EXH DUCT DOWN

VERTICAL CLEANOUT

OPPOSED BLADE DAMPER ( O.B.D. )

TURNING VANES SHOWN IN 90° ELBOW.

PLUMBING

SANITARY WASTE PIPE

PLUMBING VENT PIPE

NATURAL GAS

DOMESTIC HOT WATER CIRCULATING

DOMESTIC COLD WATER

DOMESTIC HOT WATER

L - LINED DUCTWORK

DUCT SIZES ARE OUTSIDE SHEET METAL DIMENSIONS.

1st NO. IS SIZE OF SURFACE SHOWN. 2nd NO. IS DUCT DEPTH.

LETTERS AFTER DIM. CORRESPOND TO FOLLOWING:

Ø - ROUND DUCTWORK

SUPPLY DIFFUSER. ALL DIFFUSERS FOUR-WAY THROW

UNLESS NOTED OR THROWS SHOW IN PLAN. SEE SPECIFICATIONS FOR TYPE.

RETURN AIR TAG. SEE SPECIFICATIONS FOR TERMINAL DEVICE INFO.

SECTION THRU OUTSIDE AIR INTAKE OR SUPPLY AIR DUCT

SECTION THRU RETURN AIR OR EXHAUST DUCT

CHANGE OF ELEVATION UP (UP) DOWN (DN) IN DIRECTION OF AIR FLOW

RETURN AIR GRILLE W/SOUND BOOT SHADING INDICATES OPEN END

SHEET

M P 100

M 101

M 102

SHEET NAME

MECH/PLUMB TOC, MECH NOTES, PLUMB SCHEDULE

SHEET LIST

FIRST FLOOR HVAC

SECOND FLOOR HVAC

P 101

P 102

FIRST FLOOR PLUMBING

SECOND FLOOR PLUMBING

MOP SINK

WORK NOTES:

1 PROVIDE 12 X 12 FACTORY FABRICATED SECURITY BARS (MAX 96 SQ. IN. OPENINGS AND MAX 6"

OPEN DIMENSION, 3/4" BARS) INDUCT, COORDINATE WITH ARCHITECTURAL TO BE IN SAME PLANE

AS EXPANDED METAL MESH AT NEW WALL, PROVIDE SQUARE TO ROUND DUCT TRANSITIONS AS

NECESSARY

2 EXISTING CWS/R TAPS INTO HIGH BAY 116 WILL NOT BE USED

3 PROVIDE REMOTE TEMPERATURE SENSOR APPROXIMATELY 15'-0" A.F.F. ROUTE WIRING IN

SURFACE MOUNTED CONDUIT, OFFSET OVER EXISTING CONDUIT

1ST FLOOR HVAC PLAN

SCALE

"=1'

SUPV

MECHANICAL/FIRE

PROTECTION

WST SIM MAINT

PARTS STOR

WST HIGH BAY

INSTRUCTORS

SUITE

WST COMPUTER ROOM

DATA STORAGE/SAFE

COMM

VESTIBULE

MAINT

RECEPTION

LOBBY

SITE MGR

(CONTRACT)

(GOV'T)

PO/QAR

WOMEN

MEN

STOR

PO/QAR

ELEV

CORR.

STAIR

STAIR

SUPV

MECHANICAL/FIRE

PROTECTION

WST HIGH BAY

PARTS STOR

SUITE

INSTRUCTORS

DATA STORAGE/SAFE

WST COMPUTER ROOM

COMM

VESTIBULE

RECEPTION

MAINT

LOBBY

SITE MGR

MEN

(CONTRACT)

WOMEN

ELEV

CORR.

STAIR

STAIR

2ND FLOOR HVAC PLAN

"=1'

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

MEN

WOMEN

UNIT

JAN.

STORAGE

GALLEY &

VENDING

BREAK

AREA

LOBBY

STAIR

STAIR

ELEV

CORR.

EQUIPMENT

PLATFORM

WORK NOTES:

1 PROVIDE FACTORY FABRICATED SECURITY BARS (MAX 96 SQ. IN. OPENINGS AND MAX 6" OPEN

DIMENSION, 3/4" BARS) IN DUCTS, COORDINATE WITH ARCHITECTURAL TO BE IN SAME PLANE AS

EXPANDED METAL MESH AT NEW WALL

2 RELOCATE (E) SUPPLY DIFFUSER OUT OF (N) JANITORIAL CLOSET AND INTO GALLEY VENDING 206

EXTEND/RELOCATE FLEX DUCT AS REQUIRED

SUPV

MECHANICAL/FIRE

PROTECTION

WST SIM MAINT

PARTS STOR

WST HIGH BAY

INSTRUCTORS

SUITE

WST COMPUTER ROOM

DATA STORAGE/SAFE

COMM

VESTIBULE

MAINT

RECEPTION

LOBBY

SITE MGR

(CONTRACT)

PO/QAR

(GOV'T)

MEN

WOMEN

OFFICE

SECURITY

ELEV

CORR.

STAIR

STAIR

1ST FLOOR DOMESTIC PLUMBING PLAN

SCALE

"=1'

SUPV

MECHANICAL/FIRE

PROTECTION

WST SIM MAINT

PARTS STOR

WST HIGH BAY

INSTRUCTORS

SUITE

WST COMPUTER ROOM

DATA STORAGE/SAFE

COMM

VESTIBULE

MAINT

RECEPTION

LOBBY

SITE MGR

(CONTRACT)

PO/QAR

(GOV'T)

MEN

WOMEN

OFFICE

SECURITY

ELEV

CORR.

STAIR

STAIR

WORK NOTES:

1 ROUTE CONDENSATE DRAIN FROM COCKPIT A/C UNIT TO CONDENSATE PUMP (CP-1),

ROUTE PUMPED CONDENSATE AGAINST WALL BELOW ELECTRICAL PANELS AND INTO

COMPUTER ROOM BELOW RAISED FLOOR TO AIR GAP AT EXISTING FLOOR SINK

2 ROUTE 2" DRAIN THROUGH WALL DOWN THROUGH ACCESS FLOOR AND BELOW FLOOR

TO AIR GAP AT EXISTING FLOOR SINK

3 ENLARGE TO 3" SS TRANSITION FROM 4" AT FIRST FLOOR AND TO 2" BELOW SECOND

FLOOR

1ST FLOOR SANITARY PLUMBING PLAN

SCALE

"=1'

SHEET

E 100

E 101

E 201

SHEET NAME

LEGEND, TOC, SCHEDULE

FIRST FLOOR LIGHTING PLAN, LIGHT FIXTURE AND LIGHTING DEVICE SCHEDULE

FIRST FLOOR POWER PLAN AND SWITCHBOARD SB1 SCHEDULE

E 202

E 300

E 301

SECOND FLOOR POWER PLAN, SWITCHBOARD SCHEDULE SB2, ELEVATOR EWUIPMENT ROOM AND GROUND BUSS DETAIL

ELECTRICAL EQUIPMENT SCHEDULE

ELECTRICAL ONE LINE AND ELECTRICAL FEEDER SCHEDULE

E 302

E 401

E 500S

GROUNDING ONE LINE & GROUNDING ONELINE FOR SEPARATELY DERIVED SYSTEMS, HP11 PANEL SCHEDULE, BRANCH CIRCUITS LARGER THAN #12

FIRST FLOOR HVAC POWER PLAN AND MECHANICAL EQUIPMENT SCHEDULE

FIRST & SECOND FLOOR SECURITY PLAN, SECURITY DEVICE SCHEDULE & SECURTY LEGEND

EXISTING LIGHTING FIXTURE SCHEDULE

Type Mark Count Manufacturer Model Description

A 15 H.E. Williams DIG-S24-254T5HO-WPR-STEP

DIMMING-277

DIRECT/INDIRECT 2 LAMP RECESSED FIXTURE, DUAL

LEVEL SWITCHING

B 11 H.E. Williams DIG-S24-154T5HO-WPR-EB1-277 DIRECT/INDIRECT 1 LAMP RECESSED FIXTURE

CD 8 PRESCOLITE LFD6LED277HDM-CLFLED7-35K-WHWT

B24

6" RECESSED LED CAN WITH LUTRON SERIES A LED

DRIVER AND 2000 LUMEN LED MODULE

CL 1 PRESCOLITE LFD6LED277-CLFLED5-35K-WHWTB24 6" RECESSED LED CAN WITH 1000 LUMEN OUTPUT

CW 3 PRESCOLITE LFD6LED277WW-6LFLED7-35K-WHWTB2

6" RECESSED LED CAN CONFIGURED TO WALL WASH

WITH LUTRON SERIES A DRIVER

D 16 Finelite Inc. S16WM-SSL-4-T5HO-SC-91W-277-FE-1.0 WALL MOUNTED LINEAR

E 10 DUAL LITE EVCUGWD4I CEILING MOUNTED EXIT SIGN, 277 VOLT

EE 14 DUAL LITE LZ20NI03L EMERGENCY LED WALLPACK, NICKEL CADMIUM

BATTERY, 6 VOLT,

EO 3 DUAL LITE EVO TWO LED OUTDOOR REMOTE EMERGENCY LIGHTING

HEADS

EW 1 DUAL LITE EVCUGWD4I WALL MOUNTED EXIT SIGN, 277 VOLT

F 10 HE WILLIAMS 73-4-154T5H-WG-73141-EB2-277 SINGLE LAMP STRIP FIXTURE WITH WIRE GUARD FE 1 HE WILLIAMS 73-4-1-54T5H-WG-73141-EB2-277-EM SINGLE LAMP STRIP FIXTURE WITH WIRE GUARD AND

BATTERY BACKUP

G 12 HE WILLIAMS 73-4-2-54T5H-WG-73141-EB2-277 DUAL LAMP STRIP FIXTURE WITH WIRE GUARD

H 18 HE WILLIAMS CL-4-354T5H-F-KSH-34RF-AMW-EB3-277

V

3 LAMP WALL MOUNTED CORNER LIGHT WITH CLEAR

ACRYLIC LENS

J 8 FINELITE S10-SSL-8-2T5HO-DC-91W-OPEN-277-A

C-EE-C4-1.0

SUSPENDED LINEAR PENDANT 8' NOMINAL LENGTH

K 3 FINELITE S16-SSL-12-2T5HO-DC-91W-OPEN-277-A

C-EE-C4-1.0

SUSPENDED LINEAR PENDANT 12' NOMINAL LENGTH

L 9 CROSSOVER XCHWM3-LED-WT LED 48

450-NW-UE-BLK

LED EXTERIOR WALL SCONCE

M 1 HUBBELL NVX15GHGA-NVBA WALL MOUNTED VAPOR-TIGHT FIXTURE, TOSHIBA

8A19/27F-UP LED LAMP, 120 VOLT

N 2 CROUSE HINDS 43961-116-GR ROOF MOUNTED, TWO HEAD, AIRCRAFT WARNING

LIGHT

O 2 Kim Lighting CFL1-27L3KUV-BL LED FLOODLIGHT WITH ADJUSTABLE BARN DOOR

LOUVERS (BD-CFL/BL), ON STANCHION MOUNT

(SM18BL), 8" ABOVE GROUND

P 6 KIM Lighting GEM1C-36L3K277-LG-NG-C PERFORMANCE BOLLARD MOUNTED ON CONCRETE

SHAFT. TO BE BURIED 3' 6"

EXISTING LIGHTING DEVICE SCHEDULE

Model Description

4 CONTACT CONTACTOR FOR LIGHTING CIRCUITS WITH ON/OFF/AUTO SWITCH AND REMOTE PHOTOCELL 4 CONTACT CONTACTOR FOR LIGHTING CIRCUITS WITH ON/OFF/AUTO SWITCH AND REMOTE PHOTOCELL

RMJ-16R-DV-B PULL BOX FOR LIGHTING SYSTEM WITH POWPAK RELAY MODULE

LRF2-OCR2B-P-WH CEILING-MOUNT WIRELESS OCCUPACY SENSOR WITH SURFACE OR RECESSED MOUNTING HARDWARE AS REQUIRED FOR LOCATIONS INSTALLED

PULL BOX FOR LIGHTING SYSTEM, TYPICAL, FOR REFERENCE ONLY, MORE BOXES MAY BE REQUIRED

PHOTOCELL FOR USE WITH SITE LIGHTING CIRCUITS

PHOTO CELL FOR AIRCRAFT WARNING LIGHTS

HEAVY DUTY 120/277 VOLT SINGLE POLE SNAP SWITCH WITH FACE PLATE

MRF2-6ANS-277-** WIRELESS SWITCH. WHEN DUAL LEVEL SWITCHING IS USED, ENSURE THAT BOTH SWITCHES ARE CONFIGURED TO RESPOND TO WIRELESS OCCUPANCY SENSOR (OS) IN AREA.

HEAVY DUTY 120/277 VOLT SINGLE POLE SNAP SWITCH WITH FACE PLATE FOR GARBAGE DISPOSER CONTROL, WIRE TO RECEPTACLE

MRF2-6ND-120-WH WIRELESS DIMMER

HEAVY DUTY 120/277 VOLT SINGLE POLE SNAP SWITCH WITH FACE PLATE FOR CONTROL OF EXHAUST FAN

Type Mark Count Manufacturer Model

CON1 1

CON2 1

JRM 2 LUTRON RMJ-16R-DV-B

OS 28 LUTRON LRF2-OCR2B-P-WH

PB 18

PC 1

PCAW 1

S1 17 HUBBELL 1221

S2 34 Lutron Electronics MRF2-6ANS-277-**

S3 1 HUBBELL 1221

S4 2 Lutron Electronics MRF2-6ND-120-WH

S5 1 HUBBELL 1221

Grand total: 107

(N) BL 1 HE WILLIAMS DIG-522-L32/840-WPR-DRV-277 DIRECT/INDIRECT RECESSED LED FIXTURE, 3200

LUMEN, ROUND PERFORATED BAFFLE, 4000K

E 700FA

E 701FA

E 800

FIRST FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN, SCHEDULE, AND LEGEND

SECOND FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN

PANELBOARDS LP11, LP12, AND EL11 SCHEDULES

PANELBOARDS LP13, LP21, AND LP22 SCHEDULESE 801

(N)BL 1 HE WILLIAMS 73-4-1-5476-4-L53/840-W6-7614-DRV-277 SINGLE LED LAMP, 5300 LUMEN, 4000K, WIRE GUARD

1ST FLOOR LIGHTING PLAN

SCALE

"=1' lv lv lv

J l v lv lv l v

D D

J J

J

JJ

J

J

J

JJ

J l v l v lvlv lv

J l v l v l v l v lv

S1 (b) S1 (a)

EW

LP13

CW (c)

CW (c)

CW (c)

A (d)

E

J (b)

G

CD

S1

S1 (e)

S1

E

S1

S2

S2

EO

EO

EO

OS

OS OS

OS

OS

OS

OS

OSOS

OS

OS

OS

GG

G G

M

S2 (a)

E-602

F (b)

F (a)

F (a)

F (b)

F (b) F (a)

F (a)

B

D

D

B

B B

B

A

A

A A

A

A

A A

F

D (a)

D (a)

A (d)

CL (e)

S2 S2

S2

H (b)H (a)H (b)

H (a)

H (a)

H (b)

H (a) H (b) H (a) H (b)

H (b)

H (a)

CD (b)

S4 (c) S4 (b)

S2

S2 (a)

A

T2LP11

HP11

SB2 SB1

EH11

T3

EL11

D1H2

METER

LP12

D

EE

EE

EE

EE

EE

EE

EE

CON2

S2 S2

S2 (d)

OS

CD (b)

CD (b)

CD (b)

TO UPPER LEVEL FIXTURES (SEE SECOND

FLOOR LIGHTING PLAN)

JRM

PCAW

PC

D (a)

E

E

EH11 -

J (a)

J (b)

J (a)

J (a)

J (a)

G

D

S2 (b)

S2

H (b)

CON1

S1

UP TO LIGHTS

ABOVE

SWITCH FOR

UPPER LIGHTS

S3

HP11 -

EH11 -

L

S2 (d)

HP11 -

13,15,17,4

S1 (a) S1 (b)

S1 (a) S1 (b)

TO UPPER LEVEL SWITCHES

S1

EL11 -

S2 (a) S2 (b)

EE

OS

OS

OS

CD

CD

S2

RD

(R) l v l v lv lv lv lv lv lv

J

J

J

J

JJ

J lv lv lvlv

J l v l v l v l v l v

JJ

K

KK

A

A

S1

S1

E E

E

E

(R)OS

OS

OS

OS

OS

OS

OS

OS OS

OS

OS

D

B

B

(N)BL

B B

B

F

F

D

D D

D

DD

A

D

A

CD

S2

S2

S2 S2

S2 S2

S2

S2

H (c)

FE

EE

EE

EE

EES2

S2S2

S2

FROM LOWER LEVEL

LIGHTING FIXTURES (SEE

FIRST FLOOR LIGHTING

PLAN)

JRM

L

S1 HP11 -

LP22

S1

E DS2 (c)

H (c)

G G

G

G G

G

EH11 -

LIGHTS SWITCHED FROM

SNAP SWITCH ON 1ST

FLOOR

EE

S5

S2S2

S2 (a) S2 (b)

EH11 -

DOWN TO

SUMP PUMP

2ND FLOOR LIGHTING PLAN

SCALE

"=1'

D1H2

(N)BL

J

WORK NOTES:

1 RELOCATE TYPE H FIXTURE NORTH TO AVOID NEW STAIR. MOVE FAR

ENOUGH TO MAINTAIN MINIMUM 7'-0" FROM RISER BELOW.

COORDINATE WITH FINAL STAIR SHOP DRAWINGS.

2 RELOCATE SWITCH S5 FOR EXHAUST FAN TO (N) JANITOR'S CLOSET.

1ST FLOOR POWER PLAN

"=1' t o

J1 J1

J1

J1

J

J1

J2

J2

SB1SB2

D1H2

LP13

R2

R2

R2

R2

R2 R2

R2 R2

R2

LP12

R1 R1

R1

R1

R1

R1

R5

R2

R2

R2

R2

R2 R2

R2R2

R4

R4

R1

R1

MSEMM

SGBB

DUCT RUN

UNDERNEATH

SIMULATOR

MGBB

TGBB

R2

R2

R2

R2

R2

R2

R2

R2

R1

R1

R1

R17

R1 R1

R1

R1R1R1

R1

R6

R6

R6

R6

R6

DISCONNECT FOR BRIDGE POWER

TVSS

MSA

D1

M2

R1

R2

R2 R2

R7

R9 R9 R8

LP12 -

1,3

LP12 - 3

LP12 - 5

LP12 - 2

LP12 -

4,6

LP13 -

LP13 -

METER

R10

R10

R10 R10R10

LP13 - 7

MSUPS

HCB1

MSSD

MSVAC

TVSS2

EPO

EPO

Sto

LP12 - 8

Vac

(R)MSAW

LP11 -

13,15,17

EL11 -

R1

LP11 -

LP13 - 1

LP13 - 5

EL11 - 4

LP12 - 9

SB2 - 3

LP13 - 8

R6

EL11 -

R13 WIRE TO PIT

LIGHT & SWITCH

LP13 - 4

LP13 - 6

R2

R2

R2R2R2

R2

E-602

LP13 -

16,18,20

LP13 -

10,12,14

LP13 - 3

LP13 -

EL11 -

EL11 -

EL11 -

EL11 -

HP11LP11

LP13 - 9

EL11

T3

EH11

LP12 -

11,13

NOTE: ALL CIRCUITS RUN TO PANEL LP13

SHALL HAVE AN ISOLATED GROUND AS

WELL AS AN EQUIPMENT GROUND

LP12 -

7,9

EL11 -

LP11 -

20,22,24

SGBB

R15

R15

LP13 -

P1

GHCP

GHSCP

HP11 -

HP11 -

36,38

S/P

MTS

T2

CRAC-1

MSS-1 -

1,3,5

UPS

(N)MSUPS

- 1,3,5

UPS - 1

MSUPS

- 2,4,6

R16

LP12 -

NOTE: ALL CIRCUITS RUN FROM ROOM 117

TO PANEL EL11 SHALL HAVE AN ISOLATED

GROUND AS WELL AS AN EQUIPMENT GROUND

SPACE FOR FUTURE ROOF

SOLAR COLLECTOR EQUIPMENT

MSS-1

LP11 -

14,16,18

MSPDU

LP11 -

INSTALL 2" CONDUIT UNDERGROUND AND

EXTEND UP INTO MECHANICAL ROOM

FOR IRRIGATION CONDUCTORS.

STAIR

EL11 -

VAVCP

VAVCP

FC

LP13 -

EL11 -

R6

LP11 -

(R)MSEMM

SB2-3

LP-12

LP-12

D1

DEMO NOTES:

1 REMOVE FOR RELOCATION

WORK NOTES:

1 RELOCATE MSEMM AND SB2-3 FROM EAST WALL TO SOUTH WALL, RELOCATE SHUNT TRIP LP12-8 VIA FA MODULE 1MO17

2 NEW GROUND BUSS BAR (SGBB) TO MGBB IN MECH 118, COORDINATE ROUTING BENEATH STAIR LANDING AND

THROUGH COMM ROOM OR THROUGH CEILING SPACE IN LOBBY 101

3 PROVIDE POWER AND CONTROL TO NEW COILING OVERHEAD DOORS

4 REMOVE EXISTING UPS AND RETURN TO GOVERNMENT (NEW UPS TO BE GOVERNMENT FURNISHED GOVERNMENT

INSTALLED, CONTRACTOR WIRED) REMOVE EXISTING MSUPS EQUIPMENT AND WIRING, AND REPLACE , SIZED TO SUPPORT

208V AND 240A LOAD

5 REMOVE AND REPLACE EXISTING WIRING FEEDING MSS-1, SIZE TO ACCOMMODATE UP TO 222A LOAD MSS-1 TO REMAIN

6 PROVIDE A LIMIT SWITCH(WITH NC CONTACTS) ON THE CRANE RAIL AT THE PARKED POSITION, PROVIDE WIRING IN CONDUIT

FROM LIMIT SWITCH BACK TO THE MOTION CONTROL CABINET, FIELD LOCATE PARKED POSITION

7 PROVIDE 3 HOTS AND GROUND TO GOVERNMENT SUPPLIED AIR CONDITIONER

8 RELOCATE MSAW (DRAWBRIDGE POWER DISCONNECT) SOUTH TO AVOID NEW STAIRCASE

9 APPROXIMATE LOCATIN OF GPS CABLE ENTERING COMPUTER ROOM CEILING (REFERENCE E-302)

10 GROUND CABLE SUPPORT AT NEW STAIR TO (E)SGBB

11 (E)SGBB IN COMPUTER ROOM LOCATED BELOW ACCESS FLOOR

12 COCKPIT A/C UNIT PROVIDED BY SIMULATOR CONTRACTOR, WIRED UNDER THIS CONTRACT

Notes:

Spare 64830 VA 100.00% 64830 VA

Receptacle 51010 VA 59.80% 30505 VA

Power 5800 VA 100.00% 5800 VA

Other 25554 VA 100.00% 25554 VA

Motor 76469 VA 111.26% 85078 VA Total Est. Demand: 445 A

Lighting 11232 VA 125.00% 14040 VA Total Conn.: 455 A

Heating 11200 VA 100.00% 11200 VA Total Est. Demand: 369653 VA

HVAC 80679 VA 100.00% 80679 VA Total Conn. Load: 378527 VA

Cooling 63172 VA 100.00% 63172 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 539 A 530 A 525 A

Total Conn. Load: 149151 VA 146636 VA 145553 VA

1 SB2 3 800 A 800 A 149151 VA 146636 VA 145553 VA

CKT Circuit Description # of Poles Frame Size Trip Rating

A B C

Remarks

Notes:

Enclosure: NEMA 1 MCB Rating: 800 A

Mounting: PAD Wires: 4 Mains Rating: 800 A

Supply From: T-1 Phases: 3 Mains Type:

Location: Volts: 480/277 Wye A.I.C. Rating: 42000

Switchboard:SB1

23"

4"

.25"

GROUND BUSS-MGBB,TGBB, OR SGBB

N.T.S.

2ND FLOOR POWER PLAN

SCALE

"=1'

J

J

J

J

J

J

J

LP21

R2

R2

R2

R2

R2R2

R4

R4

R1

R1

R1

R1

SGBB

LOCATE AT WIRING "WATERFALL"

ON TOWER

R7LP22 - 5

R11

R2 R2

R2

R2 R2 R2

R2 R2

R2

R2 R2

R2

R2

R2

R2 R2 R2

R2R2R2R2

R1

R1

R1

R1

R1

R12 R12 R12

R9 R9 R9 R9

LP22 -

6,8

LP22 - 2

R2

LP21 - 2

LP21 - 3

LP21 - 7

LP21 - 6

LP21 - 4

E-602

LP21 - 5

LP22 - 8

LP22 - 7

LP22 -

1,3

LP22 - 9

NOTE: ALL CIRCUITS RUN TO PANEL LP21

SHALL HAVE AN ISOLATED GROUND AS

WELL AS AN EQUIPMENT GROUND

R1

LP21 - 1

R2 D9H3

CC

HP11 -

20,22,24

R15 R15

R15

R15

R15

LP22 -

GPB

GPB

GPB

GPB

GPB

LP22

R5 R5 R5

R5

LP22 -

2,4 LP22 -

LP22 -

LP22 -

WORK NOTES:

1 RELOCATE RECEPTACLES IN WEST WALL OF CLASSROOM 210 TO AVOID NEW DOOR OPENING

2 MOUNT GPS ANTENNA (REFERENCE A-302 FOR APPROXIMATE LOCATION) ROUTE CABLE TO INTERIOR, SEAL WALL

PENETRATION

3 INSTALL SURGE PROTECTOR AS CLOSE AS POSSIBLE TO WALL PENETRATION, PROVIDE GROUND IN CONDUIT TO NEW SGBB

BELOW

4 COORDINATE ROUTING OF GPS CABLE WITH EXISTING MECH/ELEC/PLUMB ON WALLS OFFSET AS REQUIRED (REFERENCE

E-301 FOR CONTINUATION)

5 PROVIDE 2" AND 6" CONDUIT STUB THROUGH FLOOR FOR SNS POWER AND COMM

Notes:

Spare 64830 VA 100.00% 64830 VA

Receptacle 51010 VA 59.80% 30505 VA

Power 5800 VA 100.00% 5800 VA

Other 25554 VA 100.00% 25554 VA

Motor 76469 VA 111.26% 85078 VA Total Est. Demand: 445 A

Lighting 11232 VA 125.00% 14040 VA Total Conn.: 455 A

Heating 11200 VA 100.00% 11200 VA Total Est. Demand: 369653 VA

HVAC 80679 VA 100.00% 80679 VA Total Conn. Load: 378527 VA

Cooling 63172 VA 100.00% 63172 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 539 A 530 A 525 A

Total Conn. Load: 149151 VA 146636 VA 145553 VA

8 H-1, H-2, H-3 3 60 A 60 A 11400 VA 11400 VA 11400 VA

7 ACC-1 3 200 A 125 A 20633 VA 20633 VA 20633 VA

6 MTS 3 200 A 200 A 30668 VA 31459 VA 30853 VA

5 T2 3 200 A 175 A 48792 VA 43151 VA 43027 VA

4 TVSS 3 60 A 60 A 0 VA 0 VA 0 VA

3 MSEMM 3 100 A 100 A 19214 VA 19214 VA 19214 VA

2 HCB1 3 60 A 40 A 7834 VA 7834 VA 7834 VA

1 HP11 3 200 A 200 A 14054 VA 16344 VA 16016 VA

CKT Circuit Description # of Poles Frame Size Trip Rating

A B C

Remarks

Notes:

Enclosure: NEMA 1 MCB Rating: 1 A

Mounting: PAD Wires: 4 Mains Rating: 800 A

Supply From: SB1 Phases: 3 Mains Type:

Location: Volts: 480/277 Wye A.I.C. Rating: 30000

(E)Switchboard:SB2

CONTRACTOR INSTALLED GOVERNMENT PROPERTY - GPS ANTENNA:

1. GPS ANTENNA, MOUNTING BRACKET, SURGE PROTECTOR, AND RG58 CABLE ARE GOVERNMENT FURNISHED, CONTRACTOR

INSTALLED

2. CONTRACTOR SHALL PROVIDE AND INSTALL CONDUIT AND ACCESSORIES FROM EXTERIOR WALL PENETRATION TO

VERTICAL DROP 5' A.F.F. IN CENTER OF COMPUTER ROOM, COORDINATE WITH FUTURE CABINET LOCATION

3. CONTRACTOR SHALL PROVIDE TYPE N CABLE CONNECTIONS AT ANTENNA AND SURGE PROTECTOR

4. CONTRACTOR SHALL PROVIDE GROUND AND CONDUIT FORM SURGE PROTECTOR TO NEW SGBB BELOW

5. GOVERNMENT WILL PROVIDE CABLE FINAL CONNECTION AT FUTURE GPS RECEIVER IN COMPUTER ROOM

ELECTRICAL EQUIPMENT SCHEDULE

Type Mark Count

HAS ISOLATED

GROUND BUS Description Comments

EMM(N) 1 No ELECTRIC MOTION CABINET TO BE PROVIDED BY SIMULATOR CONTRACTOR (NOT IN THIS CONTRACT)

FC 1 FUSE CABINET BY EC TO STORE SPARE FUSES

HP11 1 No 277/480 VOLT, 3 PHASE, 4 WIRE, 200 AMP, NEMA 1 LP11 1 Yes 120/208 VOLT, 3-PHASE, 4 WIRE, 400 AMP, 400 AMP MAIN PANELBOARD LP12 1 No 120/208 VOLT, 3-PHASE, 4 WIRE, 200 AMP, MAIN LUG ONLY PANELBOARD LP13 1 Yes 120/208 VOLT, 3-PHASE, 4 WIRE, 200 AMP, MAIN LUG ONLY PANELBOARD LP21 1 No 120/208 VOLT, 3-PHASE, 4 WIRE, 200 AMP, MAIN LUG ONLY PANELBOARD LP22 1 No 120/208 VOLT, 3-PHASE, 4 WIRE, 200 AMP, MAIN LUG ONLY PANELBOARD METER 1 No METER MSA 1 No 120/208 VOLT, 3-PHASE, 4 WIRE, 50 AMP, SHUNT TRIP BREAKER, WITH FRONT LOCKING DEVICE TO ENABLE PADLOCK IN THE

OPEN POSITION

MSAW (R) 1 No 120 VOLT, 20 AMP, 1 PHASE, SHUNT TRIP BREAKER, WITH FRONT LOCKING DEVICE TO ENABLE PADLOCK IN THE OPEN

POSITION

WIRE SHUNT TRIP INTO BUILDING FIRE ALARM SYSTEM FOR SHUT

DOWN

MSEMM (R) 1 No 277/480 VOLT, 3-PHASE, 4 WIRE, 100 AMP, SHUNT TRIP BREAKER, WITH FRONT LOCK DEVICE TO ENABLE PADLOCK IN THE

OPEN POSITION

WIRE SHUNT TRIP INTO BUILDING FIRE ALARM SYSTEM FOR SHUT

DOWN

MSPDU 1 No 120/208 VOLT, 3-PHASE, 4 WIRE, 100 AMP, SHUNT TRIP BREAKER, WITH FRONT LOCKING DEVICE TO ENABLE PADLOCK IN

THE OPEN POSITION

MSS-1 1 No 120/208 VOLT, 3-PHASE, 4 WIRE, 200 AMP, SHUNT TRIP BREAKER, WITH FRONT LOCKING DEVICE TO ENABLE PADLOCK IN

THE OPEN POSITION

MSSD 1 No 120 VOLT, 1-PHASE, 2 WIRE, 20 AMP, SHUNT TRIP BREAKER MSUPS (N) 1 No 120/208 VOLT, 3-PHASE, 4 WIRE, 240 AMP, SHUNT TRIP BREAKER, WITH FRONT LOCKING DEVICE TO ENABLE PADLOCK IN

THE OPEN POSITION

WIRE SHUNT TRIP INTO EPO SWITCH

MSVAC 1 No 120 VOLT, 1-PHASE, 2 WIRE, 20 AMP, SHUNT TRIP BREAKER WITH FRONT LOCKING DEVICE TO PADLOCK IN THE OPEN

POSITION

MTS 1 No 277/480 VOLT, 3 PHASE, 4 WIRE, 200 AMP MANUAL TRANSFER SWITCH P1(N) 1 No WST POWER CABINET BY SIMULATOR CONTRACTOR (NOT IN THIS CONTRACT)

SB1 1 No 277/480 VOLT, 3 PHASE, 4 WIRE, 800 AMP MAIN BREAKER, CT SPACE FOR CLF&P METERING MAIN SWITCH AND CT SECTION OF MAIN SWITCHBOARD SB2 1 No DISTRIBUTION SECTION, 277/480 VOLT, 3 PHASE, 4 WIRE , 800 AMP DISTRIBUTION SECTION OF MAIN SWITCHBOARD T2 1 Yes 480 VOLT, DELTA PRIMARY - 120/208 VOLT WYE SECONDARY, 112.5 KVA DRY TYPE STEP DOWN TRANSFORMER, K4 RATING, SHIELDED, 3% IMPEDANCE

T3 1 No 480 VOLT, DELTA PRIMARY - 120/208 VOLT WYE SECONDARY, 75 KVA DRY TYPE STEP DOWN TRANSFORMER, K4 RATING, SHIELDED, 3% IMPEDANCE

T-1 1 No TRANSFORMER BY CLF&P UPS (N) 1 No 75 KVA (N) UPS GOV FURNISHED GOV INSTALLED, E.C. WIRING AND FINAL CONNECTION (SEE ONE LINE)

CC 1 No OVERHEAD CRANE CONNECTION POINT, PROVIDED BY GC, WIRED BY EC, FIELD LOCATE EXACT CONNECTION POINT

UTILITY TRANSFORMER

277/480V, 3PH, 4W

ELECTRIC METER

A

MTS

E

S/P F

C

HCB1

I

T-1 K

T-2

HP11

LP11

M

LP21 LP22

LP12

LP1

P

Q

T

O

(N)MSUPS

R

MSEMM

(N)EMM

N.I.C.

(N)UPS

N.I.C.

CRAC-1

DISC-H1

N

WST COMPUTER ROOM FLOOR

FIRST FLOOR

TVSS

J

TVSS2

Y

MSA

D1

S

V

P1

U W

MSS-1

Z

Z1

X

UPON COMPLETION OF PROJECT THE FOLLOWING MEASUREMENTS SHALL BE MADE OVER A PERIOD OF SEVERAL DAYS (THE RESULTS TO BE SENT TO CAE FOR ANALYSIS) PREFERABLY WHEN THE AREA OF INTEREST AND ANY NEAR-BY AREAS HAVE THEIR FULL COMPLEMENT OF ELECTRICAL EQUIPMENT INSTALLED AND OPERATED:

MAIN INPUT VOLTAGE VARIATIONS, SAGS AND SURGES (ALL PHASES AND NEUTRAL)

FREQUENCY VARIATIONS

TRANSIENTS MAGNITUDE EXCEEDING 1.5 TIMES THE NOMINAL VOLTAGE

TRANSIENTS DURATION EXCEEDING 1/2 POWER CYCLE

NUMBER AND DURATION OF POWER OUTAGES

1" CONDUIT FOR METER WIRING

WST COMPUTER ROOM LOWERED FLOOR

EH11

EL11

SB1 SB2

D1H2

D

T3 HG

L

PDU

Z2

MSPDU

Z3

Z4

ELECTRICAL FEEDER SCHEDULE

FEEDER

DESIGNATION

FOR ONE LINE Panel Circuit Number Load Name Wire Size

Conduit Size When

Larger Than 1/2" Voltage

ASCI At Load Comments

A T-1 1 SB1 3 runs of 3-#300, 1-#300, 1-#1/0 3 - 3" 480 V 28739

C SB2 6 MTS 3-#3/0, 1-#3/0, 1-#6 2" 480 V 24268

D MTS 2 D1H2 3-#3/0, 1-#3/0, 1-#6 2" 480 V LESS THAN 10000

E D1H2 1,3,5 S/P 3-#3/0, 1-#3/0, 1-#6 2" 480 V LESS THAN 10000

F MTS 1 EH11 3-#3/0, 1-#3/0, 1-#6 2" 480 V 22769

G EH11 1,3,5 T3 3-#3, 1-#3, 1-#6 1 1/4" 480 V 20728

H T3 1 EL11 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000

I SB2 2 HCB1 3-#8, 1-#8, 1-#10 1 1/4" 480 V 4561

J SB2 4 TVSS 3-#6, 1-#6, 1-#10 1" 480 V 19482

K SB2 1 HP11 3-#3/0, 1-#3/0, 1-#6 2" 480 V 27172

L SB2 5 T2 3-#2/0, 1-#2/0, 1-#6 2" 480 V 25064

M T2 1 LP11 2 runs of 3-#3/0, 1-#3/0, 1-#3 2 - 2" 208 V LESS THAN 10000

N (R) SB2 3 MSEMM 3-#3, 1-#3, 1-#8 (N) 240 A 1 1/4" 480 V 7373

O LP11 1,3,5 LP12 3-#1/0, 1-#1/0, 1-#6 2" 208 V LESS THAN 10000

P LP11 2,4,6 LP21 3-#1/0, 1-#1/0, 1-#6 2" 208 V LESS THAN 10000

Q LP11 8,10,12 LP22 3-#1/0, 1-#1/0, 1-#6 2" 208 V LESS THAN 10000

R (N) LP11 20,22,24 MSUPS 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000

S LP11 13,15,17 MSA 3-#6, 1-#6, 1-#10 1" 208 V LESS THAN 10000

T LP11 7,9,11 LP13 3-#1/0, 1-#1/0, 1-#6 2" 208 V LESS THAN 10000

U HCB1 1,3,5 CRAC-1 3-#8, 1-#8, 1-#10 1 1/4" 480 V LESS THAN 10000

V (N) MSA 1 D1 HVAC WST HIGH BAY 124 3-#6, 1-#6, 1-#10 1" 208 V LESS THAN 10000 VERIFY WIRE AND CONDUIT WITH PROVIDED A/C

W (N) MSUPS 1,3,5 UPS 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000

X (R) MSEMM 1 EMM 3-#3, 1-#3, 1-#8 1 1/4" 480 V LESS THAN 10000 VERIFY WIRE AND CONDUIT SIZE

Y MSUPS 2,4,6 TVSS2 3-#10, 1-#10, 1-#10 1/2" 208 V LESS THAN 10000

Z (N) UPS 1 MSS-1 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000

Z1 MSS-1 1,3,5 P1 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000 WIRING FROM BREAKER TO EQUPMENT NOT REQUIRED IN THIS CONTRACT Z2 SB1 1 SB2 3 runs of 3-#300, 1-#300, 1-#1/0 480 V 28739

Z3 LP11 14,16,18 MSPDU 3-#3, 1-#3, 1-#8 1 1/4" 208 V LESS THAN 10000

Z4 MSPDU 1,3,5 PDU 3-#3, 1-#3, 1-#8 1 1/4" 208 V WIRING FROM BREAKER TO EQUPMENT NOT REQUIRED IN THIS CONTRACT

WORK NOTES:

1 (N) UPS TO BE GOVERNMENT PROVIDED AND CONTRACTOR TO

PROVIDE WIRING AND FINAL CONNECTION

2 (N) D1 TO BE GOVERNMENT PROVIDED AND CONTRACTOR TO

PROVIDE WIRING AND FINAL CONNECTION

3 (N) EMM TO BE GOVERNMENT PROVIDED AND CONTRACTOR

VERIFY WIRE AND CONDUIT, SIZE FOR INCREASED LENGTH OF RUN

VERIFY WIRE AND CONDUIT, SIZE FOR 240 A

VERIFY WIRE AND CONDUIT, SIZE FOR 222 A

ELECTRICAL ONE LINE

N.T.S.

(R)

(N)GARAGE

DOOR

(N)GARAGE

DOOR

Z6

Z5

VERIFY WIRE AND CONDUIT, SIZE FOR 240 A

Z5 LP12 FIELD VERIFY GARAGE DOOR 208 V

Z6 208 V VERIFY WIRE AND CONDUIT, SIZE FOR PROVIDED DOORLP12 FIELD VERIFY GARAGE DOOR

VERIFY WIRE AND CONDUIT, SIZE FOR PROVIDED DOOR

Z7 LP12 OR 21

N.I.C.

SNS 200 V VERIFY WIRE AND CONDUIT

GROUNDING ONE LINE FOR SEPARATELY DERIVED SYSTEMS

N.T.S.

MAIN SERVICE

SWITCH

NEUTRAL BUSS

GROUND BUSS

BOND NEUTRAL BUSS TO GROUND BUSS

UFER GROUND TO

BAR IN FOUNDATION

# 4

# 3/0 TO BUILDING STEEL

# 3/0 TO BUILDING WATER PIPING

2/0 GROUND LOOP AROUND

BUILDING, GROUND RODS

MINIMUM EVERY 20'0" AND AT

ALL CORNERS AS SHOWN

MGBB

SGBB

SGBB

SGBB

2/0

AT EMM

LOCATED WITHIN 78"

OF P1 CABINET

AT WIRING "WATER FALL"

TGBB

IN COMM RM

3/0

LIGHTNING PROTECTION SYSTEM SHALL

BE TIED INTO GROUND SYSTEM

BOND TO CABLE SUPPORT

WITH # 6

GENERATOR

DISCONNECT

NEUTRAL BUSS

GROUND BUSS

# 4

FIRE ALARM &

MASS NOTIFICATION

PANEL(S)

RADIO ANTENNA FOR

FIRE ALARM AND MASS

NOTIFICATION SYSTEM

LIGHTNING ARRESTOR

WITH ENCLOSURE

BOND TO EVERY FOURTH RISER

OF RAISED COMPUTER ROOM

FLOOR WITH #6

120/208 VOLT

CONDUIT, (TYPICAL)

NEUTRAL (TYPICAL)

EQUIPMENT GROUND

TYPICAL

ISOLATED GROUND

BONDING CONDUCTOR

480 VOLT CONDUIT

EQUIPMENT GROUND

# 4 COPPER (1/0 FOR 150 KVA

TRANSFORMER

480 DELTA/

120/208 Y

XFRM

GB2

GROUNDING ONE LINE

N.T.S.

(N) SGBB

AT (N) EMM

LOCATION

1ST FLOOR HVAC POWER PLAN

"=1'

B1 B2

EL11 - 7

PHWP-1

PHWP-2

BP-1

BP-2

EL11 - 6

EL11 - 8

D1H3

EH11 -

7,9,11

D2H3

PCWP-2

PCWP-1

DCP-1DCP-2

HP11 -

8,10,12

HP11 -

7,9,11

HP11 -

14,16,18

HP11 -

13,15,17

D3H3

D4H3

D5H3

D6H3

T2LP11

HP11

SB2 SB1

EH11

T3

EL11

EH11 -

8,10,12

EUH-1

EL11 -

9,11

SB2 - 2

HCB1

ECH-1

EL11 -

HP11 -

19,21,23

D8H3

DC-1

ACC-1

Vac

VAVCP

VAVCP

HCB1 -

1,3,5

HCB1

CRAC-1

MSVAC

MSVAC

- 1

EL11 -

SB2 - 7

EMM

MSEMM

MSAW

MSA

D1

LP12

M2

MSSD

UPS

MSUPS

MSS-1

P1

LP13

GHSCP

GHCP

EL11 -

FAC

D1H2

METER

MTS

HP11

SCU-1B

WIRE TO SCU-1A IN THE

MECHANICAL ROOM ABOVE

EF-3

EL11 -

D2L3

EL11 -

GP

EL11 -

EL11 -

BC

EL11 -

DDC

EL11 -

(N)CP-1

MECHANICAL EQUIPMENT SCHEDULE

Type Mark Count Description

ACC-1 1 AIR COOLED CHILLER PROVIDED AND INSTALLED BY MC, WIRED BY EC. UNIT

IS PROVIDED WITH DISCONNECT SWITCH AND CIRCUIT BREAKERS

AHU1R 1 AHU-1 RETURN MOTOR, 20 HP, PROVIDED AND INSTALLED BY MC, WIRED BY

EC

AHU1S 1 AHU-1 SUPPLY MOTOR, 15 HP. PROVIDED AND INSTALLED BY MC, WIRED BY EC

B1 1 GAS BOILER AND CONTOLS SUPPLIED BY MC, WIRED BY EC, EC TO PROVIDE

Sto (THERMAL OVERLOAD SWITCH) FOR CIRCUIT

B2 1 GAS BOILER AND CONTROLS SUPPLIED BY MC, WIRED BY EC, EC TO PROVIDE

Sto (THERMAL OVERLOAD SWITCH) FOR CIRCUIT

BP-1 1 BOILER PUMP PROVIDED AND INSTALLED BY MC, WIRE BY EC. EC SHALL

PROVIDE A Sto FOR DISCONNECTING AND OVERLOAD PROTECTION

BP-2 1 BOILER PUMP PROVIDED AND INSTALLED BY MC, WIRE BY EC. EC SHALL

PROVIDE A Sto FOR DISCONNECTING AND OVERLOAD PROTECTION

CRAC-1 1 AIR CONDITION UNIT FOR SWT ROOM, PROVIDED AND INSTALLED BY MC,

WIRED BY EC

D1 1 AIR CONDITIONING UNIT FOR FLIGHT TRAINEE STATION

DC-1 1 FLUID COOLER PROVIDED AND INSTALLED BY MC, EC TO WIRE

DCP-1 1 DRY COOLER PUMP AND STARTER BY MC, WIRED BY EC

DCP-2 1 DRY COOLER PUMP AND STARTER BY MC, WIRED BY EC

DDC 2 TEMPERATURE CONTROL PANEL BY MC, POWER PROVIDED TO PANEL BY EC

ECH-1 1 ELECTRIC CEILING HEATER PROVIDED AND INSTALLED BY MC, WIRED BY EC.

EC TO PROVIDE Sto FOR DISCONNECTION AND OVERLOAD PROTECTION

EF-1 1 EXHAUST FAN WITH INTERGRAL DISCONNECT SWITCH PROVIDED AND

INSTALLED BY MC, WIRED BY EC

EF-2 1 EXHAUST FAN PROVIDED AND INSTALLED BY MC, WIRED BY EC. EC TO

PROVIDE WALLS SWITCH TO WIRE TO EXHAUST FAN FOR CONTROL

EF-3 1 EXHAUST FAN PROVIDED AND INSTALLED BY MC, WIRED BY EC. EC TO

PROVIDE AND INSTALL A Sto FOR OVERLOAD AND DISCONNECTION

EUH-1 1 ELECTRIC UNIT HEATER PROVIDED AND INSTALLED BY MC, WIRED BY EC.

EUH-2 1 ELECTRIC UNIT HEATER PROVIDED AND INSTALLED BY MC, WIRED BY EC.

FAC 1 FIRE PROTECTION AIR COMPRESSOR PROVIDED AND INSTALLED BY FIRE

PROTECTION INSTALLER, WIRED BY EC, EC TO PROVIDE Sto FOR DISCONNECT

AND OVERLOAD PROTECTION

GP 1 GLYCOL PUMP

H-1 2 HUMIDIFIER PROVIDED AND INSTALLED BY MC, WIRED BY EC

H-2 1 HUMIDIFIER PROVIDED AND INSTALLED BY MC, WIRED BY EC

H-3 1 HUMIDIFIER PROVIDED AND INSTALLED BY MC, WIRED BY EC

M1 1 ELEVATOR MOTOR, PROVIDED AND INSTALLED BY GC. WIRED BY EC.

M2 1 BATTERY FOR DRAW BRIDGE, WIRED UNDER ANOTHER CONTRACT

PCWP-1 1 CHILLED WATER PUMP AND STARTER BY MC, WIRED BY EC

PCWP-2 1 CHILLED WATER PUMP AND STARTER BY MC, WIRED BY EC

PHWP-1 1 HOT WATER HEAT, PUMP AND STARTER BY MC, WIRED BY EC

PHWP-2 1 HOT WATER HEAT, PUMP AND STARTER BY MC, WIRED BY EC

SCU-1A 1 SPLIT SYSTEM AC UNIT FOR IC ROOM, PROVIDED AND INSTALLED BY MC,

WIRED BY EC

SCU-1B 1 SPLIT SYSTEM FAN COIL UNIT FOR IC ROOM, PROVIDED AND INSTALLED BY

MC, WIRED BY EC

Vac 1 BATTERY VACUUM PUMP, WIRED BY EC

VAVCP 3 VAV BOX CONTROL POWER. EC TO PROVIDE POWER TO A J-BOX ABOVE THE

CEILING AT LOCATIONS SHOWN. THESE ARE TO BE USED BY CONTROL

CONTRACTOR FOR POWER TO VAV BOXES

WHP 1 WATER HEATER CIRCULATOR PUMP

NOTE: ALL 3D AND SECTION VIEWS ARE SHOWN TO HELP CONTRACTOR

INTERPRET DESIGN. THESE VIEWS SHALL NOT BE USED AS A MODEL

FOR CONSTRUCTION. REFER TO THE ARCHITECTURAL DRAWINGS FOR

ALL BUILDING CONSTRUCTION REQUIREMENTS

CP-1 1 CONDENSATE PUMP FOR COCKPIT A/C UNIT

1ST FLOOR SECURITY

"=1'

C R

K

C R

CR

C R

CR

CR

KP

E-602

OC

CC

CR

PS

WM

WM

WM WM

(R)WM

WM

WMWM

CM CM

CM

CM

CM

CM

CM

LP11

T2

HP11

SB2

SB1

D1H2

METER

LP12

OC

MSSD

HCB1

MSUPS

UPS

MSS-1

P1

MSVAC

T3

EL11

GHSCP

GHCP

EH11

MTS

D4H3

D3H3

D1H3 D2H3

LP13

CM

PS

C

R(N)CR

(N)CC

2ND FLOOR SECURITY

SCALE

"=1'

C R

J

OC

OC

PS

SP

2 - 2" CONDUITS FROM

SECURITY PANELS DOWN INTO

IT ROOM BELOW

CR

EL11 - 1

CC

D9H3

LP22

LP21

C R

(N)CR

(N)CC

SECURITY LEGEND

CARD READER

KEY PAD

SECURITY PANELSP

CR

K

PS PROXIMITY SWITCH

WM WALL MOUNTED MOTION SENSOR

CC CEILING CAMERA

OC OUTSIDE WALL MOUNTED CAMERA

CM CEILING MOTION DETECTOR

KP

CR

SECURITY DEVICE SCHEDULE

Type Mark Count Manufacturer Description

CC 1 BY ADVANTOR DOME CEILING CAMERA, CABLE MAY BE RUN EXPOSED ABOVE DROP CEILING AND MAY RUN IN CABLE TRAY

CM 8 BY ADVANTOR CEILING MOTION SENSOR, RUN CABLE IN 3/4" CONDUIT BACK TO SECURITY PANEL

CR 6 BY ADVANTOR CARD READER, CABLE IN 3/4" CONDUIT BACK TO SECURITY PANEL

KP 1 BY ADVANTOR KEY PAD, RUN CABLE IN 3/4" CONDUIT BACK TO SECURITY PANEL

OC 4 BY ADVANTOR IMPACT-RESISTANT WALL MOUNTED DOME CAMERA, PROVIDE 3/4" FLEX FROM CAMERA TO BOX ON WALL THEN 3/4" CONDUIT WITH CAMERA CABLE BACK TO THE

SECURITY PANEL, CABLE MAY RUN IN CABLE TRAY

PS 2 BY ADVANTOR DOOR POSITION SENSOR, RUN CABLE IN 3/4" CONDUIT BACK TO SECURITY PANEL

SP 1 BY ADVANTOR SECURITY PANELS (2)

WM 9 BY ADVANTOR WALL MOTION SENSOR FOR SECURITY SYSTEM, MOUNT AT 9'0" AFF. RUN CABLE IN 3/4" CONDUIT BACK TO SECURITY PANEL

WORK NOTES:

1 RELOCATE WALL MOTION SENSOR NORTH TO CLEAR STAIRS AND STILL COVER DOOR

NOTES:

(1) ALL SENSORS TO BE D2939 CEILING

MOUNT PIR INTRUSION DETECTORS WITH WIRE

TO BE RUN IN EMT TO MOTION SENSOR PANEL

(2) ALL WIRE SHALL BE RUN IN EMT.

(3) M62 MAG LOCK - WITH TSC-20 TAMPER

SWITCH INCLUDES DOOR POSITION SWITCH

(4) CARD READER - MULTICLASS CARD

READER

(5) EXIT BUTTON - 5TH SERIES 2000 STOPPER

STATION

(6) REQUEST TO EXIT DETECTOR - DS150i / DS151i

(7) KEY PAD - INGRAGUARD TOUCH SCREEN

KEY PAD

(8) ALL JUNCTION BOXES TO CONTAIN

TAMPER SWITCHES

2.

1.

STRIKEPLATE

(4) INCARD READER (TYP)

DOOR

SIDE OF

UN-SECURE

FINISHED FLOOR DOOR

SECURE SIDE OF

REQUEST-TO-EXIT SENSOR

3/4" CONDUIT (TYP)

EXIT BUTTON

JUNCTION BOX

JUNCTION BOX

(3) M62 MAGLOCK (TYP)

3/4" CONDUIT (TYP)

(1) 3/4" CONDUIT (TYP)

3/4" CONDUIT (TYP)

FINISHED CEILING

CONDUIT SYSTEM

3/4" EMT CONDUIT TO SECURITY

3/4" CONDUIT

3/4" HOLE

DOORSTOP

MAG LOCK

M62DOOR

HEADER

JUNCTION BOX

SINGLE ENTRY SECURITY DOOR DETAIL

N.T.S

DPEZ182200 8-14-20 COVER COVER (1)
DPEZ182200 8-14-20 A-101-A 101
DPEZ182200 8-14-20 A-102-A 102
DPEZ182200 8-14-20 A-201-A 201
DPEZ182200 8-14-20 A-202-A 202
DPEZ182200 8-14-20 A-302-A 302
DPEZ182200 8-14-20 A-401-A 401
DPEZ182200 8-14-20 A-402-A 402
DPEZ182200 8-14-20 M P-100-P-100
DPEZ182200 8-14-20 M-101-M 101
DPEZ182200 8-14-20 M-102-M 102
DPEZ182200 8-14-20 P-101-P-101
DPEZ182200 8-14-20 E-100-E 100
DPEZ182200 8-14-20 E-101-E-101
DPEZ182200 8-14-20 E-201-E 201
DPEZ182200 8-14-20 E-202-E-201
DPEZ182200 8-14-20 E-300-E-300
DPEZ182200 8-14-20 E-301-E-301
DPEZ182200 8-14-20 E-302-E-302
DPEZ182200 8-14-20 E-401-E-401
DPEZ182200 8-14-20 E-500S-E 500S
DPEZ182200 8-14-20 E-501S-E-501

File details come from the government source that posted it. Updated .