2020-09-15 DPEZ182200 ADDENDUM 1 REPAIR SIM FAC FOR DELIVERY BRIDGING DOCS.pdf
PDF 4 MB Posted
- Attached to
- Modifications to C130 Simulator Building
- Solicitation number
- W50S8W20R0011
- Issued by
-
Department of the Army National Guard
About this file
This document package includes construction drawings and specifications for modifications to a C-130 simulator building. The drawings detail proposed architectural, structural, mechanical, electrical, and security system upgrades. Key work includes installing a retractable drawbridge stair, modifying classroom and briefing room layouts, upgrading HVAC, electrical, and fire protection systems, and adding security access controls and cameras. Bidders should price the design and construction in accordance with the specifications, with quotes due by September 21, 2020. The pre-bid site visit will be held on September 1 and questions are due by September 10. The solicitation is for a design-build contract between $250,000-$500,000 through the Department of the Army National Guard.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPV
MECHANICAL/FIRE
PROTECTION
WST SIM MAINT
PARTS STOR
WST HIGH BAY
INSTRUCTORS
SUITE
WST COMPUTER ROOM
DATA STORAGE/SAFE
COMM
VESTIBULE
MAINT
RECEPTION
LOBBY
SITE MGR
(CONTRACT)
PO/QAR
(GOV'T)
MEN
WOMEN
OFFICE
SECURITY
ELEV
CORR.
STAIR
STAIR
WORK NOTES:
1 (E) 24"x12" COMM TRENCH
2 (E) RAISED FLOOR SYSTEM
3 REMOVE EXISTING TRANSLUCENT PANELS (AND RETURN TO THE GOVERNMENT) ONLY ONCE ROLL-UP DOORS ARE DELIVERED AND READY FOR
INSTALLATION
4 FIRESTOP BELOW FLOOR OPENING AFTER SIM INSTALLATION IS COMPLETE
5 FROST WINDOW TO SAME OPACITY AS WINDOW IN RM 114
6 PAINT FLOOR WITH OIL RESISTANT NON-SLIP PAINT, PREP SURFACE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS
7 NEW WELDED METAL STAIR, PROVIDE SHOP DRAWING STAMPED BY STRUCTURAL ENGINEER
8 REMOVE EXISTING KABA LOCK AND RETURN TO GOVERNMENT, NO EXTERIOR HARDWARE, PROVIDE BLANK COVER PAINTED TO MATCH DOOR WITH
TAMPER RESISTANT FASTENERS
9 COORDINATE NEW WALL AND DOOR WITH STRUCTURAL STEEL ABOVE TO SECURE STUDS TO STEEL AND PROVIDE DIAGONAL BRACING. PROVIDE
EXPANDED METAL MESH ABOVE CEILING AT VERTICAL FACE OF STUDS AROUND PIPING AND DUCTWORK. OVERLAP MINIMUM 4" AND SPOT WELD
MAXIMUM 96 SQUARE INCH OPENINGS WITH MAXIMUM 6" DIMENSION IN ANY DIRECTION
10 COAT ENTIRE FLOOR WITH OIL RESISTANT NON SLIP COATING. PROVIDE EXPANSION JOINT MATERIAL AT MOTION SLAB. PAINT TRENCH COVERS
INDIVIDUALLY, PREPARE SURFACES TO BE COATED IN ACCORDANCE WITH RESINOUS FLOORING MANUFACTURER'S RECOMMENDATIONS
11 NOT USED
12 GRIND CONCRETE AT PAD LOCATIONS ON REACTION PAD WITHIN TOLERANCES IN TFR
DEMO NOTES:
1 REMOVE FLOOR TILES IN RM 116 AND GRIND ADHESIVE WITH DIAMOND IMPREGNATED
BLADE DESIGNED FOR ADHESIVE REMOVAL, REPAIR ANY DAMAGE TO EXISTING
EXPANSION JOINT SEALANT AROUND MOTION BASE
A
A
U P
(E)REACTION PAD
P7
1ST FLOOR PLAN
SCALE
"=1'
TYPICAL PARTITION TYPE
SCALE 1"=1'
P7
2ND FLOOR PLAN
SCALE
"=1'
MIOS
CLASSROOM
MEN
WOMEN
UNIT
JAN.
STORAGE
GALLEY &
VENDING
BREAK
AREA
LOBBY
STAIR
STAIR
ELEV
CORR.
EQUIPMENT
PLATFORM
BRIEF/DEBRIEF
#2
BRIEF/DEBRIEF
#1
WORK NOTES:
1 FROST WINDOWS TO SAME OPACITY AS WINDOWS IN RM 114
2 PROVIDE DIAGONAL BRACING ABOVE CEILING. PROVIDE EXPANDED METAL MESH ABOVE
CEILING AT VERTICAL FACE OF STUDS AROUND PIPING AND DUCTWORK. OVERLAP
MINIMUM 6" AND SPOT WELD TO CREATE MAXIMUM 96 SQUARE INCH OPENINGS WITH
MAXIMUM 6" DIMENSION IN EITHER DIRECTION.
3 AFTER SNS INSTALLATION INFILL OPENING WITH WALL TYPE P7. TRIM PATCH AND PAINT
OPENING AND ENTIRE WEST WALL OF ROOM 210 TO MATCH REST OF ROOM. PAINT PATCH
TO MATCH (N) WEST HIGH BAY SIDE OF WALL.
4 INSTALL ACOUSTIC PANEL ON CLASSROOM SIDE OF WEST WALL OF RM 215
DEMO NOTES:
1 REMOVE PORTION OF (E) CASEWORK TO ALLOW INSTALLATION OF NEW WALL
TWO UPPER CABINETS AND ONE LOWER TRIM AND FINISH EDGE OF COUNTER
2 CREATE MINIMUM 84" WIDE BY 84" TALL OPENING INTO M103 210. STRUCTURAL ENGINEER
TO DETERMINE LINTEL/REINFORCEMTN/BOND BEAM. COORDINATE WITH ELECTRICAL FOR
TEMPORARY RELOCATION OF OUTLETS AND NETWORK DROPS.
P7
P1
VERTICAL PLANE, DOWNWARD
DRAWBRIDGE WEIGHTS AT STAIR LANDING:
267 LBS (EACH OF 4 POINTS)
HORIZONTAL PLANE, OUTWARD 800 LBS (EACH OF UPPER 2 POINTS)
HORIZONTAL PLANE, INWARD 800 LBS (EACH OF LOWER 2 POINTS)
VERTICAL PLANE, DOWNWARD
CABLE SUPPORT INTERFACE WEIGHTS
1675 LBS
HORIZONTAL PLANE, OUTWARD 400 LBS
TORQUE MOMENT AT FORCE POINT 620 FT/LBS
DELEGATED DESIGN:
REFERENCE SPECIFICATION SECTION 055000 METAL
FABRICATIONS
A20
A STAIR SECTION
SCALE: 1/2"=1'-0"
A20
B STAIR SECTION
SCALE: 1/2"=1'-0"
DOOR DETAILS 1
DOOR SCHEDULE
FRAME TYPES
DOOR TYPES
WORK NOTES:
1 PROVIDE 12 X 12 FACTORY FABRICATED SECURITY BARS (MAX 96 SQ. IN. OPENINGS AND MAX 6"
OPEN DIMENSION, 3/4" BARS) IN (E) DUCT, COORDINATE WITH ARCHITECTURAL TO BE IN SAME PLANE AS
EXPANDED METAL MESH AT NEW WALL, PROVIDE SQUARE TO ROUND DUCT TRANSITIONS AS
NECESSARY
2 EXISTING CWS/R TAPS INTO HIGH BAY 116 WILL NOT BE USED
3 PROVIDE REMOTE TEMPERATURE SENSOR APPROXIMATELY 15'-0" A.F.F. ROUTE WIRING IN
SURFACE MOUNTED CONDUIT, OFFSET OVER EXISTING CONDUIT
1ST FLOOR HVAC PLAN
SCALE
"=1'
SUPV
MECHANICAL/FIRE
PROTECTION
WST SIM MAINT
PARTS STOR
WST HIGH BAY
INSTRUCTORS
SUITE
WST COMPUTER ROOM
DATA STORAGE/SAFE
COMM
VESTIBULE
MAINT
RECEPTION
LOBBY
SITE MGR
(CONTRACT)
(GOV'T)
PO/QAR
WOMEN
MEN
STOR
PO/QAR
ELEV
CORR.
STAIR
STAIR
SUPV
MECHANICAL/FIRE
PROTECTION
WST HIGH BAY
PARTS STOR
SUITE
INSTRUCTORS
DATA STORAGE/SAFE
WST COMPUTER ROOM
COMM
VESTIBULE
RECEPTION
MAINT
LOBBY
SITE MGR
MEN
(CONTRACT)
WOMEN
ELEV
CORR.
STAIR
STAIR
SUPV
MECHANICAL/FIRE
PROTECTION
WST SIM MAINT
PARTS STOR
WST HIGH BAY
INSTRUCTORS
SUITE
WST COMPUTER ROOM
DATA STORAGE/SAFE
COMM
VESTIBULE
MAINT
RECEPTION
LOBBY
SITE MGR
(CONTRACT)
PO/QAR
(GOV'T)
MEN
WOMEN
OFFICE
SECURITY
ELEV
CORR.
STAIR
STAIR
1ST FLOOR DOMESTIC PLUMBING PLAN
SCALE
"=1'
SUPV
MECHANICAL/FIRE
PROTECTION
WST SIM MAINT
PARTS STOR
WST HIGH BAY
INSTRUCTORS
SUITE
WST COMPUTER ROOM
DATA STORAGE/SAFE
COMM
VESTIBULE
MAINT
RECEPTION
LOBBY
SITE MGR
(CONTRACT)
PO/QAR
(GOV'T)
MEN
WOMEN
OFFICE
SECURITY
ELEV
CORR.
STAIR
STAIR
WORK NOTES:
1 ROUTE CONDENSATE DRAIN FROM COCKPIT A/C UNIT TO CONDENSATE PUMP (CP-1),
ROUTE PUMPED CONDENSATE AGAINST WALL BELOW ELECTRICAL PANELS AND INTO
COMPUTER ROOM BELOW RAISED FLOOR TO AIR GAP AT EXISTING FLOOR SINK
2 ROUTE 2" DRAIN THROUGH WALL DOWN THROUGH ACCESS FLOOR AND BELOW FLOOR
TO AIR GAP AT EXISTING FLOOR SINK
3 ENLARGE TO 3" SS TRANSITION FROM 4" AT FIRST FLOOR AND TO 2" BELOW SECOND
FLOOR (BID OPTION #1)
4 ROUTE
" HW/CW TO NEW MOP SINK ABOVE (BID OPTION #1)
1ST FLOOR SANITARY PLUMBING PLAN
SCALE
"=1'
SHEET
E 100
E 101
E 201
SHEET NAME
LEGEND, TOC, SCHEDULE
FIRST FLOOR LIGHTING PLAN, LIGHT FIXTURE AND LIGHTING DEVICE SCHEDULE
FIRST FLOOR POWER PLAN AND SWITCHBOARD SB1 SCHEDULE
E 202
E 300
E 301
SECOND FLOOR POWER PLAN, SWITCHBOARD SCHEDULE SB2, ELEVATOR EWUIPMENT ROOM AND GROUND BUSS DETAIL
ELECTRICAL EQUIPMENT SCHEDULE
ELECTRICAL ONE LINE AND ELECTRICAL FEEDER SCHEDULE
E 302
E 401
E 500S
GROUNDING ONE LINE & GROUNDING ONELINE FOR SEPARATELY DERIVED SYSTEMS, HP11 PANEL SCHEDULE, BRANCH CIRCUITS LARGER THAN #12
FIRST FLOOR HVAC POWER PLAN AND MECHANICAL EQUIPMENT SCHEDULE
FIRST & SECOND FLOOR SECURITY PLAN, SECURITY DEVICE SCHEDULE & SECURTY LEGEND
EXISTING LIGHTING FIXTURE SCHEDULE
Type Mark Count Manufacturer Model Description
A 15 H.E. Williams DIG-S24-254T5HO-WPR-STEP
DIMMING-277
DIRECT/INDIRECT 2 LAMP RECESSED FIXTURE, DUAL
LEVEL SWITCHING
B 11 H.E. Williams DIG-S24-154T5HO-WPR-EB1-277 DIRECT/INDIRECT 1 LAMP RECESSED FIXTURE
CD 8 PRESCOLITE LFD6LED277HDM-CLFLED7-35K-WHWT
B24
6" RECESSED LED CAN WITH LUTRON SERIES A LED
DRIVER AND 2000 LUMEN LED MODULE
CL 1 PRESCOLITE LFD6LED277-CLFLED5-35K-WHWTB24 6" RECESSED LED CAN WITH 1000 LUMEN OUTPUT
CW 3 PRESCOLITE LFD6LED277WW-6LFLED7-35K-WHWTB2
6" RECESSED LED CAN CONFIGURED TO WALL WASH
WITH LUTRON SERIES A DRIVER
D 16 Finelite Inc. S16WM-SSL-4-T5HO-SC-91W-277-FE-1.0 WALL MOUNTED LINEAR
E 10 DUAL LITE EVCUGWD4I CEILING MOUNTED EXIT SIGN, 277 VOLT
EE 14 DUAL LITE LZ20NI03L EMERGENCY LED WALLPACK, NICKEL CADMIUM
BATTERY, 6 VOLT,
EO 3 DUAL LITE EVO TWO LED OUTDOOR REMOTE EMERGENCY LIGHTING
HEADS
EW 1 DUAL LITE EVCUGWD4I WALL MOUNTED EXIT SIGN, 277 VOLT
F 10 HE WILLIAMS 73-4-154T5H-WG-73141-EB2-277 SINGLE LAMP STRIP FIXTURE WITH WIRE GUARD FE 1 HE WILLIAMS 73-4-1-54T5H-WG-73141-EB2-277-EM SINGLE LAMP STRIP FIXTURE WITH WIRE GUARD AND
BATTERY BACKUP
G 12 HE WILLIAMS 73-4-2-54T5H-WG-73141-EB2-277 DUAL LAMP STRIP FIXTURE WITH WIRE GUARD
H 18 HE WILLIAMS CL-4-354T5H-F-KSH-34RF-AMW-EB3-277
V
3 LAMP WALL MOUNTED CORNER LIGHT WITH CLEAR
ACRYLIC LENS
J 8 FINELITE S10-SSL-8-2T5HO-DC-91W-OPEN-277-A
C-EE-C4-1.0
SUSPENDED LINEAR PENDANT 8' NOMINAL LENGTH
K 3 FINELITE S16-SSL-12-2T5HO-DC-91W-OPEN-277-A
C-EE-C4-1.0
SUSPENDED LINEAR PENDANT 12' NOMINAL LENGTH
L 9 CROSSOVER XCHWM3-LED-WT LED 48
450-NW-UE-BLK
LED EXTERIOR WALL SCONCE
M 1 HUBBELL NVX15GHGA-NVBA WALL MOUNTED VAPOR-TIGHT FIXTURE, TOSHIBA
8A19/27F-UP LED LAMP, 120 VOLT
N 2 CROUSE HINDS 43961-116-GR ROOF MOUNTED, TWO HEAD, AIRCRAFT WARNING
LIGHT
O 2 Kim Lighting CFL1-27L3KUV-BL LED FLOODLIGHT WITH ADJUSTABLE BARN DOOR
LOUVERS (BD-CFL/BL), ON STANCHION MOUNT
(SM18BL), 8" ABOVE GROUND
P 6 KIM Lighting GEM1C-36L3K277-LG-NG-C PERFORMANCE BOLLARD MOUNTED ON CONCRETE
SHAFT. TO BE BURIED 3' 6"
EXISTING LIGHTING DEVICE SCHEDULE
Model Description
4 CONTACT CONTACTOR FOR LIGHTING CIRCUITS WITH ON/OFF/AUTO SWITCH AND REMOTE PHOTOCELL 4 CONTACT CONTACTOR FOR LIGHTING CIRCUITS WITH ON/OFF/AUTO SWITCH AND REMOTE PHOTOCELL
RMJ-16R-DV-B PULL BOX FOR LIGHTING SYSTEM WITH POWPAK RELAY MODULE
LRF2-OCR2B-P-WH CEILING-MOUNT WIRELESS OCCUPACY SENSOR WITH SURFACE OR RECESSED MOUNTING HARDWARE AS REQUIRED FOR LOCATIONS INSTALLED
PULL BOX FOR LIGHTING SYSTEM, TYPICAL, FOR REFERENCE ONLY, MORE BOXES MAY BE REQUIRED
PHOTOCELL FOR USE WITH SITE LIGHTING CIRCUITS
PHOTO CELL FOR AIRCRAFT WARNING LIGHTS
HEAVY DUTY 120/277 VOLT SINGLE POLE SNAP SWITCH WITH FACE PLATE
MRF2-6ANS-277-** WIRELESS SWITCH. WHEN DUAL LEVEL SWITCHING IS USED, ENSURE THAT BOTH SWITCHES ARE CONFIGURED TO RESPOND TO WIRELESS OCCUPANCY SENSOR (OS) IN AREA.
HEAVY DUTY 120/277 VOLT SINGLE POLE SNAP SWITCH WITH FACE PLATE FOR GARBAGE DISPOSER CONTROL, WIRE TO RECEPTACLE
MRF2-6ND-120-WH WIRELESS DIMMER
HEAVY DUTY 120/277 VOLT SINGLE POLE SNAP SWITCH WITH FACE PLATE FOR CONTROL OF EXHAUST FAN
Type Mark Count Manufacturer Model
CON1 1
CON2 1
JRM 2 LUTRON RMJ-16R-DV-B
OS 28 LUTRON LRF2-OCR2B-P-WH
PB 18
PC 1
PCAW 1
S1 17 HUBBELL 1221
S2 34 Lutron Electronics MRF2-6ANS-277-**
S3 1 HUBBELL 1221
S4 2 Lutron Electronics MRF2-6ND-120-WH
S5 1 HUBBELL 1221
Grand total: 107
(N) BL 1 HE WILLIAMS DIG-522-L32/840-WPR-DRV-277 DIRECT/INDIRECT RECESSED LED FIXTURE, 3200
LUMEN, ROUND PERFORATED BAFFLE, 4000K
E 700FA
E 701FA
E 800
FIRST FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN, SCHEDULE, AND LEGEND
SECOND FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN
PANELBOARDS LP11, LP12, AND EL11 SCHEDULES
PANELBOARDS LP13, LP21, AND LP22 SCHEDULESE 801
(N)BL 1 HE WILLIAMS 76-4-L53/840-W6-7614-DRV-277 SINGLE LED LAMP, 5300 LUMEN, 4000K, WIRE GUARD
1ST FLOOR LIGHTING PLAN
SCALE
"=1' lv lv lv
J l v lv lv l v
D D
J J
J
JJ
J
J
J
JJ
J l v l v lvlv lv
J l v l v l v l v lv
S1 (b) S1 (a)
EW
LP13
CW (c)
CW (c)
CW (c)
A (d)
E
J (b)
G
CD
S1
S1 (e)
S1
E
S1
S2
S2
EO
EO
EO
OS
OS OS
OS
OS
OS
OS
OSOS
OS
OS
OS
GG
G G
M
S2 (a)
E-602
F (b)
F (a)
F (a)
F (b)
F (b) F (a)
F (a)
B
D
D
B
B B
B
A
A
A A
A
A
A A
F
D (a)
D (a)
A (d)
CL (e)
S2 S2
S2
H (b)H (a)H (b)
H (a)
H (a)
H (b)
H (a) H (b) H (a) H (b)
H (b)
H (a)
CD (b)
S4 (c) S4 (b)
S2
S2 (a)
A
T2LP11
HP11
SB2 SB1
EH11
T3
EL11
D1H2
METER
LP12
D
EE
EE
EE
EE
EE
EE
EE
CON2
S2 S2
S2 (d)
OS
CD (b)
CD (b)
CD (b)
TO UPPER LEVEL FIXTURES (SEE SECOND
FLOOR LIGHTING PLAN)
JRM
PCAW
PC
D (a)
E
E
EH11 -
J (a)
J (b)
J (a)
J (a)
J (a)
G
D
S2 (b)
S2
H (b)
CON1
S1
UP TO LIGHTS
ABOVE
SWITCH FOR
UPPER LIGHTS
S3
HP11 -
EH11 -
L
S2 (d)
HP11 -
13,15,17,4
S1 (a) S1 (b)
S1 (a) S1 (b)
TO UPPER LEVEL SWITCHES
S1
EL11 -
S2 (a) S2 (b)
EE
OS
OS
OS
CD
CD
S2
RD
(R) l v l v lv lv lv lv lv lv
J
J
J
J
JJ
J lv lv lvlv
J l v l v l v l v l v
JJ
K
KK
A
A
S1
S1
E E
E
E
(R)OS
OS
OS
OS
OS
OS
OS
OS OS
OS
OS
D
B
B
(N)BL
B B
B
F
F
D
D D
D
DD
A
D
A
CD
S2
S2
S2 S2
S2 S2
S2
S2
H (c)
FE
EE
EE
EE
EES2
S2S2
S2
FROM LOWER LEVEL
LIGHTING FIXTURES (SEE
FIRST FLOOR LIGHTING
PLAN)
JRM
L
S1 HP11 -
LP22
S1
E DS2 (c)
H (c)
G G
G
G G
G
EH11 -
LIGHTS SWITCHED FROM
SNAP SWITCH ON 1ST
FLOOR
EE
S5
S2S2
S2 (a) S2 (b)
EH11 -
DOWN TO
SUMP PUMP
2ND FLOOR LIGHTING PLAN
SCALE
"=1'
D1H2
(N)BL
J
WORK NOTES:
1 RELOCATE TYPE H FIXTURE NORTH TO AVOID NEW STAIR. MOVE FAR
ENOUGH TO MAINTAIN MINIMUM 7'-0" FROM RISER BELOW.
COORDINATE WITH FINAL STAIR SHOP DRAWINGS.
2 RELOCATE SWITCH S5 FOR EXHAUST FAN TO (N) JANITOR'S CLOSET.
2ND FLOOR POWER PLAN
SCALE
"=1'
J
J
J
J
J
J
J
LP21
R2
R2
R2
R2
R2R2
R4
R4
R1
R1
R1
R1
SGBB
LOCATE AT WIRING "WATERFALL"
ON TOWER
R7LP22 - 5
R11
R2 R2
R2
R2 R2 R2
R2 R2
R2
R2 R2
R2
R2
R2
R2 R2 R2
R2R2R2R2
R1
R1
R1
R1
R1
R12 R12 R12
R9 R9 R9 R9
LP22 -
6,8
LP22 - 2
R2
LP21 - 2
LP21 - 3
LP21 - 7
LP21 - 6
LP21 - 4
E-602
LP21 - 5
LP22 - 8
LP22 - 7
LP22 -
1,3
LP22 - 9
NOTE: ALL CIRCUITS RUN TO PANEL LP21
SHALL HAVE AN ISOLATED GROUND AS
WELL AS AN EQUIPMENT GROUND
R1
LP21 - 1
R2 D9H3
CC
HP11 -
20,22,24
R15 R15
R15
R15
R15
LP22 -
GPB
GPB
GPB
GPB
GPB
LP22
R5 R5 R5
R5
LP22 -
2,4 LP22 -
LP22 -
LP22 -
Notes:
Spare 64830 VA 100.00% 64830 VA
Receptacle 51010 VA 59.80% 30505 VA
Power 5800 VA 100.00% 5800 VA
Other 25554 VA 100.00% 25554 VA
Motor 76469 VA 111.26% 85078 VA Total Est. Demand: 445 A
Lighting 11232 VA 125.00% 14040 VA Total Conn.: 455 A
Heating 11200 VA 100.00% 11200 VA Total Est. Demand: 369653 VA
HVAC 80679 VA 100.00% 80679 VA Total Conn. Load: 378527 VA
Cooling 63172 VA 100.00% 63172 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 539 A 530 A 525 A
Total Conn. Load: 149151 VA 146636 VA 145553 VA
8 H-1, H-2, H-3 3 60 A 60 A 11400 VA 11400 VA 11400 VA
7 ACC-1 3 200 A 125 A 20633 VA 20633 VA 20633 VA
6 MTS 3 200 A 200 A 30668 VA 31459 VA 30853 VA
5 T2 3 200 A 175 A 48792 VA 43151 VA 43027 VA
4 TVSS 3 60 A 60 A 0 VA 0 VA 0 VA
3 MSEMM 3 100 A 100 A 19214 VA 19214 VA 19214 VA
2 HCB1 3 60 A 40 A 7834 VA 7834 VA 7834 VA
1 HP11 3 200 A 200 A 14054 VA 16344 VA 16016 VA
CKT Circuit Description # of Poles Frame Size Trip Rating
A B C
Remarks
Notes:
Enclosure: NEMA 1 MCB Rating: 1 A
Mounting: PAD Wires: 4 Mains Rating: 800 A
Supply From: SB1 Phases: 3 Mains Type:
Location: Volts: 480/277 Wye A.I.C. Rating: 30000
Switchboard:SB2
WORK NOTES:
1 TEMPORARILY RELOCATE RECEPTACLES IN WEST WALL OF CLASSROOM 210 TO AVOID TEMPORARY OPENING, REINSTALL
WITH WALL PATCH
2 MOUNT GPS ANTENNA (REFERENCE A-302 FOR APPROXIMATE LOCATION) ROUTE CABLE TO INTERIOR, SEAL WALL
PENETRATION
3 INSTALL SURGE PROTECTOR AS CLOSE AS POSSIBLE TO WALL PENETRATION, PROVIDE GROUND IN CONDUIT TO NEW SGBB
BELOW
4 COORDINATE ROUTING OF GPS CABLE WITH EXISTING MECH/ELEC/PLUMB ON WALLS OFFSET AS REQUIRED (REFERENCE
E-301 FOR CONTINUATION)
5 PROVIDE 2" AND 6" CONDUIT STUB THROUGH FLOOR FOR SNS POWER AND COMM
CONTRACTOR INSTALLED GOVERNMENT PROPERTY - GPS ANTENNA:
1. GPS ANTENNA, MOUNTING BRACKET, SURGE PROTECTOR, AND RG58 CABLE ARE GOVERNMENT FURNISHED, CONTRACTOR
INSTALLED
2. CONTRACTOR SHALL PROVIDE AND INSTALL CONDUIT AND ACCESSORIES FROM EXTERIOR WALL PENETRATION TO
VERTICAL DROP 5' A.F.F. IN CENTER OF COMPUTER ROOM, COORDINATE WITH FUTURE CABINET LOCATION
3. CONTRACTOR SHALL PROVIDE TYPE N CABLE CONNECTIONS AT ANTENNA AND SURGE PROTECTOR
4. CONTRACTOR SHALL PROVIDE GROUND AND CONDUIT FORM SURGE PROTECTOR TO NEW SGBB BELOW
5. GOVERNMENT WILL PROVIDE CABLE FINAL CONNECTION AT FUTURE GPS RECEIVER IN COMPUTER ROOM
(E)
UTILITY TRANSFORMER
277/480V, 3PH, 4W
ELECTRIC METER
A
MTS
E
S/P F
C
HCB1
I
T-1 K
T-2
HP11
LP11
M
LP21 LP22
LP12
LP1
P
Q
T
O
(N)MSUPS
R
MSEMM
(N)EMM
N.I.C.
(N)UPS
N.I.C.
CRAC-1
DISC-H1
N
WST COMPUTER ROOM FLOOR
FIRST FLOOR
TVSS
J
TVSS2
Y
MSA
D1
S
V
P1
U W
MSS-1
Z
Z1
X
UPON COMPLETION OF PROJECT THE FOLLOWING MEASUREMENTS SHALL BE MADE OVER A PERIOD OF SEVERAL DAYS (THE RESULTS TO BE SENT TO CAE FOR ANALYSIS) PREFERABLY WHEN THE AREA OF INTEREST AND ANY NEAR-BY AREAS HAVE THEIR FULL COMPLEMENT OF ELECTRICAL EQUIPMENT INSTALLED AND OPERATED:
MAIN INPUT VOLTAGE VARIATIONS, SAGS AND SURGES (ALL PHASES AND NEUTRAL)
FREQUENCY VARIATIONS
TRANSIENTS MAGNITUDE EXCEEDING 1.5 TIMES THE NOMINAL VOLTAGE
TRANSIENTS DURATION EXCEEDING 1/2 POWER CYCLE
NUMBER AND DURATION OF POWER OUTAGES
1" CONDUIT FOR METER WIRING
WST COMPUTER ROOM LOWERED FLOOR
EH11
EL11
SB1 SB2
D1H2
D
T3 HG
L
PDU
Z2
MSPDU
Z3
Z4
ELECTRICAL FEEDER SCHEDULE
FEEDER
DESIGNATION
FOR ONE LINE Panel Circuit Number Load Name Wire Size
Conduit Size When
Larger Than 1/2" Voltage
ASCI At Load Comments
A T-1 1 SB1 3 runs of 3-#300, 1-#300, 1-#1/0 3 - 3" 480 V 28739
C SB2 6 MTS 3-#3/0, 1-#3/0, 1-#6 2" 480 V 24268
D MTS 2 D1H2 3-#3/0, 1-#3/0, 1-#6 2" 480 V LESS THAN 10000
E D1H2 1,3,5 S/P 3-#3/0, 1-#3/0, 1-#6 2" 480 V LESS THAN 10000
F MTS 1 EH11 3-#3/0, 1-#3/0, 1-#6 2" 480 V 22769
G EH11 1,3,5 T3 3-#3, 1-#3, 1-#6 1 1/4" 480 V 20728
H T3 1 EL11 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000
I SB2 2 HCB1 3-#8, 1-#8, 1-#10 1 1/4" 480 V 4561
J SB2 4 TVSS 3-#6, 1-#6, 1-#10 1" 480 V 19482
K SB2 1 HP11 3-#3/0, 1-#3/0, 1-#6 2" 480 V 27172
L SB2 5 T2 3-#2/0, 1-#2/0, 1-#6 2" 480 V 25064
M T2 1 LP11 2 runs of 3-#3/0, 1-#3/0, 1-#3 2 - 2" 208 V LESS THAN 10000
N (R) SB2 3 MSEMM 3-#3, 1-#3, 1-#8 (N) 240 A 1 1/4" 480 V 7373
O LP11 1,3,5 LP12 3-#1/0, 1-#1/0, 1-#6 2" 208 V LESS THAN 10000
P LP11 2,4,6 LP21 3-#1/0, 1-#1/0, 1-#6 2" 208 V LESS THAN 10000
Q LP11 8,10,12 LP22 3-#1/0, 1-#1/0, 1-#6 2" 208 V LESS THAN 10000
R (N) LP11 20,22,24 MSUPS 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000
S LP11 13,15,17 MSA 3-#6, 1-#6, 1-#10 1" 208 V LESS THAN 10000
T LP11 7,9,11 LP13 3-#1/0, 1-#1/0, 1-#6 2" 208 V LESS THAN 10000
U HCB1 1,3,5 CRAC-1 3-#8, 1-#8, 1-#10 1 1/4" 480 V LESS THAN 10000
V (N) MSA 1 D1 HVAC WST HIGH BAY 124 3-#6, 1-#6, 1-#10 1" 208 V LESS THAN 10000 VERIFY WIRE AND CONDUIT WITH PROVIDED A/C
W (N) MSUPS 1,3,5 UPS 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000
X (R) MSEMM 1 EMM 3-#3, 1-#3, 1-#8 1 1/4" 480 V LESS THAN 10000 VERIFY WIRE AND CONDUIT SIZE
Y MSUPS 2,4,6 TVSS2 3-#10, 1-#10, 1-#10 1/2" 208 V LESS THAN 10000
Z (N) UPS 1 MSS-1 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000
Z1 MSS-1 1,3,5 P1 3-#3/0, 1-#3/0, 1-#6 2" 208 V LESS THAN 10000 WIRING FROM BREAKER TO EQUPMENT NOT REQUIRED IN THIS CONTRACT Z2 SB1 1 SB2 3 runs of 3-#300, 1-#300, 1-#1/0 480 V 28739
Z3 LP11 14,16,18 MSPDU 3-#3, 1-#3, 1-#8 1 1/4" 208 V LESS THAN 10000
Z4 MSPDU 1,3,5 PDU 3-#3, 1-#3, 1-#8 1 1/4" 208 V WIRING FROM BREAKER TO EQUPMENT NOT REQUIRED IN THIS CONTRACT
WORK NOTES:
1 (N) UPS TO BE GOVERNMENT PROVIDED AND CONTRACTOR TO
PROVIDE WIRING AND FINAL CONNECTION
2 (N) D1 TO BE GOVERNMENT PROVIDED AND CONTRACTOR TO
PROVIDE WIRING AND FINAL CONNECTION
3 (N) EMM TO BE GOVERNMENT PROVIDED AND CONTRACTOR
VERIFY WIRE AND CONDUIT, SIZE FOR INCREASED LENGTH OF RUN
VERIFY WIRE AND CONDUIT, SIZE FOR 240 A
VERIFY WIRE AND CONDUIT, SIZE FOR 222 A
ELECTRICAL ONE LINE
N.T.S.
(R)
(N)GARAGE
DOOR
(N)GARAGE
DOOR
Z6
Z5
VERIFY WIRE AND CONDUIT, SIZE FOR 240 A
Z5 LP12 FIELD VERIFY GARAGE DOOR 208 V
Z6 208 V VERIFY WIRE AND CONDUIT, SIZE FOR PROVIDED DOORLP12 FIELD VERIFY GARAGE DOOR
VERIFY WIRE AND CONDUIT, SIZE FOR PROVIDED DOOR
Z7 LP12 OR 21
N.I.C.
SNS 200 V VERIFY WIRE AND CONDUIT
STRIKEPLATE
(4) INCARD READER (TYP)
DOOR
SIDE OF
UN-SECURE
FINISHED FLOOR DOOR
SECURE SIDE OF
REQUEST-TO-EXIT SENSOR
3/4" CONDUIT (TYP)
EXIT BUTTON
JUNCTION BOX
JUNCTION BOX
(3) M62 MAGLOCK (TYP)
3/4" CONDUIT (TYP)
(1) 3/4" CONDUIT (TYP)
3/4" CONDUIT (TYP)
FINISHED CEILING
CONDUIT SYSTEM
3/4" EMT CONDUIT TO SECURITY
3/4" CONDUIT
3/4" HOLE
DOORSTOP
MAG LOCK
M62DOOR
HEADER
JUNCTION BOX
SINGLE ENTRY SECURITY DOOR DETAIL
N.T.S
WORK NOTES:
1 COORDINATE EXACT LOCATIONS WITH SECURITY CONTRACTOR, WIRING NOT IN THIS
SCOPE.
| DPEZ182200 8-15-20 COVER |
| DPEZ182200 9-15-20 A-101-A 101 |
| DPEZ182200 9-15-20 A-102-A 102 |
| DPEZ182200 9-15-20 A-401-A 401 |
| DPEZ182200 8-15-20 A-402-A 402 |
| DPEZ182200 9-15-20 M-101-M 101 |
| DPEZ182200 9-15-20 P-101-P-101 |
| DPEZ182200 8-15-20 E-100-E 100 |
| DPEZ182200 8-15-20 E-101-E-101 |
| DPEZ182200 9-15-20 E-202-E-202 |
| DPEZ182200 8-15-20 E-301-E-301 |
| DPEZ182200 8-15-20 E-501S-E-501 |