W50S8U-22-B-0004-0001.pdf

PDF 187 KB Posted

Attached to
Force Protection Repairs Federal contract opportunity
Solicitation number
W50S8U22B0004
Issued by
Department of the Army National Guard

About this file

This document contains an amendment to a solicitation and related federal contract opportunity. The amendment updates the table of contents to include additional attachments, confirms the applicable wage determination, and modifies contract clause 252.236-7001 to include responses to requests for information. The solicitation seeks fixed-price bids for force protection upgrades at an Air National Guard base in Tulsa, Oklahoma, including plant, labor, materials, equipment and supervision. The work is estimated between $100,000 and $250,000. This is a total small business set-aside for NAICS code 236220 with a size standard of $39.5 million. The Department of the Army National Guard agency anticipates funds will be available by 30 September 2022 to award the contract to the responsible bidder offering the most advantageous price.

View the file

Other files for this federal contract opportunity

Other files attached to Force Protection Repairs, newest first.
File Type Posted
Attendance Sheet Bid opening Force Protection_Redacted.pdf PDF
Abstract of Offers OF 1419 - Force Protection.pdf PDF
Pre-Bid RFI Force Protection 25 May 22.pdf PDF
Site Visit Sign In - Force Protection repairs Signed_Redacted.pdf PDF
Site Visit Slides - Force Protection repairs.ppt PPT presentation
Site Visit Minutes - Force Protection repairs.pdf PDF
C-501.pdf PDF
22-B-0004.pdf PDF
Sliding Gate Drawing.pdf PDF
RFI Template Force Protection Repairs.docx DOCX document
SOW - Force Protection v1.4.docx DOCX document
C-315-317_Redacted.pdf PDF
C-101.pdf PDF
A-501.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1.) Update 252.236-7001 to include RFIs w ith their responses.

2.) Update the Table of contents to include additional attachments 3.) Confirm w age determination OK20220053 dated 24 Feb 2022.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-May-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8U22B0004

X 9B. DATED (SEE ITEM 11)

05-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-May-2022

CODE

USPFO OK 138 MISSION SUPPORT CONTRACTING

4200 N 93RD EAST AVE

TULSA OK 74115-1699

W50S8U 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8U22B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

TABLE OF CONTENTS

The Table of Contents has changed from:

Section 00010 – Notes, Solicitation, offer and award SF 1442 Section 00100 - Bidding Schedule/Instructions to Bidders Section 00600 – Representation and Certifications Section 00700 - Contract Clauses Section 00800 - Special Contract Requirements – Wage Determination Section 010000 – General Requirements Attachments

1. A‐501

2. C‐101

3. C‐315‐317_Redacted

4. C‐501

5. Sliding Gate Drawing

6. SOW –Force Protection v1.4

7. RFI Template

NOTES

1. Instructions for the preparation of bids are located in Section 00100.

2. Line items 0002 through 0004 are Option Line Items. See FAR Provision 52.217-5 Evaluation of Options, Section 00100. See FAR Clause 52.217-7 in Section 00700.

to:

Section 00010 – Notes, Solicitation, offer and award SF 1442 Section 00100 - Bidding Schedule/Instructions to Bidders Section 00600 – Representation and Certifications Section 00700 - Contract Clauses Section 00800 - Special Contract Requirements – Wage Determination Section 010000 – General Requirements Attachments

8. A‐501

9. C‐101

10. C‐315‐317_Redacted

11. C‐501

12. Sliding Gate Drawing

13. SOW –Force Protection v1.4

14. Pre‐Bid RFI Force Protection 25 May 22

NOTES

1. Instructions for the preparation of bids are located in Section 00100.

The following have been modified:

TABLE OF CONTENTS

Section 00010 – Notes, Solicitation, offer and award SF 1442 Section 00100 - Bidding Schedule/Instructions to Bidders Section 00600 – Representation and Certifications Section 00700 - Contract Clauses Section 00800 - Special Contract Requirements – Wage Determination Section 010000 – General Requirements Attachments

15. A‐501

16. C‐101

17. C‐315‐317_Redacted

18. C‐501

19. Sliding Gate Drawing

20. SOW –Force Protection v1.4

21. Pre‐Bid RFI Force Protection 25 May 22

NOTES

1. Instructions for the preparation of bids are located in Section 00100.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

A-501 C-101 C-315-317_Redacted C-501 Sliding Gate Drawing Pre-Bid RFI Force Protection 25 May 22

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .