This demolition plan outlines work to be performed at Building 101 in preparation for the Construct Wall Bldg . 150 and 101 solicitation. The plan calls for removing an existing wall to the bottom of the second floor, repairing an existing ceiling, soffit and wall, removing a minimum of 16 feet of hoist rail just below the ceiling, and removing a compressed air outlet and associated piping to a point above the ceiling, capping the unused end.

The related solicitation, number W50S8S23B0001, is for construction work at Building 101 and Building 150 issued by the Department of the Army National Guard. The solicitation seeks offers to construct walls at the two buildings following demolition in accordance with the plan. Responses are due based on the specified solicitation number.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Wall Bldg . 150 and 101, newest first.
File Type Posted
W50S8S23B0001 Construct Walls.pdf PDF
W50S8S23B0001 00001 Conform.pdf PDF
Attendance Site Visit Agenda.pdf PDF
Floor plan - Bldg. 101.pdf PDF
Electrical Demolition Plan - 101.pdf PDF
W50S8S23B0001 0001 Amendment.pdf PDF
PWSWYTD232003.docx DOCX document
Reflected ceiling plan - 101.pdf PDF
Lighting plan - 101.pdf PDF
Electrical Plan - Bldg. 101.pdf PDF
Bldg-150 Partial Floor Plan.pdf PDF
PWS WYTD232003 Const walls 150 Rev 1.docx DOCX document
Existing lighting plan - 150.pdf PDF
W50S8S23B0001 Construct Wall.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1075445152E Text Box Demoliton Plan - 101 No scale

1075445152E Callout Remove existing wall to bottom of 2nd floor above. Repair existing ceiling, soffit and wall.

1075445152E Callout Remove a minimum of 16' +/- of the existing hoist rail which is mounted just below the ceiling and supported by the structure above the ceiling. There is a picture of a typical piece of the rail on the Electrical Demolition Plan.

1075445152E Polygon

1075445152E Callout Remove compressed air outlet, and associated piping to a point above the ceiling. Cap unused end and make air tight.

File details come from the government source that posted it. Updated .