Construct Wall Bldg . 150 and 101 Federal contract opportunity
Solicitation number
W50S8S23B0001
Issued by
Department of the Army National Guard

About this file

This document outlines a federal contract opportunity to construct walls at Building 150 and Building 101 issued by the Department of the Army National Guard. The solicitation number is W50S8S23B0001 for the contract named "Construct Wall Bldg . 150 and 101." The opportunity type is a solicitation. Interested parties should review the attached partial floor plan drawing of Building 150 titled "Bldg-150 Partial Floor Plan.pdf" which provides specifications such as locations for a new 4"x4" box and conduit with pull string. Responses to the solicitation are due by the Department of the Army National Guard to construct walls at the specified buildings by the anticipated award date.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Wall Bldg . 150 and 101, newest first.
File Type Posted
W50S8S23B0001 Construct Walls.pdf PDF
W50S8S23B0001 00001 Conform.pdf PDF
Attendance Site Visit Agenda.pdf PDF
Floor plan - Bldg. 101.pdf PDF
Electrical Demolition Plan - 101.pdf PDF
W50S8S23B0001 0001 Amendment.pdf PDF
PWSWYTD232003.docx DOCX document
Reflected ceiling plan - 101.pdf PDF
Lighting plan - 101.pdf PDF
Electrical Plan - Bldg. 101.pdf PDF
Demolition Plan - 101.pdf PDF
PWS WYTD232003 Const walls 150 Rev 1.docx DOCX document
Existing lighting plan - 150.pdf PDF
W50S8S23B0001 Construct Wall.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

j r I

.,. _ New 4"x4" Box and .

Conduit with Pull String

<ID- New Duplex Receptacle

14'-10"+/-

/ ,, , o" Scale: 1 4 =1 -

I

I

N

I I

I

[J]]

OHF 36 I

ws

REAL [PROPER1Y

� I :1 �

OH; 36 J

ws

0 I � � I

DRAFTING

AutoCAD SHX Text

DRAFTING

AutoCAD SHX Text

REAL

AutoCAD SHX Text

WS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WS

AutoCAD SHX Text

WS

AutoCAD SHX Text

WS

AutoCAD SHX Text

WS

AutoCAD SHX Text

WS

AutoCAD SHX Text

OHF 36

AutoCAD SHX Text

OHF 36

AutoCAD SHX Text

PROPERTY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text 14'-10"+/-

AutoCAD SHX Text 20'-9"+/-

AutoCAD SHX Text Scale: 1/4"=1'-0"

AutoCAD SHX Text 6"

AutoCAD SHX Text New 4"x4" Box and

AutoCAD SHX Text Conduit with Pull String

AutoCAD SHX Text New Duplex Receptacle

1075445152E Typewritten Text Legend

1075445152E Line

1075445152E Typewritten Text Bldg. 150 Partial Floor Plan

1075445152E Typewritten Text Notes:

1075445152E Typewritten Text S - New switch, single pole

1075445152E Line

1075445152E Rectangle

1075445152E Rectangle

1075445152E Rectangle

1075445152E Callout Existing Drywall Partition

1075445152E Callout New insulated drywall partition wall with cove base.

1075445152E Callout New insulated drywall partition wall with cove base.

1075445152E Callout Use 2.5" metal studs between existing drywalled column and corner to maintain access to communications outlet.

1075445152E Typewritten Text

1. Electrical devices are concealed in wall unless otherwise noted (U.N.O).

2. Remove & rework existing ceiling grid to finish on each side of new partition walls. Existing ceiling height is 9' 6" above finished floor.

3. Provide new ceiling tiles inside new office area.

4. Reuse existing ceiling tiles to finish ceiling outside of new office.

5. For partition walls, metal studs shall extend to metal deck above. Provide drywall and insulation to 10' above finished floor.

6. Paint new and existing walls to match existing.

7. Install 4 new government provided LED light fixtures.

8. Use existing system furniture electrical feed located on the column to provide power for new receptacles. Provide blank cover plate on box once existing wires are removed.

9. Refer to PWS for for additional requirements and details.

1075445152E Callout New light fixture (typical).

1075445152E Callout Existing speaker (typ.)

1075445152E Callout New 3070 door, frame and hardware.

1075445152E Callout Relocated supply air diffuser.

1075445152E Callout Existing air diffuser to remain.

1075445152E Callout Relocated return air grille.

Sheets and Views
Model

File details come from the government source that posted it. Updated .