This solicitation is for the construction of walls in Building 150 at the Ohio Air National Guard. The contractor will be required to provide all labor, equipment, materials and supervision to construct a partition wall and modify existing finishes to create an office space.
The solicitation is set aside for small businesses with a NAICS code of 238130 and size standard of $19 million. The project value is less than $25,000. A pre-bid site visit will be held on June 28, 2023 and bids are due by July 27, 2023. The contract will be a firm-fixed-price for a performance period of 60 days from award. The selected contractor must begin work within 10 days of award and provide performance and payment bonds within that timeframe.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S8S23B0001 00001 Conform.pdf | ||
| W50S8S23B0001 Construct Walls.pdf | ||
| Attendance Site Visit Agenda.pdf | ||
| W50S8S23B0001 0001 Amendment.pdf | ||
| PWSWYTD232003.docx | DOCX document | |
| Reflected ceiling plan - 101.pdf | ||
| Floor plan - Bldg. 101.pdf | ||
| Electrical Demolition Plan - 101.pdf | ||
| Lighting plan - 101.pdf | ||
| Electrical Plan - Bldg. 101.pdf | ||
| Demolition Plan - 101.pdf | ||
| Bldg-150 Partial Floor Plan.pdf | ||
| PWS WYTD232003 Const walls 150 Rev 1.docx | DOCX document | |
| Existing lighting plan - 150.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER, 1. SOLKDITATION NO. 2. ]YFEOF SOLflTATON 3. DATE ISSUED PAGE OF PAGES
AND AWARD [~] SEALED RD (IFB) 27-Jun-2023 (Construction, Alteration, or Repair) W50S8S23B0001 H NEGOTIATED (RFP) OF 39
IMPORTANT - The “offer” section on the reverse must be fully completed by offoror.
4. CONTRACT NO. 5. RECZUISrflDNIPURCHASE REQUEST NO. 6. ~OJEST NO.
F9F3CE3114A~Ol
7. ISSUED BY CODE W5OS8S 8. ADDRESS OFF~ TO (If Other Than Item 7) CODE
USPFO OH 180 MISSION SUPPORT CONTRACTING
2660 S EBER RD See Item 7
SWANTON OH 43558-8752
TEL: FAX: TEL: FAX:
9. FOR NFORMRT)DN A. NAME B. TEL~1ONENO. (Include area code) (NO COLLECT CALLS) CALL: SCOTTJ I-tARrzaL 419-868-4314
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
10. ThE GOV~Nr~’H’fr REQURES PERORMRNCE OFTHE WORK DESCRIBED N THESE DOCUMSJTS (Title, identifying no., date):
W~’TD232003 Title: Construct Walls Building 150, this is to construct a drywall partition and rrodify existing finishes creating an office space.
This project is being solicited as a Total Snail Business Set-Aside. The North Arrerican hidustry Classificatlan System (NA~DS) Code is 238130, and the Small Business Size Standard is $19,000,000.00. Construction project magnitude is less than $25,000.00. A pre-bid conference and site visit has been scheduled. See Section 00100— Instructions and Clause 52.236-27 for details. Funds are not presently available for this contract. The Governrrent anticipates funds will becoma available prior to award as this action has been identified on the National Guard priority list. No contract w ill be made until appropriated funds are cede available. Award w ill be made to the responsible bidder whose bid conforrrs to the FR and is ntst advantageous to the Governnent considering only price and price related factors.
11. The Contractor shall begin performance w thin 10 calendar days and conwlete it within 60 calendar days after receiving
~J award, notice to proceed. This performance period is mandatory, E~1_negotiable. (See 12 A. ThE CONTRACTOR MJST WF~ISH ANY REOURED F~FORMANCE AND PAYMENT BONDS? I 2B. CALENDAR DAYS (If “YES,” indicate w’thin how many calendar days after award in Item 12B.)
~ YES [EINO 10
13. ADDITIONAL SOLICITATION REQUIREIvENTS:
A. Sealed offers in original and I copies to performthe work required are due at the place specified in ftem 8 by 1OOOAM (hour) local tine 27 Jul 2023 (date). If this is a sealed bid solicitation, offers n’ijst be publicly opened at that tine. Sealed envelopes containing offers shall be rrarked to show the offeror’s nan’e and address, the solicitation nunter, and the date and tine offers are due.
B. An offer guarantee His, ~ is notrequired.
C. All offers are subject to the (1) work requiren-ents, and (2) other provisions and clauses incorporated in the solicitation in fulltext or by reference.
D. Offers providing less than 120 calendar days for Governrrent acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-1 55-3212 1442.101 STANDARD FORM 1442 (REV. 4-85)
Ftesaibed by GSA FAR (ASCFR) 532~-1(e)
W50S8S23B0001
Page 3 of39
Section 00010- Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
WYTD232003- Construct Walls
FFP
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, to construct a wall and perform interior renovations in accordance with the Performance Work Statement.
FOB: Destination MFR PART NR: Walls
PURCHASE REQUEST NUMBER: F9F3CE3 I 14AWOI
SIGNAL CODE: A
PSC CD: YIAA
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 60 dys. ANP 1 F9F3CE - 180TH CES F9F3CE
2660 SOUTH EBER ROAD
SWANTON OH 43558-8752
FOB: Destination
W5OSSS23B000I
PageS of39
4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
4.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION W5OSSS23B000I Email: I 8O.FW.Contracting(~ius.af.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Address:
Phone Number: _________________________________ Fax Number:___________________________________
Email address:
Bid Inquiry: (Please clearly state your question) (Ifsent via an attachment word does are preferredto facilitate posting ofanswers to the master Q&A document.)
4.1. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.2. All questions and requests for information (RFI) must be received NOT LATER THAN the Fifth working day prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS
EARLY IN THIS PROCESS.
4.3. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that c1arii~’ or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://www.SAM.gov.
4.4. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
4.5. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (SAM.gov) system. Plans and specifications are locked on SAM.gov and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on SAM.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM.gov before accessing the system.
4.5.1. Amendments, if/when issued will be posted to httns://www.SAM.gov for electronic downloading.
This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
5. BID REPOSITORY AND BID OPENING:
Section 00600 - Representations & Certifications
CLAUSES INCORPORATED BY REFERENCE
52.203-2 Certificate Of Independent Price Determination APR 1985 52.203-Il Certification And Disclosure Regarding Payments To SEP 2007
Influence Certain Federal Transactions 52.204-8 Annual Representations and Certifications MAR 2023 52.204-24 Representation Regarding Certain Telecommunications and NOV 2021
Video Surveillance Services or Equipment 52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-13 Violation of Arms Control Treaties or Agreements-- NOV 2021
Certification 52.219-2 Equal Low Bids OCT 1995 52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.222-38 Compliance With Veterans’ Employment Reporting FEB 2016
Requirements 52.223-I Biobased Product Certification MAY 2012 52.223-4 Recovered Material Certification MAY 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain JUN 2020
Activities or Transactions Relating to Inn-- Representation and Certifications.
252.203-7005 Representation Relating to Compensation of Former DoD SEP 2022 Officials
252.204-7008 Compliance With Safeguarding Covered Defense Information OCT2016 Controls
252.204-7016 Covered Defense Telecommunications Equipment or ServicesDEC 2019 -- Representation
252.204-7017 Prohibition on the Acquisition of Covered Defense MAY 2021 Telecommunications Equipment or Services -- Representation
252.232-7016 Notice of Progress Payments or Performance-Based PaymentsAPR 2020
Page 7 of39
52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016
52.2 14-6 Explanation To Prospective Bidders APR 1984
52.2 14-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984
52.2 14-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits JUL 2005
(PRB) Other than Pensions 52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data NOV 2021
Other Than Certified Cost or Pricing Data -- Modifications
52.2 19-6 Notice Of Total Small Business Set-Aside NOV 2020
52.2 19-8 Utilization of Small Business Concerns OCT 2022
52.2 19-28 Post-Award Small Business Program Rerepresentation MAR 2023 52.222-I Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52 .222-4 Contract Work Hours and Safety Standards - Overtime MAY2018
Compensation 52.222-5 Construction Wage Rate Requirements--Secondary Site oftheMAY 2014
Work 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-Il Subcontracts (Labor Standards) MAY2014 52.222-12 Contract Termination-Debarment MAY2014 52.222-13 Compliance With Construction Wage Rate Requirements and MAY 2014
Related Regulations 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-IS Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for APR 2015
Construction 52.222-3 5 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Underthe National Labor DEC 2010
Relations Act 52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.222-55 Minimum Wages for Contractor Workers Under Executive JAN 2022
Order 14026 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-2 Affirmative Procurement of Biobased Products Under ServiceSEP 2013 and Construction Contracts 52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-7 Notice Of Radioactive Materials JAN 1997 52.223-10 Waste Reduction Program MAY 2011
Page 9 of39
52.242-5 Payments to Small Business Subcontractors JAN2017 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Products and Commercial MAR 2023
Services 52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of AUG 1996
Improvements 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2020 52.249-I Termination For Convenience Of The Government (Fixed APR 1984
Price) (Short Form) 52.249-2 Termination For Convenience Of The Government (Fixed- APR2012
Price) 52.249-3 Termination for Convenience of the Government APR2012
(Dismantling, Demolition, or Removal of Improvements) 52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer’s Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD SEP 2011
Officials 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- JAN 2023
Contract-Related Felonies 252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7004 Display of Hotline Posters JAN 2023 252.203-7005 Representation Relating to Compensation of Former DoD SEP 2022
Officials 252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7007 Alternate A, Ammual Representations and Certifications MAY 2021 252.204-7008 Compliance With Safeguarding Covered Defense Information OCT2016
Controls 252.204-7012 Safeguarding Covered Defense Information and Cyber JAN 2023
Incident Reporting 252.204-7015 Notice of Authorized Disclosure of Information for Litigation JAN 2023
Support 252.204-7016 Covered Defense Telecommunications Equipment or ServicesDEC 2019
-- Representation 252.204-7017 Prohibition on the Acquisition of Covered Defense MAY 2021
Telecommunications Equipment or Services -- Representation 252.204-7018 Prohibition on the Acquisition of Covered Defense JAN 2023
Telecommunications Equipment or Services 252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.204-7020 NIST SP 800-171 DoD Assessment Requirements JAN 2023 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.206-7000 Domestic Source Restriction DEC 2022 252.209-7004 Subcontracting With Firms That Are Owned or Controlled ByMAY 2019
The Government of a Country that is a State Sponsor of Terrorism
252.215-7005 Evaluation Factor for Employing or Subcontracting With OCT 2008 Members of the Selected Reserve
252.215-7008 Only One Offer DEC 2022
Page II of39
W50S8S2380001
Page 13 of39
52.216-1 TYPE OF CONTRACT (APR 1984)
The Govermnent contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.100;
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, th the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(I) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (I) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
W50S8S23B000 1
Page 15 of39 steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in pet-forming this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(I) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(l) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1,2030.
(B) For domestic construction material that is a critical item or contains critical components.
(I) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(l) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(Hi) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)0) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
(End of clause)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
ATTN: NGB Protest Decision Authority Ill S. George Mason Drive Arlington, VA 22204-1373 Fax: (703) 607-3684 or 3682
OR Protest to the Contracting Officer shall be filed at:
USPFO FOR OHIO P&C OFFICE
ATTN: Contracting Officer — Bradley WahI 2811 W. Dublin-Granville Rd Columbus, OH 4323 5-2788
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
A pre-bid conference will be conducted on June 28, 2023 at 10:00 AM EST for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at Ohio Air National Guard, 2660 5. Eber Rd., Swanton Ohio 43558, Bldg 150, CE Training Room. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.
Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Barry Beale, Scott Hartzell and Darrell Maxwell at the following addresses:
I 80.FW.Contractingøius.af.mil
(End of provision)
Page 19 of39
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general-
(I) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to cany out the intcnt of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title Bldg. 150 Partial Floor Plan Existing Lighting Plan - 150
(End of clause)
WDOL
“General Decision Number: 01-120230088 04/14/2023
Superseded General Decision Number: 0H20220088
State: Ohio
Construction Type: Building
County: Lucas County in Ohio.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1 (a)(2)-(60).
If the contract is entered Executive Order 14026 I into on or after January 30, I generally applies to the I 12022, or the contract is contract. I Irenewed or extended (e.g., an I• The contractor must pay I ~option is exercised) on or I all covered workers at lafter January 30,2022: I least $1 6.20 per hour (or
CARPENTER (Drywall Hanging and Metal Stud Installation Only) $28.22 17.77
CARPO35I-002 05/01/2016
Rates Fringes
CARPENTER (Excluding Drywall Hanging and Metal Stud Installation) $28.63 19.51
ELEC0008-015 05/23/2022
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring) $44.79 4.5%+2l.60
* ELEC0008-016 08/23/202 1
Rates Fringes
ELECTRICIAN: CABLE PULLER
(Voice/Data/Video) $ 11.67 ** 4•5%
ELEC0008-017 08/23/2021
Rates Fringes
ELECTRICIAN (Low Voltage Wiring Only) $27.81 4.5%+16.23
ENGIOOI8-048 05/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
Backhoe/Excavator/Trackhoe;
Crane $36.64 15.09
EN010066-045 06/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR
Forklift $28.87 19.66 Grader/Blade $ 32.42 19.66 Mechanic $32.92 19.66
1R0N0044-020 06/01/2021
Rates Fringes
W5058S23B0001
Page 21 of39
PIPEFITI’ER (Includes HVAC Pipe Installation) $44.60 28.51 PLUMBER (Excludes 1-1VAC Pipe Installation) $44.60 28.51
R00F0134-006 07/01/2019
Rates Fringes
ROOFER $28.02 20.04
SF0H0669-009 04/01/2021
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers) $39.25 25.81
SHEEOO33-048 07/04/2022
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation) $ 36.62 32.36
* UAVG-OH-0021 01/01/2019
Rates Fringes
OPERATOR: Oiler $27.56 16.37
SUOH2O 12-090 08/29/2014
Rates Fringes
IRONWORKER, REINFORCING $28.11 17.83
LABORER: Mason Tender- Brick...$ 18.39 11.04
LABORER: Pipelayer $23.98 8.58
OPERATOR: Bobcat/Skid Steer/Skid Loader $ 30.26 12.58
OPERATOR: Bulldozer $28.07 11.15
OPERATOR: Loader $29.66 12.61
OPERATOR: Paver (Asphalt, Aggregate, and Concrete) $30.28 13.29
OPERATOR: Roller $28.83 12.72
TRUCK DRIVER: Dump (All Types)...$ 24.32 11.73
W5058523B0001
Page 23 of39
PLUMOI98-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/20 14 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ““SU”” identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2OI2-007 5/13/20 14. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/20 14 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/20 14. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CEA rate of the union locals from which the rate is based.
END OF GENERAL DECISIO
Page 27 of39
W5058S23B0001
Page 29 of39 intention to work during other periods to allow assignment of additional inspection forces. When the COR detennines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of theft normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.
3.2. The following Federal legal Holidays are observed by this base:
New Year’s Day 1 January Martin Luther King’s Birthday Third Monday of January President’s Day Third Monday of February Memorial Day Last Monday of May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
3.3. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday; holidays falling on a Sunday will be observed on the following Monday.
3.4. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the contractor must notify the Contracting Officer (or the Contracting Officer’s Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer’s Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings.
3.5. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.
4. INVOICING AND PAYMENT
4.1. Properly prepared invoices, bearing the contract number, shall be submitted in duplicate to the Contracting Office, USPFO OH 180 MISSION SUPPORT CONTRACTING, 2660 5. Eber Rd., Swanton OH 43558, on designated invoice forms provided at the pre-construction meeting PRIOR to uploading in Wide Area Workflow (WAWF) the DFAS paying system. This submission will be for review prior to submitting an electronic invoice through Wide Area Workflow (WAWF). See end of this Section for important information and codes needed.). Payment will be made by in accordance with FAR clause 52.232-5 Fixed-Price Construction Contracts and FAR clause 52.232-27, Prompt Payment for Construction Contracts, all payments will be made by electronic transfer of fnnds (EFT).
4.2. To meet compliance with DFARS 252.232-7003, Electronic Submission of Payment Requests, you shall submit your request for payment (invoice) through WAWF. For more information on the WAWF system, including how to register, visit https://wawf.eb.mil. Payment will be made by paying office specified in the contract award in accordance with the clauses Payments under Fixed-Price Construction Contracts, FAR 52.232-5, and Prompt Payment for Construction Contracts, FAR 52.232-27.
4.3. The Government will make payment through WAWF upon satisfactory completion of work AND receipt of a proper certification for payment. Do not input invoice into WAWF until the pre-approval of invoice is
Page 31 of39
All communications with DOD organizations are subject to communications security (COMSEC) review. Contractor personnel must be aware that telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian contractor personnel are advised that any time they place a call to, or receive a call from, a DOD organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.
8. UTILITY SERVICES
The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14). The following utilities will be available: water and electricity.
9. PREPARATION OF MATERIAL APPROVAL SUBMITTALS
The contractor shall submit all materials and articles requiring approval, as required by the Material and Workmanship Clause, FAR 52.236-5. Submittals shall be made using AF Form 3000 or approved equal. Submittals shall be processed in accordance with the procedures in Section 01 33 00, Submittals. Submittals shall be given a distinct identification system by CLIN if multiple CLINS are applicable. Individual submittal documents shall not be comprised of items for more than one CLIN. Address for delivery of submittals will be provided at the post award/pre-construction conference. The contractor is reminded that an individual within the company who has authority to make the certification must sign the certification on the AF Form 3000.
10. WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS
10.1. A weekly meeting may be held with the Contractor, COR and Contracting Officer (KO), if necessary, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. Prior to beginning work on specific work elements of a project, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premises and buildings;
space for storage of materials and equipment; delivery of materials; and use of approaches, use of corridors, stairways and similar means of passage.
10.1.1. In accordance with FAR Clause 52.236-15, “Schedules for Construction Contracts”, the contractor shall within five days after work commences on the contract, or another period of time determined by the KO, prepare and submit to the KO for approval three copies of a practicable schedule showing the order in which the contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing features of work. A composite schedule for the overall contract shall also be provided. The schedule shall be on an AF Form 3064, Contract Progress Schedule, or an approved computer generated format similar to the AF Form 3064. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. Both the Contractor and the COR are required to provide monthly progress reports covering the period from notice to proceed through final inspection. Unless agreement cannot be made on the applicable percentage of progress a joint report will be submitted to the Contracting Officer. This report shall be submitted on the NGB Contract Progress Report form (similar to an AF Form 3065), or an approved computer generated similar format. These reports shall track progress by CLIN, if contract contains multiple CLINs, multiple AF Form 3064 and NG Contract Progress Reports will also be required for payment purposes.
10.2. The Contractor shall prepare a work progress schedule required for completion of each of the various divisions of work. Updated plans and Form 3064 showing work progress (hardcopy and formatted diskette or CD, or e-mail file copy), unless otherwise directed by the Contracting Officer, shall be provided biweekly. If there are possible deviations from the original plan, those must be noted and approved by the Contracting Officer before work changes are implemented. The schedule shall be submitted to the Contracting Officer, in the number of copies as
14.2. Security of material storage areas on the job site shall be the responsibility of the contractor. The area shall be kept neat and orderly and free of debris.
IS. RECORD DRAWINGS
During construction of a project and on the job site, the contractor shall maintain a completed record of all changes and corrections from the layout shown on the drawings, if applicable. The contractor shall enter such changes and corrections on contract or record drawings promptly and submit the “red line” drawings to the Contracting Officer upon completion of the project. The record drawings shall indicate all changes and corrections concerning the actual locations of all sub-surface utility lines. In order for the location of these lines and appurtenances to be determined in the event the surface opening or indictors become covered or obscured, the record drawings shall show, by offset dimensions to two permanently fixed surface features, the end of each run including each change in direction.
Valves splice boxes, and similar appurtenances shall be located by dimensioning along the utility run from a reference point. The average depth below the surface of each run shall also be recorded. The Government does not guarantee the accuracy of existing record drawings; it is the contractor’s responsibility to verify all as-built conditions.
16. VERIFICATION OF DIMENSIONS
The contractor shall be responsible for the coordination and proper relation of all aspects of the work. He/she shall field verify all dimensions and advise the Contracting Officer of any discrepancies pnor to proceeding with any phase of the work. Where exact locations are not given for the positioning of equipment and devices, they shall be positioned to permit easy access for maintenance and for removal and replacement of component parts.
17. SECURITY REQUIREMENTS
17.1. The contractor shall comply with all security regulations imposed by the base commander and/or agency occupying the space where work is to be performed. Any necessary security clearances shall be obtained prior to commencement of work.
17.2. It is expected that new security requirements to satisfy contractor personal identification requirements in Homeland Security Presidential Directive (HSPD-l2), “Policy for a Common Identification Standard for Federal Employees and Contractors,’ and Federal Information Processing Standards Publication (FIPS PUB) Number 201, ‘Personal Identity Verification (PIV) of Federal Employees and Contractors” are incorporated in the life of this contract. Contractor shall comply with all requirements, at no additional cost to the Govermnent.
17.3. The contractor shall ensure that all parts of the facility where work is being performed are adequately protected against vandalism and theft.
17.4. ‘Contractors shall follow instructions provided by the Security Forces for access to the 180” FW, Security Forces Bldg 120. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer. Be sure that all of your employees have the proper ID (drivers license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away.
17.5. The Prime Contractor and all of its subcontractors will be required to wear orange or lime colored safety vests while performing work on the installation.
17.6. U.S. Government will not be held liable for any delays or breach of contract caused by refusal of the Security Forces to allow entry.
17.7. All prospective contractors MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S., and are authorized by the US government to work in the United States (i.e. Green card, worker authorization, etc.). All prospective contractors MUST have at least one form of U.S. government issued photo
W5OSSS23B000I
Page 35 of39
20. CLEANUP AND DISPOSAL OF DEBRIS AND FILL MATERIALS
20.1. At the end of each workday, the contractor shall clean up the work and storage areas and stack all materials in a manner approved by the Contracting Officer or his designated representative. Upon completion of a project, the contractor shall ensure that all dirt, trash, and debris resulting from the construction operations are removed from the work area. Unless directed otherwise in the contract or by the Contracting Officer, disposal of debris shall be made at the contractor’s expense and shall be delivered to a state approved disposal site located off base. Debris shall not be left in such a manner that wind or other weather conditions can cause the debris to be scattered outside the work area (i.e., on nearby runways, ramps or taxiways).
20.2. The hauling and disposal of excess fill material including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be the responsibility of the contractor. Disposal shall be in accordance with applicable state and local regulations.
21. ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law. Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
22. HAZARDOUS MATERIALS
22.1. Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.
22.2. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos-containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating. Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities.
29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
23. POLLUTION ABATEMENT
23.1. All work shall be performed in a manner minimizing pollution of air, water and land as required.
23.2. Transporting materials to or from the site shall be accomplished in a manner preventing materials or particles from becoming airborne. Earth materials shall be wetted or otherwise protected. Gravel, sand and concrete shall be contained within vehicles to prevent spillage. Tarpaulins must be fastened overload before entering surrounding streets. Removal of any materials dropped or blown off vehicles shall be the responsibility of the contractor.
23.3. Burning of any material is strictly prohibited.
Page 37 of39 construction, and operations that comply with contract requirements. The system shall cover construction operations, including fabrication both on-site and off-site, and shall be keyed to the proposed construction sequence.
If the contractor fails to submit an acceptable quality control plan within the time herein prescribed, the Contracting Officer may refuse to allow construction to start if an acceptable interim plan is not furnished or may withhold funds from progress payments in accordance with the contract clause titled, “Payments under Fixed Price Construction Contracts”, until such time as the contractor submits an acceptable final plan.
27.2. Quality Control Plan
27.2.1. General. Upon receipt of the Notice of Contract Award, the contractor’s quality control CQC plan (2 copies) shall be submitted for acceptance in accordance with 3.3 Coordination meeting of specifications “Submit the CQC Plan a minimum of 3 calendar days prior to the Coordination Meeting.
27.2.2. Acceptance. The Contracting Officer’s Representative will review the quality control plan.
The contractor shall make such changes and additions as necessary for clarity and completeness as requested by the Contracting Officer’s Representative through the Contracting Officer. Acceptance of the contractor’s plan is predicated on satisfactory performance during construction. Acceptance is conditional and the Government reserves the right to require the contractor to make changes in quality control plans, personnel and operations to correct deficiencies and to assure contract compliance.
27.2.3. Changes. When the contractor proposes changes in the quality control plan or implementation during construction, the Contracting Officer shall be notified in writing. The contractor shall implement no changes prior to acceptance in writing by the Contracting Officer.
28. SAFETY ASSURANCE
28.1. Compliance with Regulations. All work including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926. Work involving the disturbance or dismantling of asbestos or asbestos-containing materials; the demolition of structures containing asbestos; and/or disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subpart A. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply. The Safety Manual is available at the following web site:
http://www.usace.army.mil/SafetyandOccupationalHealthjSafetvandFlealthReguirementsManual.aspx
28.2. Contractor Responsibility. The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. The Government shall not be held liable for any actions on the part of the contractor, his employees or subcontractors, which result in illness, injury or death.
28.2.1. Inspections, Tests and Reports. The required inspections, tests and reports made by the contractor, subcontractors, specially trained technicians, equipment manufacturers and others as required, shall be at the contractor’s expense.
28.2.2. Materials and Equipment. Special facilities, devices, equipment, clothing and similar items used by the contractor in the execution of work shall comply with applicable regulations.
28.2.3. Traffic Control Devices. The contractor shall comply with the recommendations contained in Part 6 of the U. S. Department of Transportation, Federal Highway Administration’s “Manual on Uniform Traffic Control Devices”, 2003 edition with Revision 2 available at http://mutcd.fhwa.dot.govflto ensure proper warnings to motorists and adequate traffic control. The contractor shall provide all warning lights, barricades and other traffic control devices and signs.
29. PRE-CONSTRUCTION CONFERENCE
Page 39 of39 exceeds the number of days anticipated, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather workdays, and issue a bilateral modification.