SOW 24 March 2026.pdf
PDF 367 KB Posted
- Attached to
- Data Wall Installation
- Solicitation number
- W50S8R25Q0005
About this file
This is a Statement of Work (SOW) for the Mansfield Air National Guard's 179th Cyber Operations Group, detailing the installation of a new integrated video/data wall system within building 409 at the 179th Wing in Mansfield, Ohio. The contract period of performance is 210 days, with work to be performed Tuesday through Friday between 0830 and 1630, excluding recognized U.S. federal holidays.
The contractor must provide and install seven total video wall systems consisting of six primary displays along the operations floor's north wall (98 feet wide by 4 feet 1 inch high) and one separate system integrating two government-furnished 75-inch displays plus a camera for conference room 105. The operations floor displays must support quadrant functionality displaying four distinct simultaneous images, meet 4K resolution standards, and achieve 24-point Times New Roman font legibility from 170 inches. The solution requires a closed-loop AV over IP fiber infrastructure connecting 29 operator stations across seven pods and three controller stations, with audio distribution restricted to 10-foot radii from pod centers. The conference room installation includes two lecterns with GFE workstation capacity, a 50-65 inch lectern monitor, a 10-inch tabletop control panel, two wall-mounted HD cameras, ceiling-mounted audio systems, and all necessary digital media switchers and fiber transmission equipment. Equipment selection is restricted to the AF JWICS Approved Product List, with exceptions for displays, racks, furniture, and audio components; all equipment must lack wireless or Bluetooth capability and require 90-120 day approval from the 16th AF Approving Official and NGB CISO office before procurement. The contractor must provide system manuals, architecture design drawings, personnel training, operational testing with government representatives, site cleanup, damage repair/restoration, and replacement of any government equipment damaged during installation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mansfield Air National Guard
Statement of Work (SOW)
New Data Wall Installation
24 March 2026
1.0 Scope:
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to provide and install an integrated new video/data wall within building 409 Relocatable Facility (RLF) located on 179th CW Mansfield Ohio Air National Guard, 1947 Harrington Memorial Road, Mansfield OH 44903, as defined in this SOW.
1.1 Background:
The 179th Cyber Operations Group (COG) requires the installation of a new video/data wall. This capability will allow for more effective command and control awareness, mission briefings, training sessions, presentations, and current/future operational taskings.
1.2 Objective:
The 179th Cyber Operations Group (COG) requires a qualified contractor to provide and install six (6) video wall systems, 2 displays for OPS controller desks, and integrate 2 GFE displays and camera for Rm 105 conference room video wall. The primary function of these systems is to enable operators to view multiple, simultaneous sources of information in a clear and efficient manner. The comprehensive installation must adhere to the specific technical and physical requirements detailed in this document.
1.3 Period of Performance (PoP): 210 Days
1.4 General Information
1.4.1 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:
New Year’s Day: January 1st Martin Luther King, Jr.’s Birthday President’s Day Memorial Day Independence Day: July 4th Labor Day Columbus Day Veteran’s Day: November 11th Thanksgiving Day Christmas Day
1.4.2 Place and Performance of Services: The contractor shall provide services between the hours of 0830-4:30 on Tuesday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
Performance shall be at building 409 RLF 179th CW Mansfield Ohio Air National Guard, 1947 Harrington Memorial Road, Mansfield OH 44903. The contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5 Base Access
1.5.1 The contractor shall verify that identification credentials presented by all contractors and subcontractor employees to obtain security badges, passes, cards, or decals used during the duration of this contract are current and correct.
1.5.2 The contractor’s employees shall become familiar with and obey the regulations of the installation including fire, traffic, safety and security regulations while on the installation.
Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.5.3 Contractors who require access onto the installation for 30 days or more may be issued a contractor pass. For Contractors requiring less than 30 days access onto the installation may be issued a Defense Biometric Identification System (DBIDS) generated AF Form 75, Visitors Pass. The Defense Forces Commander (DFC) maintains the right to deny contractors access to the installation based on unfavorable information obtained through NCIC or DBIDS. 1.13.4. Contractors working on the installation need to complete an Antiterrorism Level I training. The training can be found at https://jko.jten.mil/courses/AT-level1/launch.html. Please ensure contractors are attaching their certificates along with their applications. Contractors who have not completed an Antiterrorism Level I training will not be allowed on the installation.
1.5.4 A background check is required and access to the TS/SCI facility is restricted to US citizens only no foreigners or dual citizenship shall be allowed. The contractors will not be allowed to utilize any electronics of any fashion to include medical devices within the TS/SCI facility unless prior authorization has been granted. To request prior authorization a two-week lead time is required and the submission can be sent to the following email address 179og.infosec.sso-isso-sysadm@us.af.mil.
https://jko.jten.mil/courses/AT-level1/launch.html
1.5.5 Contractors shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.5.6 All contractor and subcontractor personnel shall present REAL ID-compliant identification for establishing identity for unescorted access. Individuals who do not possess a REAL ID Act compliant form of identification shall be denied access to the installation. However, individuals with non REAL ID-compliant identification may also present an original or certified true copy of a birth certificate and their social security card.
1.5.7 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations.
Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
2.0 Technical Specifications:
The solution shall be composed of seven total video wall systems, hereafter referred to as "video displays," and must meet the following criteria:
2.1 Physical Infrastructure:
o The primary OPS floor video wall will consist of six (6) individual video displays mounted, or standalone, along a single “north” wall.
o The maximum dimensions for the total useable video display area are 98 feet in width and 4 feet 1 inches. Please use ref fig 4.1 for more details.
o The total wall height is 8 feet 4 inches.
o There are seven (7) rows of desks on the OPS floor, referred to as "pods".
o There are two (2) desks along the “north” wall of the OPS floor, referred to as “controller desks”.
o There will be a separate video wall integrating two GFE Displays and one camera for the conference room #105.
2.2 Display and Readability:
o Each of the six video wall displays must be capable of displaying four distinct images simultaneously.
• This can be achieved either through four separate, integrated screens per pod or a single large screen with picture-in-picture (quadrant) functionality.
o All content displayed on video walls or displays must meet a minimum readability standard.
• The requested standard is that 24-point Times New Roman font must be clearly legible from a distance of 170 inches.
• 4K Resolution o All video wall or displays will need to be 1 inch removed from the drop ceiling and restricted to 50 inches from the floor (in only 1 case would the restriction be higher and that’s 53 inches).
o Displays will be required to either be stand-alone without load bearing support from the wall or capable of being mounted on the “false/interior” wall with stud spacing of 16in apart on the operations floor. If the choosing to mount the OPS controller displays, the “South” wall requires a 1-inch Marine grade plywood, 4 feet by 8 feet, to mount the displays and these need to be secured using the studs in the wall. Any planned perforation of the false wall for the A/V solution will require the contractor to provide documentation indicating where the perforation of the false wall will occur and submission of the documentation shall be 30-60 days prior to commencement of A/V solution install. The government reserves the right to deny perforation of the false wall if documentation and request is not received within the allotted window, and no perforation of the wall will occur unless prior approval has been granted from the contracting officer.
2.3 Connectivity and Control:
o The video wall system shall be a closed-loop AV over IP fiber solution.
o Each of the first 6 pods on the OPS floor will consist of at least four operator stations with the 7th pod containing two operator stations.
• Each operator station will be connected to a Government Furnished Equipment (GFE) KVM switch.
• Single output of the GFE KVM switch will be a source for input into the video display.
• Total count of input sources from each pod will be four (4) separate HDMI sources onto each pod’s specific video display.
• When a single source is displayed in a large format across a video wall, that source may originate from any of the available inputs within that pod's operator stations.
• There will be no need for additional input sources outside of the 29 operator stations. The total breakdown is as follows: total of 6 pods with 4 operator stations equaling to 24 operator stations, 3 controller stations on 2 controller desks, and 1 not aligned pod with 2 operator stations. Total numbers is 29 stations with desktop computers.
o The two (2) controller desks, located on the “north” OPS floor wall, with a total of two
(2) workstations per desk, will house a total of three (3) control stations, with two (2) on one desk, and one (1) on the other. Please use ref fig 4.2 for more details.
• These control stations must have the ability to project content to any or all display quadrants across all six OPS floor video displays.
• The Conference room video display, located in room 105, will have two control stations as input source and shall integrate GFE displays and camera.
2.4 Operations Floor
All layouts will be selectable by two control touch panel systems.
Contractor shall provide an AV System as described in paragraph 2.1, 2.2 and 2.3.
Add 2 flat panel w/ Power Distribution Unit (PDU) wall mount systems for GFE LCD 75in 4K/UHD displays Integrate GFE 2 LCD, 75in 4K/UHD displays to AV system w/ flat panel systems Add card chassis capable of holding a minimum of 8 encoders/decoders w/ 4K60 HDR
SCALING NETWORK AV
Integrate all A/V equipment into GFE equipment rack. Rack space will house the encoders/decoders and all required systems Add Bi-Amplification (BIAMP) system Add compliant rack mounted ups.
Add compliant single mode fiber compatible switch w/ SMF transceivers for network transport of A/V Add 18G High Speed HDMI w/ variable lengths Add Digital Media switcher w/ 8G 4K60 HDR scaling input fiber cards and multi-channel 8G 4K60 HDR scaling output fiber cards Add Transmitter 4K Digital Media 8G 4K60 HDR Add speaker systems on operators’ desk Integrate speaker systems to A/V system
2.5 Conference Room:
Add 2 Lecterns w/ rack shelf kit Add standalone codec EQ no-radio and table stand Room Navigator
Add wall mounted Lectern Monitor and integrate with A/V switcher Add 10.1in tabletop control panel Add two wall-mounted HD Camera w/ HDMI connection Add BIAMP system Add 18G High Speed HDMI w/ variable lengths Add amplification for audio Add voice-lift from Microphone (drop-down or otherwise) and speaker w/ 24" suspended grid acoustical ceiling tile that’s white and square. Audio pickup centered on conference table. Mic and speaker functionality controlled by touch panel.
Add Digital Media switcher w/ 8G 4K60 HDR scaling input fiber cards and multi-channel 8G 4K60 HDR scaling output fiber cards Add Transmitter 4K Digital Media 8G 4K60 HDR
All Equipment will be housed in the GFE equipment racks in frame room. Rack space will be dedicated to AV equipment for this installation.
2.6 All equipment purchases for this project will be restricted to the Approved Product List (APL) released by AF JWICS as the primary source. Should equipment required not reflect on primary source; then, any other Department of Defense APL/EPL provided by the government such as DISA APL can be used as a suitable sub. Contractors shall provide the documentation for the chosen equipment which cannot be expired or missing. When selecting equipment, such as switches, the hardware or software needs to be the same make and model as stated in the APL or alternative APL provided by the government.
2.6.1 The exception to this policy applies to products are displays (monitors, tv’s, LED, LCD), racks, furniture, speakers, amplifiers, encoders/decoders, and video processing hardware.
2.6.2 When selecting equipment not applicable to the APL such as displays and/or amplifiers, the contractors shall ensure the equipment does not have the capability for Wireless (WiFi) or Bluetooth.
2.6.3 Contractors proposed solution shall provide no microphone capabilities.
2.6.4 Immediately following contract award, the government will request approval for the equipment quoted for this project from the 16th AF Approving Official and NGB CISO office. Current lead time for approval is typically 90-120 days. Contractor shall not order/purchase equipment under this contract without written approval from the Contracting Officer. The Government shall not be liable for costs associated with the contractor purchasing/ordering equipment prior to receiving equipment approval from 16th AF Approving Official and NGB CISO office.
2.7 The contractor will not have to provide conduit paths under the operations floor or the conference room as both rooms have cable runways running through them with enough space to run additional fiber lines. Additionally, the max distance from server room to the end of the operation floor for fiber cabling infrastructure when accounting the cable runways is approximately 250 ft..
2.8 If required, all power cords and data lines shall exit ceilings or wall-mounted at a point as close to the equipment as possible. If required, all power and data lines shall be mounted on walls in boxes with color-coded faceplates that match the type originally installed at the facility.
2.9 Furnish and install operator station speaker systems capable of distributing audio or furnish and install in-ceiling white suspended grid acoustical ceiling tile for speaker system capable of distributing audio but restrict audio to a radius of 10’ from center of pod. Audio on the operations floor shall be integrated with A/V switcher and controlled at the controller stations.
Additionally, the controller should be able to push the same audio to all speakers or in-ceiling speakers should the need arise. Normal use will only require the audio for the specific pods to be heard. Government prefers speaker systems at the operator and controller stations but is friendly to in-ceiling option so long as the audio is restricted as previously stated and does not cross/bleed over to adjacent rooms. Important to note none of the operator stations have speakers ingregrated or currently connected to them; however, each workstation has a line out available for external speakers to be connected.
2.10 Conference Room.
2.10.1 Furnish and install Camera ready ports for camera plug & play and integration with A/V solution for the conference room. Government will provide camera at install. System integrating the GFE provided camera will not require auto-tracking or framing.
2.10.2 Furnish and install Room Navigator and Standalone Equalizer w/ no radio.
2.10.3 Furnish and install in-ceiling white suspended grid acoustical ceiling tile for speaker system capable of distributing audio or contractor can choose to utilize the existing ceiling tile and mount the speaker system on it; however, the audio shall be restricted to the conference room and not be heard from adjacent rooms. Government does not require a voice-lift for this room.
2.10.4 Furnish and install two lecterns capable of housing 1 GFE equipment workstation each and any equipment required to run the conference room equipment and control panel.
2.10.5 Furnish and install a lectern monitor meeting the diagonal in size range of 50in to 65in placed on the opposite wall to the lecterns. Conference Room dimensions are 15ft by 30ft.
2.10.6 Furnish and install a 10in tabletop control panel integrating the A/V solution, and capable of quickly muting and turning off displays/camera.
2.10.7 Integrate 2 GFE 75” TV’s that will display classified content from the 2 GFE workstations identified in 2.3.4. These displays will be incorporate a minimum of 2 sources and will be mounted in the east wall opposite to the head of the table and entrance into the conference room.
2.10.8 Government can provide the fiber infrastructure to connect the Datawall solution. Should contractors choose to use GFE provided fiber infrastructure, the contractors is required to purchase devices or equipment capable of converting MMF to SMF as the GFE fiber cabling infrastructure is SMF cabling. Additionally, should the contractors choose to use the GFE provided fiber infrastructure, the government can allot up to 8 ports on a cassette which will cover 2 pods.
2.11 Closeout Items.
2.11.1 Contractor is responsible to provide one (1) copies of all manuals (for non-government supplied equipment) and the system architecture design drawings - for maintenance and future upgrades. All the cables, connection boxes, and wall-mounted plates shall be labeled to identify connectivity in accordance with the system architecture.
2.11.2 Contractor is responsible for replacement of government owned equipment in the event of damage to equipment either through accident, installation, or during functional checks.
2.11.3 Vendor is responsible to clean-up debris and remove any incidental marks on walls generated by the installation. The contractor shall clean the work sites at the end of each workday, remove and dispose of all debris at an off-base location in accordance with state and federal laws and regulations.
2.11.4 Vendor is responsible to refinish/repair and restore to original appearance any damage to facility fixtures, walls, or equipment caused by the installation. Any damage to the wall and/or ceiling during installation of equipment shall be professionally repaired to match texture and color of surrounding area. Damaged ceiling tiles or flooring material shall be replaced with matching material.
2.11.5 Vendor shall perform operational test that includes a test of all features of installed equipment with a government representative to assure compliance with expected product performance upon completion of the installation.
2.11.6 Vendor will provide customer training on operation and user maintenance of installed equipment after confirming installation is complete and operable. Vendor will also provide customer with all user manuals and warranty documents for installed equipment.
3.0 Government Furnished Lists:
1. Two (2) Samsung 75” 4K UHD flat panel displays.
S/N: 0DRJHCAW800068R and S/N: 0DRJHCAW800057 Part: SAM-QB75B-N and Order: 114950640
2. APC Rack MODEL: AR3150 and S/N: ON11530140085
3. Camera:
4. Secure KVM Switch: Belkin P/N: F1DN104KVM-UN-4
4.0 Video Wall, Controller Desk, and Pod Layout.
The following diagrams illustrate the configuration of the six video displays along the north wall (Figure 4.1), including dimensions as specified in the technical re
Figure 4.1
Figure 4.2
| 1.0 Scope: |
| 1.1 Background: |
| The 179th Cyber Operations Group (COG) requires the installation of a new video/data wall. This capability will allow for more effective command and control awareness, mission briefings, training sessions, presentations, and current/future... |
| 1.2 Objective: |
| 1.3 Period of Performance (PoP): 210 Days |
| 1.4 General Information |
| 1.5.1 The contractor shall verify that identification credentials presented by all contractors and subcontractor employees to obtain security badges, passes, cards, or decals used during the duration of this contract are current and correct. |
| 1.5.2 The contractor’s employees shall become familiar with and obey the regulations of the installation including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when r... |
| 1.5.3 Contractors who require access onto the installation for 30 days or more may be issued a contractor pass. For Contractors requiring less than 30 days access onto the installation may be issued a Defense Biometric Identification System (DBIDS) ge... |
| 1.5.4 A background check is required and access to the TS/SCI facility is restricted to US citizens only no foreigners or dual citizenship shall be allowed. The contractors will not be allowed to utilize any electronics of any fashion to include medic... |
| 1.5.5 Contractors shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer. The contractor shall also provide all information required for background c... |
| 1. Two (2) Samsung 75” 4K UHD flat panel displays. |