This is a Statement of Work (SOW) for a new data wall installation at Mansfield Air National Guard's 179th Cyber Operations Group, dated August 6, 2025. The contractor must provide all personnel, equipment, tools, materials, and supervision to design and install an integrated video/data wall system within building 409 Relocatable Facility at 1947 Harrington Memorial Road, Mansfield OH 44903. The project requires installation of a large format data/video wall for four different network enclaves covering an operations floor measuring 110' by 40', with minimum 6 video inputs switchable from at least 29 sources, plus operator station speaker systems with restricted audio coverage of 6 feet to avoid disturbing neighboring offices.
The SOW also requires upgrading an adjacent conference room (15' by 30') with a 4K digital display system, two wall-mounted 1080p cameras, TAA compliant room navigator and equalizer, ceiling-mounted microphone and speaker systems, two lecterns with 42" monitors, and a 10" tabletop control panel. All equipment must comply with the AF JWICS Approved Product List with no exceptions, and equipment approval from 16th AF and NGB CISO office typically takes 90-120 days. The contractor must provide US citizens only for TS/SCI facility access, complete antiterrorism Level I training, maintain REAL ID compliance, and perform services Tuesday-Friday 0830-1630 excluding federal holidays. Government furnished equipment includes two Samsung 75" 4K UHD displays and one APC equipment rack. The period of performance is listed as TBD.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mansfield Air National Guard Statement of Work (SOW)
New Data Wall Installation
6 AUGUST 2025
1.0 Scope:
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to provide and install an integrated new video/data wall within building 409 Relocatable Facility (RLF) located on 179th CW Mansfield Ohio Air National Guard, 1947 Harrington Memorial Road, Mansfield OH 44903, as defined in this SOW.
1.1 Background:
The 179th Cyber Operations Group (COG) requires the installation of a new video/data wall.
This capability will allow for more effective command and control awareness, mission briefings, training sessions, presentations, and current/future operational taskings.
1.2 Objective:
The 179th COG seeks a large format data/video wall for 4 differing network enclaves covering the length of the operations floor with the dimensions of 110’ by 40’ installed with minimum of 6 video inputs that can be switched and customized from a minimum of 29 sources within the operations floor. Audio should be heard from speakers placed on operator’s desk on the ops floor and audio coverage shall not exceed 6 feet from the location of the speaker to not disturb neighboring offices. Additionally, the 179th COG seeks to upgrade the conference room adjacent to the operations floor with the design and installations of a Digital Media Presentation System that incorporates a video streaming / presentation functionality that will integrate with GFE enterprise teleconferencing.
1.3 Period of Performance (PoP): TBD
1.4 General Information
1.4.1 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:
New Year’s Day: January 1st Martin Luther King, Jr.’s Birthday President’s Day Memorial Day Independence Day: July 4th Labor Day Columbus Day Veteran’s Day: November 11th Thanksgiving Day Christmas Day
1.4.2 Place and Performance of Services: The contractor shall provide services between the hours of
0830-4:30 on Tuesday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at building 409 RLF 179th CW Mansfield Ohio Air National Guard, 1947 Harrington Memorial
Road, Mansfield OH 44903. The contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5 Base Access
1.5.1 The contractor shall verify that identification credentials presented by all contractors and subcontractor employees to obtain security badges, passes, cards, or decals used during the duration of this contract are current and correct.
1.5.2 The contractor’s employees shall become familiar with and obey the regulations of the installation including fire, traffic, safety and security regulations while on the installation.
Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.
The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.5.3 Contractors who require access onto the installation for 30 days or more may be issued a contractor pass. For Contractors requiring less than 30 days access onto the installation may be issued a Defense Biometric Identification System (DBIDS) generated AF Form 75, Visitors Pass. The Defense Forces Commander (DFC) maintains the right to deny contractors access to the installation based on unfavorable information obtained through NCIC or DBIDS. 1.13.4.
Contractors working on the installation need to complete an Antiterrorism Level I training. The training can be found at https://jko.jten.mil/courses/AT-level1/launch.html. Please ensure contractors are attaching their certificates along with their applications. Contractors who have not completed an Antiterrorism Level I training will not be allowed on the installation.
1.5.4 A background check is required and access to the TS/SCI facility is restricted to US citizens only no foreigners or dual citizenship shall be allowed. The contractors will not be allowed to utilize any electronics of any fashion to include medical devices within the TS/SCI facility unless prior authorization has been granted. To request prior authorization a two-week lead time is required and the submission can be sent to the following email address 179og.infosec.sso-isso-sysadm@us.af.mil.
1.5.5 Contractors shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy.
Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
https://jko.jten.mil/courses/AT-level1/launch.html
1.5.6 All contractor and subcontractor personnel shall present REAL ID-compliant identification for establishing identity for unescorted access. Individuals who do not possess a REAL ID Act compliant form of identification shall be denied access to the installation. However, individuals with non REAL ID-compliant identification may also present an original or certified true copy of a birth certificate and their social security card.
1.5.7 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
2.0 Requirements
2.1 All equipment purchases for this project will be restricted to the Approved Product List (APL) released by AF JWICS. This approved product list changes periodically, but the government can provide upon request. There are no exceptions. The government reserves the right to review and deny purchased equipment entry specific for this project into the TS/SCI facility.
2.1.1 Immediately following contract award, the government will request approval for the equipment quoted for this project from the 16th AF Approving Official and NGB CISO office. Current lead time for approval is typically 90-120 days. Contractor shall not order/purchase equipment under this contract without written approval from the Contracting Officer. The Government shall not be liable for costs associated with the contractor purchasing/ordering equipment prior to receiving equipment approval from 16th AF Approving Official and NGB CISO office.
2.2 Design and install video wall.
2.2.1 Internet Protocol (IP) scalable A/V wall solution controlled from 2 desks.
2.2.2 The displays will be divisible and capable of showing 6 large images (side-by-side) 24 individual images, or a 4 large image plus 16-quad smaller images.
2.2.3 Furnish and install operator station speaker systems capable of distributing audio to the operations floor with the dimensions of 110’ by 40’ and integrated with A/V switcher.
2.2.4 Displays will be required to either be stand-alone without load bearing support from the wall or capable of being mounted on the “false/interior” wall with stud spacing of 16” apart on the operations floor.
2.3 Design, furnish and install digital display capable of 4K resolution in the conference room capable of receiving multiple inputs.
2.3.1 Furnish and install two wall-mounted quality cameras capable of generating at least a 1080p resolution and capturing different angles of the conference room.
2.3.2 Furnish and install a TAA compliant Room Navigator and Standalone Equalizer w/ no radio.
2.3.3 Furnish and install in-ceiling white suspended grid acoustical ceiling tile for microphone and speaker system capable of distributing audio and detecting voice from members sitting at the conference table or around the room; however, mic pickup and audio shall be restricted to the conference room and not be heard from adjacent rooms.
2.3.4 Furnish and install two lecterns capable of housing 1 GFE equipment workstation each and any equipment required to run the conference room equipment and control panel.
2.3.5 Furnish and install a minimum 42’’ lectern monitor placed on opposite lecterns. Conference Room dimensions are 15 by 30 and the lectern monitor needs to be large enough for the presenter to see and read from the furnished lecterns.
2.3.6 Furnish and install a 10” tabletop control panel integrating the A/V solution, and capable of quickly muting and turning off displays/camera.
Operations Floor All layouts will be selectable by two TAA compliant control touch panel systems.
Add TAA compliant 4K/UHD 500NIT displays to switched AV system Add 2 TAA compliant flat panel w/ Power Distribution Unit (PDU) wall mount systems for GFE LCD 75” 4K/UHD displays Integrate GFE 2 LCD, 75" 4K/UHD displays to switched AV system w/ flat panel systems Add TAA compliant card chasis capable of holding a minimum of 8 encoders/decoders w/
4K60 HDR SCALING NETWORK AV
Integrate all A/V equipment into GFE equipment rack. Rack space will house the encoders/decoders and all required systems Add TAA compliant Bi-Amplification (BIAMP) system Add TAA compliant rack mounted ups.
Add TAA compliant single mode fiber compatible switch w/ SMF transceivers for network transport of A/V Add TAA compliant 18G High Speed HDMI w/ variable lengths Add TAA compliant Digital Media switcher w/ 8G 4K60 HDR scaling input fiber cards and multi-channel 8G 4K60 HDR scaling output fiber cards Add TAA compliant Transmitter 4K Digital Media 8G 4K60 HDR Add TAA compliant speaker systems on operators’ desk Integrate speaker systems to switched A/V system
Conference Room:
Add 2 TAA compliant Lectern w/ rack shelf kit Add TAA compliant standalone codec EQ no-radio and table stand Room Navigator Add TAA wall mounted Lectern Monitor and integrate with A/V switcher Add TAA compliant 10.1” tabletop control panel Add TAA compliant two wall-mounted HD Camera w/ HDMI connection Add TAA compliant BIAMP system Add TAA compliant 18G High Speed HDMI w/ variable lengths Add TAA compliant amplification for audio Add voice-lift from TAA compliant Microphone (drop-down or otherwise) and speaker w/ 24" suspended grid acoustical ceiling tile that’s white and square. Audio pickup centered on conference table. Mic and speaker functionality controlled by touch panel.
Add TAA compliant Digital Media switcher w/ 8G 4K60 HDR scaling input fiber cards and multi-channel 8G 4K60 HDR scaling output fiber cards Add TAA compliant Transmitter 4K Digital Media 8G 4K60 HDR
All Equipment will be housed in the GFE equipment racks in frame room. Rack space will be dedicated to AV equipment for this installation.
2.4 If required, all power cords and data lines shall exit ceilings or wall-mounted at a point as close to the equipment as possible. If required, all power and data lines shall be mounted on walls in boxes with color-coded faceplates that match the type originally installed at the facility.
2.5 Contractor is responsible to provide one (1) copies of all manuals (for non-government supplied equipment) and the system architecture design drawings - for maintenance and future upgrades. All the cables, connection boxes, and wall-mounted plates shall be labeled to identify connectivity in accordance with the system architecture.
2.6 Contractor is responsible for replacement of government owned equipment in the event of damage to equipment either through accident, installation, or during functional checks.
2.7 Vendor is responsible to clean-up debris and remove any incidental marks on walls generated by the installation. The contractor shall clean the work sites at the end of each workday, remove and dispose of all debris at an off-base location in accordance with state and federal laws and regulations.
2.8 Vendor is responsible to refinish/repair and restore to original appearance any damage to facility fixtures, walls, or equipment caused by the installation. Any damage to the wall and/or ceiling during installation of equipment shall be professionally repaired to match texture and color of surrounding area. Damaged ceiling tiles or flooring material shall be replaced with matching material.
2.9 Vendor shall perform operational test that includes a test of all features of installed equipment with a government representative to assure compliance with expected product performance upon completion of the installation.
2.10 Vendor will provide customer training on operation and user maintenance of installed equipment after confirming installation is complete and operable. Vendor will also provide customer with all user manuals and warranty documents for installed equipment.
3.0 Government Furnished Lists:
1. Two (2) Samsung 75” 4K UHD flat panel displays.
S/N: 0DRJHCAW800068R and S/N: 0DRJHCAW800057 Part: SAM-QB75B-N and Order: 114950640
2. APC Rack MODEL: AR3150 and S/N: ON11530140085
| 1.0 Scope: |
| 1.1 Background: |
| The 179th Cyber Operations Group (COG) requires the installation of a new video/data wall. This capability will allow for more effective command and control awareness, mission briefings, training sessions, presentations, and current/future... |
| 1.2 Objective: |
| The 179th COG seeks a large format data/video wall for 4 differing network enclaves covering the length of the operations floor with the dimensions of 110’ by 40’ installed with minimum of 6 video inputs that can be switched and customized... |
| 1.3 Period of Performance (PoP): TBD |
| 1.4 General Information |
| 1.5.1 The contractor shall verify that identification credentials presented by all contractors and subcontractor employees to obtain security badges, passes, cards, or decals used during the duration of this contract are current and correct. |
| 1.5.2 The contractor’s employees shall become familiar with and obey the regulations of the installation including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when r... |
| 1.5.3 Contractors who require access onto the installation for 30 days or more may be issued a contractor pass. For Contractors requiring less than 30 days access onto the installation may be issued a Defense Biometric Identification System (DBIDS) ge... |
| 1.5.4 A background check is required and access to the TS/SCI facility is restricted to US citizens only no foreigners or dual citizenship shall be allowed. The contractors will not be allowed to utilize any electronics of any fashion to include medic... |
| 1.5.5 Contractors shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer. The contractor shall also provide all information required for background c... |
| 2.4 If required, all power cords and data lines shall exit ceilings or wall-mounted at a point as close to the equipment as possible. If required, all power and data lines shall be mounted on walls in boxes with color-coded faceplates that match the... |
| 1. Two (2) Samsung 75” 4K UHD flat panel displays. |