This solicitation notice seeks construction services for the Add/Alter B403 Corrosion Control project at Mansfield Air National Guard Base in Mansfield, Ohio. Renovation and new construction services are required, including interior/exterior demolition, new sidewalk and drive access, ATFP-compliant doors and exterior walls, installation of a new sprinkler system and compressed air lines, electrical upgrades, and new air handling equipment, fans and ductwork. The contract duration is estimated at 300 calendar days with a bid opening date of December 7, 2020. Additive bid items include additional corrosion work area, new air shower, motorized overhead door, and blast resistant windows. The project is set aside for small businesses with a NAICS code of 236220 and $1-5 million magnitude. The 179th Airlift Wing, Ohio Air National Guard is the issuing agency located at Mansfield Air National Guard Base.
View the file
Other files for this federal contract opportunity
Show all 50
ADD/ALTER B403 CC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
December 15, 2016
Captain Kiet Chung Contracting Officer Representative (COR) 179th Airlift Wing, Ohio Air National Guard 1947 Harrington Memorial Road Mansfield, OH 44903
RE: REV1 Final Status Survey Report Remediation Corrosion Control Facility – Building 403 Contract No. W91364-16-P-0217
Dear Capt. Chung;
I have attached REV1 of the Final Status Survey Report which includes additional information and clarification in response to the FSSR review comments provided by OANG Civil Engineering, Safety, and Environmental Management Offices, on December 03, 2016 and Bioenvironmental Engineering on December 08, 2016. In general, the OANG comments included the following:
Clarification regarding the shipment of material off-site Request for consistent use of the term “as free as practicable” from the RWP through the FSSR.
Additional clarification for the remaining dust
This revised document provides additional information and clarification to the OANG comments as follows:
Additional clarification concerning the shipment of material off-site provided with additional Bill of Ladings information.
A revision to the Certification Statement adding the phrase “as free as practicable” to provide consistent terminology with the RWP.
Revision of the FSSR to include additional clarification regarding the existing equipment, contents and interior conditions of Building 403 as it remains a Corrosion Control Facility.
Please confirm acceptance of the Deliverable (REV1 Final Status Survey Report) by Friday, December 16, 2016. Unless otherwise notified in writing of any issues, WAI will consider the Deliverable to be approved and accepted as submitted with a “no further action required” status.
As we have stated previously, in the event the OANG would plan to refurbish or renovation Building 403, we have included a recommendation to remove peeling paint prior to the installation of any new DMB equipment. Once Building 403 resumes operations, we would further recommend the use of 30” x 24” disposable “tacky” walk-off mats from Grainger Choice, 3M, or Crown Matting Technologies to help control the migration of materials within Building 403.
If you have any questions regarding the Final Status Survey Report, I can be reached by phone at (740) 443-7131, or by email at Scott.Moore@wadv.com
Sincerely, Scott A. Moore, Associate AIA Project Manager mailto:Scott.Moore@wadv.com
November 29, 2016
Captain Kiet Chung Contracting Officer Representative (COR) 179th Airlift Wing, Ohio Air National Guard 1947 Harrington Memorial Road Mansfield, OH 44903
RE: Final Status Survey Report Remediation Corrosion Control Facility – Building 403 Contract No. W91364-16-P-0217
Dear Capt. Chung;
I am pleased to inform you the Work activities outlined and approved in the Remediation Work Plan for the above referenced project have been completed. The purpose of this letter is to transmit the final deliverable, The Final Status Survey Report which provides documented certification that Building 403 is safe to occupy and resume corrosion control activities.
I have attached the Final Status Survey Report which includes two areas of documentation; the Final Status Survey Report that provides the support documented for the certification that Building 403 is safe for occupancy and the Project Completion Report that summarizes the remediation tasks completed within Building 403, provides a listing of waste disposal types, quantities, and manifests, as well as the disposition of all chemicals (hazardous materials) for the project.
This document establishes formal acceptance of the Deliverable for the Remediation Corrosion Control Facility, Building 403 project. Please confirm acceptance of the Deliverable (the Final Status Survey Report) by Friday, December 09, 2016. Unless otherwise notified in writing of any issues, WAI will consider the Deliverable to be approved and accepted as submitted with a “no further action required” status. WAI will commence final invoicing on Friday, December 09, 2016.
In the event the OANG would plan to refurbish or renovation Building 403, we have included a recommendation to remove peeling paint prior to the installation of any new DMB equipment. Once Building 403 resumes operations, we would further recommend the use of 30” x 24” disposable “tacky” walk-off mats from Grainger Choice, 3M, or Crown Matting Technologies to help control the migration of materials within Building 403.
WAI was pleased to work with you and the entire OANG Team to deliver a successful remediation project.
We look forward to future opportunities to work with you the OANG.
If you have any questions regarding the Final Status Survey Report, I can be reached by phone at (740) 443-7131, or by email at Scott.Moore@wadv.com
Sincerely, Scott A. Moore, Associate AIA Project Manager mailto:Scott.Moore@wadv.com
Environmental Remediation Services Provided for
Remediation Corrosion Control Facility, Building 403 in response to
Solicitation No. F7R0026116AW01
VOLUME 1 – TECHNICAL/MANAGEMENT PROPOSAL
Submitted to: 179 Airlift Wing, Ohio Air National Guard (OANG)
REV1 December 13, 2016
Wastren Advantage, Inc.
1571 Shyville Road
Piketon, OH 45661
Final Status Survey Report
Remediate Corrosion Control Facility
Building 403
November 29, 2016
REV 1 December 13, 2016
REVISIONS
Revision No. Date Change Description
1 12/13/2016 Admisistrative Clarifications
Remediate Corrosion Control Facility
Building 403
Prepared by
Wastren Advantage, Inc.
1571 Shyville Road
Piketon, Ohio
For the
Ohio Air National Guard Mansfield Ohio Air National Guard Base i Final Report, rev1
OANG Mansfield // RCCF Bldg. 403
Table of Contents
ACRONYMS .............................................................................................................................................. II
1. FINAL STATUS SURVEY REPORT
CERTIFICATION FOR OCCUPATION
2. PROJECT COMPLETION REPORT
SUMMARY OF REMEDIATION TASKS
LISTING OF WASTE DISPOSAL TYPES, QUANTITIES, AND MANIFESTS
DISPOSITION OF ALL CHEMICALS (HAZARDOUS MATERIALS)
ii Final Report, rev1
ACRONYMS
ABIH American Board of Industrial Hygiene AFI Air Force Instruction AIHA American Industrial Hygiene Association BMP Best Management Practices CIH Certified Industrial Hygienist CFR Code of Federal Regulations COR Contracting Officer Representative DMB Dry Media Blast DRZ Decontamination Reduction Zone DSZ Decontamination Support Zone DZ Decontamination Zone EPA U.S. Environmental Protection Agency FSSR Final Status Survey Report HASP Health and Safety Plan HAZMAT Hazardous Materials HEPA High Efficiency Air Particulate KO Contracting Officer LOTO Lockout/Tagout NGLSI New Green Legacy Services Incorporated OANG Ohio Air National Guard OSHA Occupational Safety and Health Administration PM Project Manager POC Point of Contact PPE Personal Protective Equipment QAM Quality Assurance Manager QAPP Quality Assurance Project Plan RWP Remediation Work Plan SDS Safety Data Sheet SOO Statement of Objectives SS Site Superintendent TCLP Toxicity Characteristic Leaching Procedure UFC Unified Facilities Criteria WAI Wastren Advantage Inc.
WMP Waste Management Plan
1 Final Report, rev1
1. FINAL STATUS SURVEY REPORT
CERTIFICATION FOR OCCUPATION
2 Final Report, rev1
2. PROJECT COMPLETION REPORT
SUMMARY OF REMEDIATION TASKS
LISTING OF WASTE DISPOSAL TYPES, QUANTITIES, AND MANIFESTS
DISPOSITION OF ALL CHEMICALS (HAZARDOUS MATERIALS)