Pre-Bid Conference-slides.pptx

PPTX presentation 845 KB Posted

Attached to
ADD/ALTER B403 CC Federal contract opportunity
Solicitation number
W50S8R-21-B-0001
Issued by
Department of the Army Ohio Army National Guard

About this file

This document includes a pre-bid conference presentation and federal contract opportunity notice for a corrosion control facility renovation and addition project. The 179th Airlift Wing, Mansfield Ohio ANG Contracting Office is soliciting offers for project number PBXP 169102 to renovate and add onto an existing corrosion control facility at Mansfield Air National Guard Base. The project scope involves interior and exterior demolition, new construction additions totaling up to 6,200 square feet, building system upgrades, and site work. The base wage determination is DOL OH20200099 modification 08. The acquisition is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. The pre-bid conference was held on November 5, 2020 and bids are due on December 7, 2020. The contract is for a firm-fixed price with an estimated period of performance of 300 calendar days. Additive bid items are included for additional scope of work and will be awarded in priority order if priced reasonably and funds allow.

View the file

Other files for this federal contract opportunity

Other files attached to ADD/ALTER B403 CC, newest first.
File Type Posted
Bid opening attendance sheet_B403.pdf PDF
Abstract_B403.pdf PDF
W508SR-21-B-0001 P00002.pdf PDF
RFI 32 response.pdf PDF
RFI 30 response.pdf PDF
RFI 29b response.pdf PDF
RFI 24 response.pdf PDF
RFI 11 attachment.pdf PDF
RFI 11 response.pdf PDF
W50S8R-21-B-0001 P00001.pdf PDF
RFI 33 response.pdf PDF
RFI 25 response.pdf PDF
RFI 29a response.pdf PDF
RFI 35 response.pdf PDF
RFI 34 response.pdf PDF
RFI 23 response.pdf PDF
RFI 26 response.pdf PDF
RFI 18 response.pdf PDF
RFI 19 response.pdf PDF
RFI 10 response.pdf PDF
RFI 28 response.pdf PDF
RFI 014 response.pdf PDF
RFI 12 response.pdf PDF
RFI 09 response.pdf PDF
RFI 03 response.pdf PDF
RFI 21 response.pdf PDF
RFI 20 response.pdf PDF
RFI 17 response.pdf PDF
RFI 16 response.pdf PDF
RFI 13 response.pdf PDF
RFI 06 response.pdf PDF
Exhibit A_Sealed Bid Checklist Reminders.rev01.pdf PDF
RFI 07 response.pdf PDF
RFI 08 response.pdf PDF
RFI 05 response.pdf PDF
RFI 15 response.pdf PDF
Attendance sheet.pdf PDF
RFI 02 response.pdf PDF
RFI 04 response.pdf PDF
Pre-Bid Conference minutes_B403.pdf PDF
RFI 01 response.pdf PDF
Attachment2_VOL 2_Drawings.pdf PDF
Exhibit A_Sealed Bid Checklist Reminders.pdf PDF
Attachment7_RFI template.doc DOC document
Attachment4_VOL 4_Specs (6-22).pdf PDF
Attachment3_VOL 3_Specs (1-5).pdf PDF
Attachment1_VOL 1_BoD.pdf PDF
Attachment6_Web Based Management Software.docx DOCX document
W50S8R-21-B-0001.pdf PDF
Attachment5_VOL 5_Specs (23-33).pdf PDF
Show all 50

ADD/ALTER B403 CC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADD/ALTER B403 CC

IFB: W50S8R-21-B-0001

PRE-BID/SITE VISIT CONFERENCE

05 November 2020

U N I T E D S T A T E S P R O P E R T Y & F I S C A L O F F I C E R for O H I O Module 4 2008

Before we get started… Subcontractors Presence is not a Government endorsement Conversations Past, present, future Pictures No aircraft, no apron Parameters Red-lines Bid/Offer

KEY PERSONNEL

Contracting Officer(s) Gordon Strom – 179th AW LT James Kliewer – 179th AW/OIC Contracting Officers Representative Maj Kiet Chung – 179th AW/Deputy BCE

Replace Fire Station, B911/SCOPE Firm-Fixed Price Construction Project Project No: PBXP 169102 – Add/Alter for Corrosion Control-B403, at Mansfield Air National Guard Base (MANGB), Mansfield, Ohio. The scope of this project is add (new construction) and alter (renovate) existing facility, not to exceed 6,200 SF. The corrosion control facility will provide space for prep and drying, abrasive blast rooms, and booths for mixing and applying paint, tool storage, lockers, and administrative areas. Estimated period of performance (from issuance of notice to proceed) is 300 calendar days.

INVITATION FOR BID (IFB)

UNRESTRICTED

NAISC 236220 $39.5 Million Size Standard $1,000,000 - $5,000,000 Public Bid Opening 07 Dec 2020 @ 1:00 PM This Bldg. and room (125 pax classroom) – *** there may be limit on prime bidder/number of attendees, based on current health protocols.*** Arrive minimum 15 minutes prior to bid closing, to ensure seating availability (and receipt of bid prior to closing time, if delivering bid at that time).

Late bids will not be accepted.

Base bid is fully funded.

SUBMISSION REQUIREMENTS

SEE SECTION 00010 NOTES AND SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS.

CLIN 0001 is Base Bid; CLIN’s 0002-0005 are additive bid items (ABI’s). ABI’s are listed in order of importance and will only be included in resulting contract action if price is reasonable and funds are available. Note that none, only one, or all ABI’s may be awarded. ABI’s will be awarded in order (e.g. #4 will not be awarded, if #1-#3 are not awarded).

Note CLIN structure and descriptions of all CLIN’s.

Cost factoring for following (in accordance with DIV 1):

As-Builts: $35,000 O&M Manuals: $20,000 Final Inspection: 1% Bids Evaluated IAW DFARS 252.236-7008-Contract Prices, Bid Schedule.

PRICE

As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering price & Responsibility.

CONSTRUCTION WAGE RATES/BONDS

Most current DOL Construction Wage rates will apply OH20200099, most current mod #: 08 (31 Jul 2020), for Richland County If wage determination is updated prior to award, updated wage determination shall apply to contract.

BID BOND:

Required SEE 52.228-1

Performance and Payment Bond Required SEE 52.228-15

IMPORTANT REMINDERS

IFB Award will be made without discussion

READ ENTIRE SOLICITATION REQUIREMENTS CAREFULLY

Ensure Bid Package is Complete (sec 00010 note 4) Plus Bid Schedule form Ensure Section 00600 Reps/Certs are completed Read Section 010000 General Contract Conditions Anticipate Award by 30 Dec 2020.

SOLICITATION QUESTIONS

Submit ALL RFI’s (requests for information) to the Contracting Officer at the email show below. DO NOT contact AE, 179th Civil Engineering personnel or any other Government employee directly. Doing so will only delay your answer. ALL questions shall come through the Contracting Office. RFI template shall be used by contractor for all questions; template sent out with solicitation Subject Line: Reference No. SOLICITATION W50S8R-21-B-0001 Email: gordon.strom.1@us.af.mil ***ALL RFI’s need to come from prime contractor submitting bid; please ensure subcontractors are sending you their RFI’s, for you to submit contracting officer***

ANSWERS TO QUESTIONS

All Questions/Requests answered and distributed on a Non-Attribution Basis and will be posted to Contract Opportunities on BetaSAM website.

Addendums will be issued for RFI’s answered and any applicable documents will be posted to noted website.

Amendments will be issued for any Solicitation changes, and will be posted to noted website.

Check Web Site Regularly And Don’t Forget To Refresh Web Page Submit all questions/RFI’s NO LATER THAN 5th working day prior to bid due date (as of today, that day would be 01 Dec 2020).

HELPFUL WEBSITES

https://beta.sam.gov/ Home will have links to Contract Opportunities, SAM registration and wage determinations.

SS 2011 Module 5

IFB DUE DATE

07 Dec 2020 @ 1:00 PM EST Will only be changed by issuing an Amendment to IFB

General Working Conditions Active flight line and parking apron to the west.

Clean-up as needed to prevent Foreign Object Debris (FOD) from blowing around active aircraft areas.

Daily safety briefings by site superintendent.

All vehicles entering the base will be inspected daily.

All on-site workers for any duration shall require a background investigation (Security access form); specific clearance guidance will be provided post-award/pre-construction meeting).

Deliveries will not require security clearance or Federal personnel escort; however, they shall be coordinated through COR (will cover more in-depth during pre-construction meeting).

General Conditions Electricity and water available will provided in reasonable amounts to facilitate construction. Note specification requirements for use of utilities (DIV 1, Section 50, Part 3.3 Availability and Use of Utility Services) Fuel for temporary heating - if required, shall be furnished by the contractor.

Primary access to project site shall be through front gate, located off of Harrington Memorial Rd.

END OF PRESENTATION

QUESTIONS