RFI 24 response.pdf
PDF 3 MB Posted
- Attached to
- ADD/ALTER B403 CC Federal contract opportunity
- Solicitation number
- W50S8R-21-B-0001
About this file
This document contains a federal solicitation notice and related request for information. The solicitation is for construction services for Project No. PBXP 169102 to add and alter an existing corrosion control facility at Mansfield Air National Guard Base in Mansfield, Ohio. Services required include interior and exterior demolition, new sidewalk and drive access, installation of security and life safety systems, mechanical and electrical upgrades. The pre-bid conference is scheduled for November 5th, 2020 and bids are due by December 7th, 2020. The project duration is estimated at 300 calendar days. Additive bid items are included for additional work areas, an air shower, overhead door, and blast resistant windows. The solicitation is set aside for small businesses with a NAICS code of 236220 and $1-5 million magnitude. Interested parties should register in SAM and monitor the website for amendments. The related request for information seeks clarification on foundation drain details shown on drawings.
View the file
Other files for this federal contract opportunity
Show all 50
ADD/ALTER B403 CC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From:
Date:
11/23/2020
To: Contracting Officer
1. Solicitation Number:
W50S8R-21-B-0001
2. Location of Project:
Building 403
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
Drawings A-302 & A-303 call for foundation drain and refer to civil drawings. Neither civil nor architectural drawings provide details. Please clarify.
Attachments:
Date Response Required:
By:
Title:
Requestor's FAX Number:
Requestor's Telephone Number:
C E
R E
S P
O N
S E
To:
Date:
Response:
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.
Contracting Officer:
TR010309
Text Box Footing drain route and details attached
12 77 mbaldwin PolyLine mbaldwin PolyLine mbaldwin Callout
4" FOOTING DRAIN IE 1292.00
mbaldwin Callout mbaldwin Text Box
16. INSTALL 4" FOOTING DRAIN, SEE PERIMETER DRAIN DETAIL. FOOTING DRAIN PIPE ADJACENT TO BUILDING SHALL BE PERFORATED. FOOTING DRAIN PIPE MORE THAN 3-FEET AWAY FROM BUILDING SHALL BE SOLID WALL. PROVDE FITTINGS AT ANGLE POINTS AS REQUIRED.