RFI 13 response.pdf

PDF 70 KB Posted

Attached to
ADD/ALTER B403 CC Federal contract opportunity
Solicitation number
W50S8R-21-B-0001
Issued by
Department of the Army Ohio Army National Guard

About this file

This document contains a federal contract solicitation notice for construction services at Mansfield Air National Guard Base in Mansfield, Ohio. The 179th Airlift Wing Ohio Army National Guard is seeking bids to renovate and construct additions to Building 403 for corrosion control facilities. The work includes interior and exterior demolition, new sidewalks and drive access, installation of security doors and windows, a sprinkler system, compressed air lines and ductwork, electrical upgrades, and a new wireless network. The base estimate for the contract duration is 300 calendar days. Additive bid items are included for additional work areas, an air shower, overhead door, and blast resistant windows. Bids are due by December 7, 2020 and will be evaluated without discussions. The solicitation is set aside for small businesses with a size standard of $39.5 million average annual revenue. The contract value is estimated between $1-5 million.

View the file

Other files for this federal contract opportunity

Other files attached to ADD/ALTER B403 CC, newest first.
File Type Posted
Abstract_B403.pdf PDF
Bid opening attendance sheet_B403.pdf PDF
W508SR-21-B-0001 P00002.pdf PDF
RFI 30 response.pdf PDF
RFI 29b response.pdf PDF
RFI 24 response.pdf PDF
RFI 11 attachment.pdf PDF
RFI 11 response.pdf PDF
W50S8R-21-B-0001 P00001.pdf PDF
RFI 33 response.pdf PDF
RFI 25 response.pdf PDF
RFI 32 response.pdf PDF
RFI 35 response.pdf PDF
RFI 34 response.pdf PDF
RFI 29a response.pdf PDF
RFI 26 response.pdf PDF
RFI 23 response.pdf PDF
RFI 19 response.pdf PDF
RFI 10 response.pdf PDF
RFI 28 response.pdf PDF
RFI 18 response.pdf PDF
RFI 03 response.pdf PDF
RFI 21 response.pdf PDF
RFI 014 response.pdf PDF
RFI 12 response.pdf PDF
RFI 09 response.pdf PDF
RFI 20 response.pdf PDF
RFI 17 response.pdf PDF
RFI 16 response.pdf PDF
Exhibit A_Sealed Bid Checklist Reminders.rev01.pdf PDF
RFI 07 response.pdf PDF
RFI 08 response.pdf PDF
RFI 05 response.pdf PDF
RFI 06 response.pdf PDF
RFI 15 response.pdf PDF
RFI 02 response.pdf PDF
RFI 04 response.pdf PDF
Pre-Bid Conference minutes_B403.pdf PDF
Attendance sheet.pdf PDF
RFI 01 response.pdf PDF
Pre-Bid Conference-slides.pptx PPTX presentation
Exhibit A_Sealed Bid Checklist Reminders.pdf PDF
Attachment7_RFI template.doc DOC document
Attachment4_VOL 4_Specs (6-22).pdf PDF
Attachment3_VOL 3_Specs (1-5).pdf PDF
Attachment1_VOL 1_BoD.pdf PDF
Attachment6_Web Based Management Software.docx DOCX document
W50S8R-21-B-0001.pdf PDF
Attachment2_VOL 2_Drawings.pdf PDF
Attachment5_VOL 5_Specs (23-33).pdf PDF
Show all 50

ADD/ALTER B403 CC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Date:

11/12/2020

To: Contracting Officer

1. Solicitation Number:

W50S8R-21-B-0001

2. Location of Project:

Building 403

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

Amendment #001, Pre-Bid+Conference-slides file calls for $35,000 of As-Builts and $20,000 of O&M Manuals. None of other documents clarify applications of these cost. Is it for references only or these are the Government allowances that a prime contractor shall carry in its base bid? Please specify.

Attachments:

Date Response Required:

By:

Title:

Requestor's FAX Number:

Requestor's Telephone Number:

C E

R E

S P

O N

S E

To:

Date:

Response:

As stated in pre-bid, these totals are a part of submitter’s overall bid cost/price, and needs to be accounted for as such, as stated in

Specification Section 3.3.18 (pre-bid slides are only emphasis points and reiteration of what is called for in solicitation and specs/drawings).

Pre-Bid Slides DO NOT change or overrule any information stated in official solicitation, specifications, or drawings.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

File details come from the government source that posted it. Updated .