RFI 014 response.pdf
PDF 77 KB Posted
- Attached to
- ADD/ALTER B403 CC Federal contract opportunity
- Solicitation number
- W50S8R-21-B-0001
About this file
This document contains a request for information and related federal contract opportunity notice. The request for information pertains to specification requirements for third party certification on a project to add and alter Building 403 for corrosion control at Mansfield Air National Guard Base in Ohio. The contracting officer responds that third party certification is not required for this project as the reference was inadvertently included.
The related federal contract opportunity is a solicitation notice for the addition and alteration of Building 403 corrosion control facility. The project scope includes demolition, site work, security upgrades, mechanical and electrical systems work. The estimated construction duration is 300 days with a bid opening date of December 7, 2020. The solicitation is set aside for small businesses with a magnitude between $1 million to $5 million. The pre-bid conference is scheduled for November 5 and the solicitation and plans are available on beta.SAM.
View the file
Other files for this federal contract opportunity
Show all 50
ADD/ALTER B403 CC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From:
Date:
11/12/2020
To: Contracting Officer
1. Solicitation Number:
W50S8R-21-B-0001
2. Location of Project:
Building 403
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
Spec 01 33 29 calls for Third Party Certification (TPC) Documentation. Can the project QCM perform role and duties of TPC, if he meets this qualification or the Government requires an independent company?
Attachments:
Date Response Required:
By:
Title:
Requestor's FAX Number:
Requestor's Telephone Number:
C E
R E
S P
O N
S E
To:
Date:
Response:
TPC isn’t required for this project. The reference to it was inadvertently left within the spec. It doesn’t apply.
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.