About this file

This document contains a solicitation notice and project description for federal contract opportunity number W50S8R-21-B-0001 issued by the 179th Airlift Wing, Mansfield Ohio ANG Contracting Office. The opportunity involves construction services for Project PBXP 169102 to add and alter Building 403 for corrosion control at Mansfield Air National Guard Base. Services include interior and exterior demolition, new sidewalks and drive access, security doors and windows, sprinkler and compressed air system installation, electrical upgrades, and wireless and intercom infrastructure. The pre-bid conference is scheduled for November 5th and bids are due December 7th. The project value is between $1-5 million and has an estimated 300-day performance period. The solicitation is set aside exclusively for small businesses in NAICS code 236220 with a size standard of $39.5 million average annual revenue.

View the file

Other files for this federal contract opportunity

Other files attached to ADD/ALTER B403 CC, newest first.
File Type Posted
Bid opening attendance sheet_B403.pdf PDF
Abstract_B403.pdf PDF
W508SR-21-B-0001 P00002.pdf PDF
RFI 30 response.pdf PDF
RFI 29b response.pdf PDF
RFI 24 response.pdf PDF
RFI 11 attachment.pdf PDF
RFI 11 response.pdf PDF
RFI 32 response.pdf PDF
W50S8R-21-B-0001 P00001.pdf PDF
RFI 33 response.pdf PDF
RFI 25 response.pdf PDF
RFI 35 response.pdf PDF
RFI 29a response.pdf PDF
RFI 34 response.pdf PDF
RFI 26 response.pdf PDF
RFI 23 response.pdf PDF
RFI 19 response.pdf PDF
RFI 10 response.pdf PDF
RFI 18 response.pdf PDF
RFI 28 response.pdf PDF
RFI 03 response.pdf PDF
RFI 014 response.pdf PDF
RFI 12 response.pdf PDF
RFI 09 response.pdf PDF
RFI 21 response.pdf PDF
RFI 20 response.pdf PDF
RFI 17 response.pdf PDF
Exhibit A_Sealed Bid Checklist Reminders.rev01.pdf PDF
RFI 07 response.pdf PDF
RFI 13 response.pdf PDF
RFI 06 response.pdf PDF
RFI 08 response.pdf PDF
RFI 05 response.pdf PDF
RFI 15 response.pdf PDF
RFI 02 response.pdf PDF
Attendance sheet.pdf PDF
RFI 04 response.pdf PDF
Pre-Bid Conference minutes_B403.pdf PDF
RFI 01 response.pdf PDF
Pre-Bid Conference-slides.pptx PPTX presentation
Exhibit A_Sealed Bid Checklist Reminders.pdf PDF
Attachment7_RFI template.doc DOC document
Attachment4_VOL 4_Specs (6-22).pdf PDF
Attachment3_VOL 3_Specs (1-5).pdf PDF
Attachment1_VOL 1_BoD.pdf PDF
Attachment2_VOL 2_Drawings.pdf PDF
Attachment6_Web Based Management Software.docx DOCX document
W50S8R-21-B-0001.pdf PDF
Attachment5_VOL 5_Specs (23-33).pdf PDF
Show all 50

ADD/ALTER B403 CC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Date:

11/16/2020

To: Contracting Officer

1. Solicitation Number:

W50S8R-21-B-0001

2. Location of Project:

Building 403

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

If the insulation value is to be a minimum R-40 with a fully-tapered insulation system (7” starting thickness), the overall thickness at the highest point of the roof system will be approximately 19” thick exceeding the perimeter wall height of 117’-4” indicated on a roof framing plan. There are two elevations listed for the top of the new CMU wall: 117'-4" on the structural framing plan and 118' on the architectural plan. Which new CMU wall height is correct?

Attachments:

Date Response Required:

By:

Title:

Requestor's FAX Number:

Requestor's Telephone Number:

C E

R E

S P

O N

S E

To:

Date:

Response:

118’-0” is correct and noted on C/S-301. The 117’-4” elevation noted on S-111 is incorrect.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

File details come from the government source that posted it. Updated .