Demo Old Combat Comm Sq Bldgs 109 & 121
Solicitation number
W50S8Q-20-B-0007
Issued by

About this file

This document provides details for a federal solicitation seeking demolition services at Springfield Air National Guard Base in Ohio. The solicitation requires contractors to demolish Buildings 109 and 121, including asbestos abatement, pavement removal, and utility capping and tie-off. Contractors must also backfill with suitable material to create a level surface and complete the area with sod and sidewalk. The 100-day period of performance begins with notice to proceed. The total contract value is estimated between $1-5 million. The pre-bid conference is scheduled for September 1st and bids are due on September 24th. The solicitation is set aside for total women-owned small businesses. The North American Industry Classification code is 238910 and the size standard is $16.5 million in average annual revenue for the past three years.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers W50S8Q-20-B-0007 Demo Old Comm Sq Bldgs 109 & 121 Q1. Are you requiring the asbestos containing flooring be removed prior to demo, or can the asbestos containing flooring remain in place during mechanical demo?

A1. All Contractor shall follow EPA and NESHAP guidance when it comes to the demo of buildings 109 and 121. Contractors are also advised to contact the Ohio Department of Health.

Q2. Handout called for priced breakdown (letter c.) Please verify proposal is to have single lump sum number.

A2. Bid is to be a single lump sum.

Q3. Note 1 utility call for contractor to ‘remove transformers….relocated to CE Storage’….is CE storage on base and will the government provide portage and unloading?

A3. CE Storage is on base. Transformers will be stored in the parking lot of BLDG 152. We ask that the contractors use their own means to transport across base.

Q4. Permits for NOI/SWPPP/EPA 10 day wait will affect 100 CCD. Will government entertain the use of:

0. NTP #1 Contractor to collect all required permits?

0. NTP # 2 Start construction (POP 100 days from NTP #2)?

The Prime Contractor cannot accurately predict the accountability and issuance of bureaucratic permits as it relates to the overall 100 day POP. Please advise.

A4. The Government provides extra days past POP to complete paperwork.

Q5. Funds are not presently available. When is anticipated construction period? Will Prime Contractor need to include cold weather provisions for concrete placement? Also, most manufacturers will not warrant paint striping material unless applied in favorable conditions (40 degrees and rising at 8am). Lastly, restoration of grass/seed/ straw will only grow during the season as noted by USACE standards. Please advise as it relates to the 100 day POP.

A5. After contract is awarded the government will work with the contractor to provide the best possible schedule based on time of year and inclement weather.

Q6. Are there onsite outage and area clearance permits required to terminate utilities? If so, how long do they typically take to secure?

A6. No permits should be necessary. Planning may have to be done for water outages.

Q7. Will required fill be made available to prime contractor via onsite location? If not, and prime is required to truck fill in, will it require a proctor? (Note: premium screened topsoil import is not part of this question.)

A7. Fill will not be made available to contractor. It will be the contractor’s responsibility to bring in necessary fill.

Q8. Will the site be available for a second site visit? We have garnered more interest and more subcontractors to establish a competitive number on the behalf of the government.

A8. No. With the short timeframe due to end of year, we are unable to have another site visit.

Q9. Please provide interior photos of buildings.

A9. Because of timeframe photos will not be provided. Contractors had time to take photos during site visit.

Q10. Please provide as-built drawings of building.

A10. Government will provide what is available.

Q11. Can Cat 1 non-friable ACM be demolished and disposed of at an ACM accepting C&D facility without separation?

A11. See A1

Q12. Have existing transformers been tested for PCBs?

A12. There are no PCBs in transformers.

Q13. Are utilities designated for removal to be excavated and removed, or can grout fill abandonment be used?

A13. SEE Drawing #1 Utility Demo

Q14. To what limits are utilities to be removed in relation to proposed demo work?

A14. See A13

Q15. To what extent does contractor remove existing sanitary lines from buildings 109 & 121?

A15. See A13

Q16. Is intent of utilities removal to be reused for future construction?

A16. See A13

Q17. Can you provide as-built or details on antenna pole base to be removed?

A17. See A10

Q18. Can bid date be extended?

A18. No. The solicitation is open for 30 days. The bid opening date has to be held within this fiscal year.

Q19. Document: W50S8Q-20-B-0007 Demo Solicitation Page: 49 Bid Item NO 0001 states …This project consists of demolishing Buildings 109 and 121, including asbestos abatement in both buildings…

Document: Attachment 5A – Asbestos Survey (Bldg 109) Page: 6 Section V. Discussion, Summary of Asbestos Containing Materials found states …This material should only be removed/disturbed by a licensed asbestos abatement contractor. However, as this is a category 1 non-friable asbestos-containing material which is in good condition, it may remain in place during demolition, assuming the demolition activities do not render it friable…

Document: Attachment 5B – Asbestos Survey (Bldg 121) Page: 6 Section V. Discussion states …the tile and mastic samples taken from this structure (#4, #5, #6, and #7) came back positive for asbestos. This material should only be removed/disturbed by a licensed asbestos abatement contractor. However, as these are category 1 non-friable asbestos-containing materials, which are in good condition, they may remain in place during demolition, assuming the demolition activities do not render it friable

Question: Is the intent of Bid Item NO 0001’s description to require asbestos abatement in both buildings prior to demolition? In contrast to the Asbestos Survey discussions that it may remain in place during demolition, assuming the demolition activities do not render it friable.

A19. See A1

Q20. Can utilities be capped and abandoned in place?

A20. See Drawing #1 Utility Demo

Q21. Is proposed area of disturbance over one acre?

A21. Yes

Q22. Is the existing communications service being demolished by the government?

A22. All main feeds to buildings 109 and 121 will be removed by air force. All internal com we be removed by CONTRACTOR.

Q23. Is water accessible for contractor’s use, either from nearby building or fire hydrant without metering?

A23. Yes

Q24. Is the existing gas line already capped/demolished? If so, where is it currently capped? If not, who is the utility company?

A24. The gas has been turned off to the building, and meters have been removed. The status of the lines must be answered by the gas company, Columbia Gas.

Q25. If contractors have a DBIDS pass will their vehicles need to be searched upon entering base?

A25. Yes

Q26. What is the approximate square footage of each building?

A26. 109 is approx. 15,108sqft and 121 is approx. 5,542sqft

Q27. Who owns the utilities for the buildings? If not the Installation’s, can the names of the utilities be provided so bidders can contact for pricing and procedures for installation?

A27. All utilities are owed by government except gas. See A24 for Gas Company.

Q28. Please provide drawing indicating dimensions of buildings 109 and 121, to allow for calculation of building gross square footage.

A28. See A26

Q29. Do buildings 109 and 121 contain basements?

A29. 109 has a basement and 121 does not.

Q30. Is there an estimated basement square footage to use for estimating purposes, if buildings 109 and 121 contain basements?

A30. Bldg. 109 650sqft +/- Bldg. 121 has no basement.

Q31. Is it known what year(s) buildings 109 and 121 were built?

A31. Bldg.109 – (1983) Bldg.121 – (1981)

Q32. Can you please provide Section 01 33 00, Submittals?

A32. Not sure about Question.

Q33. While working on the bid for the demolition of buildings 109 & 121 I discovered a question. It looks like where we are installing the new sidewalk and curb will leave a section of the building towards the street without any pavement. I didn’t see any requirement for patching back any asphalt. The picture below show a line where the sidewalk and curb are to be installed. The building to the left of the line will be removed and there will be no pavement to stripe following demolition. Can you please advise whether we are to patch the street where the building is located following demolition?

A33. Yes, The CONTRACTOR shall patch the street with asphalt where the building was demolished. It was always the government’s intent for the new parking area to be all asphalt. The Government will issue a revised sidewalk drawing to reflect the asphalt patch needed. See Drawing #3 (Sidewalk and Striping revised)

Q34. Is it intentional to have acceptance of bids and PoP durations potentially overlap?

A34. The acceptance period is extended to allow time for availability of funds. The PoP could change based on Government acceptance/award of contract.