This is an Optional Form 1419A (Abstract of Offers - Construction Continuation Sheet) showing bid details for solicitation W50S8K25BA001 for the construction of a BCE Storage Shed project LTUY192004.

The form displays bid information from four contractors: The Mantle Group Inc., Hof Construction Inc., AACON General Contractors, and Kendall LLC. All bidders provided 20% bid bonds and acknowledged amendments (3 amendments for first three bidders, 1 for Kendall LLC). The bids for the main construction work (Item 1) ranged from $250,000 (Kendall LLC) to $1,441,761.45 (AACON), with additional line items for related work. Item 2 ranged from $20,950 to $282,987.76, and Item 3 (measured in cubic yards) had prices ranging from $95 to $15,559.44, though not all bidders provided quotes for all items.

View the file

Other files

File Type Posted
C4 Bid Abstract OF1419A_page 3 of 3.pdf PDF
C4 Bid Abstract OF1419_page 1 of 3.pdf PDF
A3 LTUY192004 IFC Specifications_Revision 1 20250207.pdf PDF
Solicitation Amendment W50S8K25BA0010003 SF 30.pdf PDF
B6 LTUY192004 Bid Inquiry Responses (current 20250205).xlsx XLSX spreadsheet
Solicitation Amendment W50S8K25BA0010002 SF 30.pdf PDF
B6 LTUY192004 Bid Inquiry Responses (current 20250202).xlsx XLSX spreadsheet
B6 Bid Inquiry RFI 39 Attachment.docx DOCX document
Existing Bldg 6 of 8.jpg JPG image
Existing Bldg 3 of 8.jpg JPG image
Existing Bldg 4 of 8.jpg JPG image
Existing Bldg 7 of 8.jpg JPG image
Existing Bldg 8 of 8.jpg JPG image
Existing Bldg 1 of 8.jpg JPG image
Existing Bldg 5 of 8.jpg JPG image
Existing Bldg 2 of 8.jpg JPG image
B6 LTUY192004 Bid Inquiry Responses (current 20250127).xlsx XLSX spreadsheet
B7 20250123 Site Visit 2 Sign-In Sheet.pdf PDF
Solicitation Amendment W50S8K25BA0010001 SF 30.pdf PDF
Geotechnical Engineering Report_BCE Storage Shed.pdf PDF
B7 20241212 Pre-Bid Conference Sign-In Sheet.pdf PDF
B7 20241212 Pre-Bid Conference Slides.pdf PDF
A3 LTUY192004 IFC Specifications.pdf PDF
A3 LTUY192004 IFC Drawings.pdf PDF
Solicitation - W50S8K25BA001.pdf PDF
Brand Name or Equal JA (For SAM Posting).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET

1. SOLICITATION NUMBER

PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

2. PROJECT TITLE

NO.:

NO.:

NO.:

NO.:

A. OFFEROR

A. OFFEROR

A. OFFEROR

A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A. ITEM NO.

B. ESTIMATED QUANTITY

C. UNIT

D. UNIT PRICE

E. ESTIMATED AMOUNT

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable

OPTIONAL FORM 1419A (11-88)

8.2.1.3144.1.471865.466429

1. SOLICITATION NUMBER: W50S8K25BA001
2. PROJECT TITLE: LTUY192004 Construct BCE Storage Shed
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond, 20% of Bid
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond, 20% of Bid
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond, 20% of Bid
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond, 20% of Bid
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 3
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 3
4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.: 3
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 1
3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
3B. ESTIMATED QUANTITY:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.:
3C. CONTRACT ITEMS. UNIT:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.: 15559.44000000
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: 15559.44000000
4E. OFFERS (Continued) ESTIMATED.: 247.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: 247.00000000
4E. OFFERS (Continued) ESTIMATED.: 95.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.: 95.00000000
3C. CONTRACT ITEMS. UNIT: Cubic Yard
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: 3.00000000
4E. OFFERS (Continued) ESTIMATED.: 50000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: 50000.00000000
4E. OFFERS (Continued) ESTIMATED.: 282987.76000000
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: 282987.76000000
4E. OFFERS (Continued) ESTIMATED.: 20950.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: 20950.00000000
4E. OFFERS (Continued) ESTIMATED.: 25000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.: 25000.00000000
3C. CONTRACT ITEMS. UNIT: JOB
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: 2.00000000
3B. ESTIMATED QUANTITY: 1.00000000
3C. CONTRACT ITEMS. UNIT: JOB
4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 986999.00000000
4E. OFFERS (Continued) ESTIMATED.: 986999.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 1306000.00000000
4E. OFFERS (Continued) ESTIMATED.: 1306000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 1441761.49000000
4E. OFFERS (Continued) ESTIMATED.: 1411761.49000000
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 250000.00000000
4E. OFFERS (Continued) ESTIMATED.: 250000.00000000
PAGE OF: 2.00000000
PAGES: 3.00000000
Offeror number. Column 1 of 4.: 3
Offeror number. Column 2 of 4.: 4
Offeror number. Column 3 of 4.: 5
Offeror number. Column 4 of 4.: 6
A. OFFEROR: The Mantle Group, Inc.
A. OFFEROR: Hof Construction, Inc.
A. OFFEROR: AACON General Contractors
A. OFFEROR: Kendall, LLC