B6 Subpanel 2c.jpg
JPG image 3 MB Posted
- Solicitation number
- W50S8K24QA004
About this file
This document appears to be a solicitation (W50S8K24QA004) from the Department of the Army Missouri Army National Guard for the replacement of the Uninterruptible Power Supply (UPS) system in Building 39. The purpose of the project is to procure and install a 3-phase UPS system to ensure conditioned and continuous power supply for the data center's IT equipment during power disruptions. The solicitation uses a Statement of Objectives outlining the Government's requirements, and quoters are requested to submit a Statement of Work detailing their proposed solution and installation methods. A site visit has been scheduled for September 4, 2024, and instructions to quoters are provided starting on page 29. The pre-solicitation synopsis for this solicitation was previously posted under Notice ID: W50S8K24QA003.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W50S8K24QA0040001 SF 30.pdf | ||
| A2 SOO B39 Facility UPS revised 20240910.pdf | ||
| B6 Main Panel Breaker Label.jpg | JPG image | |
| B6 Main Panel.jpg | JPG image | |
| B6 Inoperable UPS Data Plate.jpg | JPG image | |
| B6 Bldg 39 2 of 2.jpg | JPG image | |
| B6 Subpanel 2a.jpg | JPG image | |
| B6 Subpanel 1.jpg | JPG image | |
| B6 Data Center Racks - UPS on right Main Panel to far left at end of bldg.jpg | JPG image | |
| B6 Inoperable UPS 1 of 2.jpg | JPG image | |
| B6 Inoperable UPS 2 of 2.jpg | JPG image | |
| B6 Subpanel 2b.jpg | JPG image | |
| B6 Bldg 39 1 of 2.jpg | JPG image | |
| B6 Main Panel Label.jpg | JPG image | |
| Solicitation - W50S8K24QA004.pdf | ||
| A2 SOO B39 Facility UPS 20240814.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .