B6 Main Panel.jpg
JPG image 2 MB Posted
- Solicitation number
- W50S8K24QA004
About this file
This document appears to be a solicitation for the replacement of the Uninterruptible Power Supply (UPS) system for the data center located in Building 39. The purpose of this project is to procure and install a 3-phase UPS system to ensure a conditioned and continuous power supply, safeguarding the data center's IT equipment during power disruptions. This acquisition uses a Statement of Objectives outlining the Government's requirements, and quoters are requested to submit a Statement of Work detailing their quoted solution and installation methods. A site visit has been scheduled for 4 September 2024 at 10:00 am local time. The solicitation is being issued by the Department of the Army Missouri Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A2 SOO B39 Facility UPS revised 20240910.pdf | ||
| Solicitation Amendment W50S8K24QA0040001 SF 30.pdf | ||
| B6 Subpanel 2c.jpg | JPG image | |
| B6 Main Panel Breaker Label.jpg | JPG image | |
| B6 Inoperable UPS Data Plate.jpg | JPG image | |
| B6 Bldg 39 2 of 2.jpg | JPG image | |
| B6 Subpanel 2a.jpg | JPG image | |
| B6 Subpanel 1.jpg | JPG image | |
| B6 Bldg 39 1 of 2.jpg | JPG image | |
| B6 Main Panel Label.jpg | JPG image | |
| B6 Data Center Racks - UPS on right Main Panel to far left at end of bldg.jpg | JPG image | |
| B6 Inoperable UPS 1 of 2.jpg | JPG image | |
| B6 Inoperable UPS 2 of 2.jpg | JPG image | |
| B6 Subpanel 2b.jpg | JPG image | |
| Solicitation - W50S8K24QA004.pdf | ||
| A2 SOO B39 Facility UPS 20240814.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .