B6 Main Panel Label.jpg

JPG image 2 MB Posted

Attached to
Replace Bldg 39 Facility Uninterruptible Power Supply (UPS) System
Solicitation number
W50S8K24QA004
Issued by

About this file

This document appears to be a solicitation (Solicitation Number W50S8K24QA004) issued by the Department of the Army Missouri Army National Guard for the replacement of the Uninterruptible Power Supply (UPS) system in Building 39. The purpose of this project is to procure and install a 3-phase UPS system to ensure continuous and conditioned power supply for the data center located in Building 39. The solicitation uses a Statement of Objectives format, and quoters are requested to submit a Statement of Work detailing their proposed solution and installation methods with their quote. A site visit has been scheduled for September 4, 2024, and instructions for registering are provided. The pre-solicitation synopsis for this solicitation was posted under Notice ID: W50S8K24QA003.

View the file

Other files

File Type Posted
A2 SOO B39 Facility UPS revised 20240910.pdf PDF
Solicitation Amendment W50S8K24QA0040001 SF 30.pdf PDF
B6 Subpanel 2c.jpg JPG image
B6 Main Panel Breaker Label.jpg JPG image
B6 Main Panel.jpg JPG image
B6 Inoperable UPS Data Plate.jpg JPG image
B6 Bldg 39 1 of 2.jpg JPG image
B6 Bldg 39 2 of 2.jpg JPG image
B6 Subpanel 2a.jpg JPG image
B6 Subpanel 1.jpg JPG image
B6 Data Center Racks - UPS on right Main Panel to far left at end of bldg.jpg JPG image
B6 Inoperable UPS 1 of 2.jpg JPG image
B6 Inoperable UPS 2 of 2.jpg JPG image
B6 Subpanel 2b.jpg JPG image
Solicitation - W50S8K24QA004.pdf PDF
A2 SOO B39 Facility UPS 20240814.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .