This document appears to be a Solicitation for a federal contract opportunity to replace the Uninterruptible Power Supply (UPS) system for the data center located in Building 39. The purpose of the project is to procure and install a 3-phase UPS system to ensure conditioned and continuous power supply, safeguarding the data center's IT equipment during power disruptions.
The solicitation uses a Statement of Objectives outlining the Government's requirements, and quoters are requested to submit a Statement of Work detailing their quoted solution and installation methods. A site visit is scheduled for September 4, 2024 at 10:00am local time. The contracting agency is the Department of the Army Missouri Army National Guard. The solicitation number is W50S8K24QA004, and the closing date is not provided in the information given.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A2 SOO B39 Facility UPS revised 20240910.pdf | ||
| Solicitation Amendment W50S8K24QA0040001 SF 30.pdf | ||
| B6 Subpanel 2a.jpg | JPG image | |
| B6 Main Panel.jpg | JPG image | |
| B6 Subpanel 1.jpg | JPG image | |
| B6 Main Panel Label.jpg | JPG image | |
| B6 Main Panel Breaker Label.jpg | JPG image | |
| B6 Inoperable UPS Data Plate.jpg | JPG image | |
| B6 Subpanel 2c.jpg | JPG image | |
| B6 Bldg 39 2 of 2.jpg | JPG image | |
| B6 Bldg 39 1 of 2.jpg | JPG image | |
| B6 Inoperable UPS 2 of 2.jpg | JPG image | |
| B6 Data Center Racks - UPS on right Main Panel to far left at end of bldg.jpg | JPG image | |
| B6 Inoperable UPS 1 of 2.jpg | JPG image | |
| Solicitation - W50S8K24QA004.pdf | ||
| A2 SOO B39 Facility UPS 20240814.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .