W50S8K20B00010001 Amendment 1.pdf

PDF 176 KB Posted

Attached to
Jefferson Barracks, Demolish Building 42 Federal contract opportunity
Solicitation number
W50S8K-20-B-0001
Issued by
Department of the Army Missouri Army National Guard

About this file

This federal contract opportunity amendment modifies an invitation for bid to demolish Building 42 at Jefferson Barracks in St. Louis, Missouri. The scope of work includes demolishing the approximately 11,000 square foot masonry building while salvaging reusable materials. The contract value is between $250,000 to $500,000 and is set aside 100% for Service-Disabled Veteran Owned Small Businesses. The deadline for bid submissions is extended to March 6, 2020. The period of performance is decreased from 180 to 120 calendar days after notice to proceed. The wage determination is also updated.

View the file

Other files for this federal contract opportunity

Other files attached to Jefferson Barracks, Demolish Building 42, newest first.
File Type Posted
Abstract of Bids.pdf PDF
Updated Lead Report for Building 42 (March 2020).pdf PDF
Building 42 Asbestos Report Recertification.pdf PDF
Building 42 Asbestos Report.pdf PDF
W50S8K20B00010002 Amendment 2.pdf PDF
Attach 1 - WD (Updated).pdf PDF
Bldg 42 Lead Report.pdf PDF
Attach 2 - SOW (Updated).pdf PDF
Bldg 42 Pre-Bid QA.xlsx XLSX spreadsheet
Bldg 42 Demolition Plans.pdf PDF
Bldg 42 Demo Environmental Key Talking Points.docx DOCX document
Site-Visit Sign In Sheet.pdf PDF
Attach 3 - EAL.docx DOCX document
Attach 1 - Wage Determination.pdf PDF
Attach 2 - SOW.pdf PDF
W50S8K20B0001 Demolish Building 42.pdf PDF
Attach 4 - Bid Bonds Checklist.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

1. Incorporate a revised Statement of Work dated 26 February 2020 replacing previous version dated 22 August 2018.

2. Extend the due date for bids to 10:00 AM central time on 6 March 2020.

3. Change the period of performance from 180 calendar days to 120 calendar days after receiving notice to proceed.

4. Incorporate a revised Wage Determination, MO20200056 dated 14 February 2020 replacing previous version dated 3 January 2020.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Feb-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8K20B0001

X 9B. DATED (SEE ITEM 11)

31-Jan-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Feb-2020

CODE

USPFO MO 131 MISSION SUPPORT CONTRACTING

29 SHERMAN AVENUE

SAINT LOUIS MO 63125

W50S8K 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8K20B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

USPFO FOR MISSOURI - W912NS

ATTN: TSGT MARK A. PHILLIPS,

131 BW MOANG

1 GRANT ROAD

SAINT LOUIS MO 63125-4117

to

USPFO MO 131 MISSION SUPPORT CONTRACTING

29 SHERMAN AVENUE

SAINT LOUIS MO 63125

The contractor period of performance end date has decreased by 60 days from 180 days to 120 days.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

180 dys. ANP 1 N/A

FOB: Destination

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

120 dys. ANP 1 N/A

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

180 dys. ANP 1 N/A

To:

CAGE

120 dys. ANP 1 N/A

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after issuance of notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: MO20200056 02/14/2020

Superseded General Decision Number: MO20190056

State: Missouri

Construction Type: Building

Counties: Crawford, Jefferson, Lincoln, St Louis and Washington Counties in Missouri.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/14/2020

ASBE0001-005 10/02/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 38.70 23.17

BOIL0027-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 35.41 30.04

BRMO0001-005 06/05/2019

JEFFERSON, LINCOLN & ST. LOUIS COUNTIES

Rates Fringes

BRICKLAYER.......................$ 36.94 21.46

BRMO0001-008 06/05/2019

CRAWFORD COUNTY

Rates Fringes

BRICKLAYER.......................$ 36.94 21.46

BRMO0011-005 06/05/2019

WASHINGTON COUNTY

Rates Fringes

BRICKLAYER.......................$ 30.60 12.75

TILE SETTER......................$ 30.60 12.75

BRMO0018-007 07/01/2019

CRAWFORD, JEFFERSON, LINCOLN & ST. LOUIS COUNTIES

Rates Fringes

TILE FINISHER....................$ 28.34 16.21

TILE SETTER......................$ 32.47 17.30

CARP0002-001 05/01/2019

ST LOUIS COUNTY

Rates Fringes

CARPENTER (Including Drywall Hnaging & Form Work).............$ 39.58 17.77

CARP0002-006 05/01/2019

JEFFERSON & LINCOLN COUNTIES

Rates Fringes

CARPENTER (Including Drywall Hanging & Form Work) Projects $1 million and over........................$ 39.58 17.77 Projects under $1 million...$ 33.76 17.10

CARP0012-001 05/01/2019

CRAWFORD COUNTY

Rates Fringes

CARPENTER (Including Drywall Hanging & Form Work).............$ 38.90 17.67

CARP0013-001 05/01/2019

WASHINGTON COUNTY

Rates Fringes

CARPENTER (Including Drywall Hanging & Form Work) Projects $1 million and over........................$ 39.58 17.77 Projects under $1 million...$ 33.51 17.10

CARP1310-001 05/01/2019

CARPENTER (Floor

Laying-Carpet and Vinyl Only)....$ 34.21 17.17

ELEC0001-006 06/03/2018

JEFFERSON, LINCOLN, ST LOUIS & WASHINGTON COUNTIES

Rates Fringes

ELECTRICIAN (Including Low Voltage Wiring Installer;

Alarm, Computer & Telephone Installation)....................$ 38.12 15.60

ELEC0257-002 03/01/2019

CRAWFORD COUNTY

Rates Fringes

ELECTRICIAN (Including Low Voltage Wiring Installer;

Alarm, Computer & Telephone Installation)....................$ 33.25 18.18

* ELEV0003-001 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 51.73 34.765+a+b

a. VACATION: Employer contributes 8% of basic hourly rate as vacation pay credit for more than 5 years of service; and 6% for 6 months to 5 years of service.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the Friday after Thanksgiving Day and Christmas Day.

ENGI0513-005 05/01/2019

CRAWFORD & WASHINGTON COUNTIES

Rates Fringes

Power equipment operators:

Backhoe/Excavator...........$ 30.31 27.29 Bobcat/Skid Loader..........$ 30.31 27.29 Crane.......................$ 30.31 27.29 Forklift....................$ 30.31 27.29 Grader/Blade................$ 30.31 27.29 Loader......................$ 30.31 27.29 Paver.......................$ 30.31 27.29 Roller......................$ 30.31 27.29

ENGI0513-008 05/01/2019

JEFFERSON, LINCOLN & ST LOUIS COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR:

Backhoe/Excavator...........$ 34.36 27.36 Bobcat/Skid Loader..........$ 34.36 27.36 Crane.......................$ 34.36 27.36 Forklift....................$ 34.36 27.36 Grader/Blade................$ 34.36 27.36 Loader......................$ 34.36 27.36 Paver.......................$ 34.36 27.36 Roller......................$ 34.36 27.36

IRON0396-002 08/07/2019

JEFFERSON, LINCOLN, ST. LOUIS, and WASHINGTON COUNTIES

Rates Fringes

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 34.91 27.36

IRON0396-007 08/07/2019

CRAWFORD COUNTY

Rates Fringes

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 30.44 27.36

LABO0042-002 03/06/2019

ST LOUIS COUNTY

Rates Fringes

LABORER

Brick & Cement/Concrete Mason Tender................$ 32.81 15.67 Common or General; Asphalt Shoveler; Brick & Cement/Concrete Mason Tender; Pipelayer...........$ 33.22 15.67

LABO0110-001 03/01/2019

JEFFERSON COUNTY

LABORER

PROJECTS $1 MILLION AND

OVER:

Brick & Cement/Concrete Mason Tender...............$ 27.36 13.12 Common or General;

Asphalt Shoveler;

Pipelayer..................$ 28.81 13.72

PROJECTS UNDER $1 MILLION:

Brick & Cement/Concrete Mason Tender...............$ 25.21 13.12 Common or General;

Asphalt Shoveler;

Pipelayer..................$ 26.66 13.72

LABO0110-003 03/01/2019

WASHINGTON COUNTY

Rates Fringes

LABORER

PROJECTS $20 AND OVER:

Brick & Cement/Concrete Mason Tender...............$ 27.36 13.12 Common or General;

Asphalt Shoveler;

Pipelayer..................$ 28.81 13.72

PROJECTS BETWEEN $1

MILLION & $20 MILLION:

Brick & Cement/Concrete Mason Tender...............$ 25.86 13.12 Common or General;

Asphalt Shoveler;

Pipelayer..................$ 27.31 13.72

PROJECTS UNDER $1 MILLION

Brick & Cement/Concrete Mason Tender...............$ 23.86 13.12 Common or General;

Asphalt Shoveler;

Pipelayer..................$ 25.31 13.72

LABO0660-002 03/06/2019

LINCOLN COUNTY

Rates Fringes

LABORER

Common or General; Asphalt Shoveler, Brick & Cement/Concrete Mason Tender; Pipelayer...........$ 33.53 14.12

LABO0840-006 03/01/2019

CRAWFORD COUNTY

LABORER

Brick & Cement/Concrete Mason Tender................$ 27.86 13.39 Common or General; Asphalt Shoveler; Pipelayer.........$ 25.96 13.39

PAIN0002-007 09/01/2017

JEFFERSON, LINCOLN & ST LOUIS COUNTIES

Rates Fringes

PAINTER

Brush & Roller..............$ 32.34 15.32 Drywall Finishing/Taping....$ 32.34 15.32

PAIN0513-001 01/01/2016

CRAWFORD COUNTY

Rates Fringes

GLAZIER..........................$ 33.40 23.55

PAIN0513-007 01/01/2016

JEFFERSON, LINCOLN, ST. LOUIS & WASHINGTON COUNTIES

Rates Fringes

GLAZIER..........................$ 33.40 23.55

PAIN1265-004 07/01/2013

CRAWFORD COUNTY

Rates Fringes

PAINTER

Brush and Roller............$ 25.64 13.27 Drywall Finishing/Taping....$ 26.64 13.27

PAIN1292-004 09/01/2017

WASHINGTON COUNTY

Rates Fringes

PAINTER

Brush & Roller..............$ 25.70 12.74 Drywall Finishing/Taping....$ 25.95 12.74

PLAS0527-007 04/01/2019

JEFFERSON & ST LOUIS COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 33.60 18.92

PLAS0527-008 04/01/2019

LINCOLN & WASHINGTON COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

Projects $10 million and over........................$ 32.39 18.92 Projects less than $10 million.....................$ 31.69 18.92

PLAS0527-009 04/01/2019

CRAWFORD COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 33.56 18.92

PLUM0562-006 07/01/2019

JEFFERSON & ST LOUIS COUNTIES

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation................$ 41.85 27.83 PLUMBER, Excludes HVAC Pipe Installation.....................$ 41.85 27.83

PLUM0562-008 07/01/2019

CRAWFORD, LINCOLN & WASHINGTON COUNTIES

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 40.41 21.49 Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 41.85 27.85 PLUMBER, Excludes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 40.41 21.49 Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 41.85 27.85

ROOF0002-001 03/01/2019

Rates Fringes

ROOFER...........................$ 33.30 18.41

* SFMO0268-003 01/01/2020

JEFFERSON & ST LOUIS COUNTIES

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 45.21 24.62

SFMO0669-004 04/01/2019

CRAWFORD, LINCOLN & WASHINGTON COUNTIES

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 36.81 22.22

SHEE0036-001 08/01/2018

Rates Fringes

SHEET METAL WORKER, Includes HVAC Duct and Unit Installation.....................$ 42.65 22.72

TEAM0682-004 04/01/2019

JEFFERSON, LINCOLN & ST LOUIS COUNTIES

Rates Fringes

TRUCK DRIVER, Includes Dump Truck............................$ 21.30 a+b a.PAID HOLIDAYS: Christmas, Fourth of July, Labor Day, Memorial Day, New Years Day and Thanksgiving Day.

b.PAID VACATION: 1 week paid vacation after 2 years continuous service; 2 weeks paid vacation after 5 years continuous service; 3 weeks paid vacation after 10 years continuous service.

SUMO2010-055 06/14/2010

Rates Fringes

OPERATOR: Hoist.................$ 26.02 13.01

PAINTER: Spray..................$ 17.78 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)

File details come from the government source that posted it. Updated .