Bldg 42 Demo Environmental Key Talking Points.docx

DOCX document 14 KB Posted

Attached to
Jefferson Barracks, Demolish Building 42 Federal contract opportunity
Solicitation number
W50S8K-20-B-0001
Issued by
Department of the Army Missouri Army National Guard

About this file

This document contains a federal contract opportunity and related environmental file. The solicitation is for demolition of Building 42 at Jefferson Barracks in St. Louis, Missouri. The Missouri Air National Guard's 131st Bomb Wing is seeking a firm-fixed price contract to demolish the approximately 11,000 square foot masonry building. The magnitude of the project is between $250,000 and $500,000. Salvage of materials from the building is required so they can be reused to repair other historic buildings on base. The environmental file outlines requirements for hazardous waste manifests, abatement of asbestos and lead materials, use of clean fill from an approved source, and salvage of interior bricks. Proper handling and disposal of hazardous materials must follow State of Missouri and OSHA regulations.

View the file

Other files for this federal contract opportunity

Other files attached to Jefferson Barracks, Demolish Building 42, newest first.
File Type Posted
Abstract of Bids.pdf PDF
Updated Lead Report for Building 42 (March 2020).pdf PDF
Building 42 Asbestos Report Recertification.pdf PDF
Building 42 Asbestos Report.pdf PDF
W50S8K20B00010002 Amendment 2.pdf PDF
Attach 1 - WD (Updated).pdf PDF
W50S8K20B00010001 Amendment 1.pdf PDF
Bldg 42 Lead Report.pdf PDF
Attach 2 - SOW (Updated).pdf PDF
Bldg 42 Pre-Bid QA.xlsx XLSX spreadsheet
Bldg 42 Demolition Plans.pdf PDF
Site-Visit Sign In Sheet.pdf PDF
Attach 3 - EAL.docx DOCX document
Attach 1 - Wage Determination.pdf PDF
Attach 2 - SOW.pdf PDF
W50S8K20B0001 Demolish Building 42.pdf PDF
Attach 4 - Bid Bonds Checklist.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jefferson Barracks ANGB, St. Louis, Missouri Building 42 Demolition

Key Points From The Environmental & Cultural Resources Perspective

· Proper salvage of materials is very important.

· Hazardous waste manifests MUST be signed by either John Morrissey or Rachel Jackson prior to waste being shipped off the installation. No one else, including contractor personnel, is authorized to sign waste manifests for 131 Bomb Wing.

· Abatement / disposal of asbestos-containing materials, materials painted with lead-based paint, expended lead rounds, and/or ballistics must be accomplished in accordance with State of Missouri and OSHA regulations.

Not Specified in the SOW, But Required by the State Historic Preservation Office

· Clean fill from a State Historic Preservation Office (SHPO)-approved source must be used. Recommend contractor submit multiple options for approval as past experience has shown that not all sources will be approved, or have adequate fill available.

Not Specified in the SOW, But Allowable

· Any interior bricks that can easily be salvaged (for example, ones that have little to no mortar on them) can also be salvaged. Palletize and mark the bricks as “interior bricks” and keep them separate from the exterior bricks.

File details come from the government source that posted it. Updated .