Questions and Answers Document 3 W5S08G‐21‐B‐0001

26 February 2021

Q1. Can you please provide more information on the existing ATS? Can you provide information from the ATS manufacture plate to include the Make, model number, and serial number?

Are you able to take a photo of that plate and/or supply that information to us?

A1.yes photos are below:

-- End of Questions and Answers Document 1 --

26 February 2021

Q2. What is the reason for Power of Attorney requirement?

A2. To fulfil the requirements of Federal Acquisition Regulations (FAR) part 28.101-3 for bid bonds.

Q3. Is there required form for the Power of Attorney?

A3. There is not a required form for the power of attorney.

-- End of Questions and Answers Document 2 –

Q4. What size day tank is needed (24 hour or 48 hour) A4. 48 Hour Day Tank.

Q5. Can the gravel between the building and the sidewalk be removed and then placed back on top of the landscaping fabric or is new gravel preferred?

A5. Utilize existing gravel.

Q6. Are the two 4” comm/telephone conduits incased in concrete? If so, is the depth known of the pipes or the concrete?

A6. Utilize spot locates to determine the location. The contractor is responsible for any pot holing/ digging to locate the depth of the existing utility lines. (See attached drawing named “TIF Communications Site-As-Built”) labeled as Questions and Answers 3 Attachment 1 in the beta.sam.gov solicitation website.

Q7. Does the junction box on the exterior wall feed to the gutter/junction box above the ATS? If so, is the conduit size between the two boxes known?

A7. Yes existing conduit from ATS to exterior box on wall. Conduit size unknown.

Q8. Is it possible to get equipment and or concrete trucks to the back of building 1044?

A8. Yes, they will have to be escorted by fight line authorized personnel. Contractor responsible for any damage incurred to landscaping during construction.

Q9. Does the Generator require an air quality cert?

A9. Yes, this documentation shall be provided to the Gov. Project Manager after commissioning of the generator.

-- End of Questions and Answers Document 3 --