Pre-Bid Site Visit Questions and Answers Document.pdf

PDF 76 KB Posted

Attached to
Install Backup Generator for Building 1044 at Kirtland Air Force Base
Solicitation number
W50S8G21B0001
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W508G-21-Q-0001

Pre-Bid Conference and Site Visit Questions and Answers Document

18 February 2021

Q1. What size do you want the generator to be?

A1. Refer to Scope of work Paragraph 7/A/1

Q2. Do you have drawings to support sizing the generator?

A2. Drawings have been posted to the Contracts Opportunities solicitation website, please refer to the document titled “Additional Drawings I”

Q3. What size is the panel for the Automatic Transfer Switch (ATS), what year was it manufactured?

A3. Refer to drawings provided and field verification during site visit.

Q5. Where do you want the fuel tank to be installed? How much run time do you want from the tank?

A5. Underneath the generator on the concrete containment pad. Generator to run for 48 hours.

Q6. What kind of fuel do you want the generator to run?

A6. Diesel

Q8. Will a bypass to isolate the generator be required?

A8. If there is not an existing one there then yes it will be required.

Q9. Will the picnic tables need to be removed by the contractors?

A9. No the Government will remove the picnic tables.

Q10. Are there any electrical or utilities lines near the routing of the electrical lines from the generator to the ATS? Are there any as built drawings for this information?

A10. Most of the utility lines are on the west side of the building. There is a communication line running through the dig area. Refer to the drawings for verification. Also after contract is awarded the contractor shalll submit a dig permit to main base and they will field verify any lines in that area.

Q12. Will the contractor have a laydown area?

A12. Yes on the North end of the building.

Q13 Bonding/grounding new generator.

A13 Ground generator and tie into existing counterpoise/building ground.

-- End Pre-Bid Conference and Site Visit Questions and Answers --