Questions Asked and Answered - as of 4-23-2020.docx
DOCX document 13 KB Posted
- Attached to
- BUILDING 107 REMODEL AND FITNESS CENTER
- Solicitation number
- W50S8D-20-R-0002
- Issued by
-
Department of the Army National Guard
About this file
This document summarizes a solicitation for building renovation and fitness center construction services. The 105th Airlift Wing of the New York Air National Guard is seeking a firm fixed-price contract to convert approximately 5,800 square feet of garage space at Building 107 in Newburgh, New York into a new fitness center. Scope of work includes walls, doors, flooring, finishes, HVAC, fire alarm and other building systems. The pre-proposal conference will be held via online video on April 29th, with questions due by May 6th and quotes due May 19th. The contract period is 45 days after notice to proceed. The North American Industry Classification code is 236220 and the size standard is $33.5 million. This opportunity is set aside exclusively for small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - 1.pdf | ||
| Amendment 3 - 1.4.1.79 - Heating-Cooling System.docx | DOCX document | |
| Final Questions and Answers - 5-13-20.docx | DOCX document | |
| As Built - 5.pdf | ||
| As Built - 2.pdf | ||
| As Built - 4.pdf | ||
| As Built - 1.pdf | ||
| As Built - 3.pdf | ||
| List of Gym Equipment - NO pricing on the equipment.docx | DOCX document | |
| Online Site Visit - 4-29-20 - Attendance List.xlsx | XLSX spreadsheet | |
| Amendment 1 - Modification to Section 00100 - page 36 (1).docx | DOCX document | |
| Amendment 2 - Modification to Section 1.5.2 in PWS within Solicitation.docx | DOCX document | |
| Modification to Section 00100 - page 36.docx | DOCX document | |
| Modification to 1.5.2 in PWS within Solicitation.docx | DOCX document | |
| Drawing - Attachment 6.pdf | ||
| Solicitation - Bldg 107 Remodel and Fitness Center.pdf | ||
| Drawing - Attachment 4.pdf | ||
| Drawing - Attachment 3.pdf | ||
| Drawing - Attachment 5.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Asked and Answered As of 4/23/2020 Q1. For the design requirements, will you require stamped plans by a licensed architect/engineer?
Answer: No, stamped plans are not required.
Q2. Have you selected a Fitness Equipment manufacturer, and if so, can you confirm who?
Answer: No, we have not selected a Fitness Equipment manufacturer.
Q3. Is the period 45 days (per SF 1442) or 120 days (per Performance Work Statement)?
Answer: The performance period is 45 days. The PWS will be corrected.
Q4. Please also clarify what should be included in the proposal beyond price for evaluation. How are you expecting our proposal to demonstrate that it meets or exceeds the PWS requirements?
Answer: Evaluation will be made on a lump sum basis. Modification notice will be posted to Contract Opportunities.