Amendment 2 - Modification to Section 1.5.2 in PWS within Solicitation.docx
DOCX document 11 KB Posted
- Attached to
- BUILDING 107 REMODEL AND FITNESS CENTER
- Solicitation number
- W50S8D-20-R-0002
- Issued by
-
Department of the Army National Guard
About this file
This solicitation is for building renovation and fitness center construction services for the 105th Airlift Wing of the New York Air National Guard located in Newburgh, NY. The project involves utilizing approximately 5,800 square feet of current garage space to create a new fitness center, including erecting 10-foot walls to separate it from the remaining garage area. Additional work comprises doors, flooring, finishes, heating, cooling, fire alarms and other items. The period of performance is 45 calendar days from notice to proceed. The pre-proposal conference will be a live online video on April 29th, with questions due by May 6th and quotes due by May 19th. The contract is set aside exclusively for small businesses and has a magnitude between $100,000 and $250,000. The North American Industry Classification code is 236220 and the size standard is $33.5 million. Wage determination NY20200007 applies. Interested parties must register in the System for Award Management to receive solicitation documents from the Contract Opportunities website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - 1.pdf | ||
| Amendment 3 - 1.4.1.79 - Heating-Cooling System.docx | DOCX document | |
| Final Questions and Answers - 5-13-20.docx | DOCX document | |
| As Built - 5.pdf | ||
| As Built - 2.pdf | ||
| As Built - 4.pdf | ||
| As Built - 1.pdf | ||
| As Built - 3.pdf | ||
| List of Gym Equipment - NO pricing on the equipment.docx | DOCX document | |
| Online Site Visit - 4-29-20 - Attendance List.xlsx | XLSX spreadsheet | |
| Amendment 1 - Modification to Section 00100 - page 36 (1).docx | DOCX document | |
| Modification to Section 00100 - page 36.docx | DOCX document | |
| Modification to 1.5.2 in PWS within Solicitation.docx | DOCX document | |
| Questions Asked and Answered - as of 4-23-2020.docx | DOCX document | |
| Drawing - Attachment 6.pdf | ||
| Solicitation - Bldg 107 Remodel and Fitness Center.pdf | ||
| Drawing - Attachment 4.pdf | ||
| Drawing - Attachment 3.pdf | ||
| Drawing - Attachment 5.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.5.2. Period of Performance: The period of performance shall be for the duration of the time it takes to survey, design and renovate the project area as described in detail in Part 5 herein but not to exceed 45 calendar days.
File details come from the government source that posted it. Updated .