Amendment 3 - 1.4.1.79 - Heating-Cooling System.docx

DOCX document 12 KB Posted

Attached to
BUILDING 107 REMODEL AND FITNESS CENTER
Solicitation number
W50S8D-20-R-0002
Issued by

About this file

This solicitation seeks proposals for a building remodel and fitness center project. The 105th Airlift Wing of the New York Air National Guard located in Newburgh, NY is soliciting a firm fixed-price contract to provide all labor, materials, equipment and supervision necessary to utilize and convert approximately 5,800 square feet of an existing garage space into a new fitness center with ten-foot-high wall separations and an open ceiling to the remaining garage area. The project also includes doors, flooring, finishes, heating and cooling, fire alarm devices and other requirements. Interested small businesses must be registered in SAM and submit quotes by May 19, 2020 for the project, which is set aside 100% for small businesses and has an estimated value between $100,000 and $250,000. The contract duration is 45 days after notice to proceed.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reference 1.4.1.79 – Newly installed HVAC system does NOT have to be a single heat pump system. The system shall be designed and installed in accordance with all governing codes and shall be sufficient to heat and cool entire garage to include areas beyond the new fitness center. Infrared heaters can remain if they are tied into the new HVAC controls. The system/method chosen by the winning contractor shall be submitted and approved by the contracting officer.