Amendment 3 - 1.4.1.79 - Heating-Cooling System.docx
DOCX document 12 KB Posted
- Attached to
- BUILDING 107 REMODEL AND FITNESS CENTER
- Solicitation number
- W50S8D-20-R-0002
- Issued by
-
Department of the Army National Guard
About this file
This solicitation seeks proposals for a building remodel and fitness center project. The 105th Airlift Wing of the New York Air National Guard located in Newburgh, NY is soliciting a firm fixed-price contract to provide all labor, materials, equipment and supervision necessary to utilize and convert approximately 5,800 square feet of an existing garage space into a new fitness center with ten-foot-high wall separations and an open ceiling to the remaining garage area. The project also includes doors, flooring, finishes, heating and cooling, fire alarm devices and other requirements. Interested small businesses must be registered in SAM and submit quotes by May 19, 2020 for the project, which is set aside 100% for small businesses and has an estimated value between $100,000 and $250,000. The contract duration is 45 days after notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - 1.pdf | ||
| Final Questions and Answers - 5-13-20.docx | DOCX document | |
| As Built - 5.pdf | ||
| As Built - 2.pdf | ||
| As Built - 4.pdf | ||
| As Built - 1.pdf | ||
| As Built - 3.pdf | ||
| List of Gym Equipment - NO pricing on the equipment.docx | DOCX document | |
| Online Site Visit - 4-29-20 - Attendance List.xlsx | XLSX spreadsheet | |
| Amendment 1 - Modification to Section 00100 - page 36 (1).docx | DOCX document | |
| Amendment 2 - Modification to Section 1.5.2 in PWS within Solicitation.docx | DOCX document | |
| Modification to Section 00100 - page 36.docx | DOCX document | |
| Modification to 1.5.2 in PWS within Solicitation.docx | DOCX document | |
| Questions Asked and Answered - as of 4-23-2020.docx | DOCX document | |
| Drawing - Attachment 6.pdf | ||
| Solicitation - Bldg 107 Remodel and Fitness Center.pdf | ||
| Drawing - Attachment 4.pdf | ||
| Drawing - Attachment 3.pdf | ||
| Drawing - Attachment 5.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference 1.4.1.79 – Newly installed HVAC system does NOT have to be a single heat pump system. The system shall be designed and installed in accordance with all governing codes and shall be sufficient to heat and cool entire garage to include areas beyond the new fitness center. Infrared heaters can remain if they are tied into the new HVAC controls. The system/method chosen by the winning contractor shall be submitted and approved by the contracting officer.
File details come from the government source that posted it. Updated .