RFI_Mezzanine structural repairs photos.pdf

PDF 3 MB Posted

Attached to
B254 Mezzanine Repair at Pease ANGB
Solicitation number
W50S8A26QA008
Issued by

About this file

This document is a site specification and reference guide for a mezzanine reinforcement project. The work involves installing three structural beams against the slab in a mezzanine area to provide additional support. The beams will be positioned approximately 12 to 15 inches above existing conduit, which will not interfere with the installation. Prior to work commencement, the government will clear all equipment from the area under the mezzanine. The contractor will have access via an adjacent roll-up door and is authorized to store materials and equipment under the mezzanine during business hours only, with after-hours access prohibited.

The document provides photographic reference materials showing the exact mezzanine location requiring reinforcement, the approximate positions of the three beams on the slab, critical penetration points and conduit locations to avoid during installation, and the equipment room on the mezzanine level. Multiple angles and close-up views are included to identify specific penetration locations marked with orange arrows that contractors should reference when planning installation methodology. The specifications emphasize the importance of verifying clearances around existing mechanical, electrical, and plumbing systems before commencing work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mezzanine area to be reinforced:

- Area under mezzanine will be cleared of all govt equipment prior to work starting

- Contractor will be able to use adjacent roll-up door for access

- Contractor can store materials and equipment under mezzanine for the duration of the work (after-hours access will not be authorized)

Approximate location of 3 beams:

- The beams will sit against the slab (these are just lines drawn onto a photo)

- Although not clearly illustrated, the conduit is approximately 12 to 15 inches below where the new beams will be installed and will not interfere.

- Note penetrations for reference in other photos

Additional under-slab photos

- Note 2 penetration locations for reference in other photos

Equipment room in mezzanine

- Note penetration location for reference

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4