This document set contains architectural and engineering drawings for plumbing modifications at the KC-46A ADAL Maintenance Hangar (Building 254) located at Pease Air National Guard Base, New Hampshire. The project is being executed by TerraTech and includes detailed mechanical and plumbing plans for the mezzanine level.

The primary scope includes installation of new plumbing fixtures and systems within the mechanical mezzanine and existing restroom areas. Key work items encompass replacement of lavatories with new fixtures while retaining existing sinks and refinishing walls; replacement of shower heads and valves while maintaining the existing shower pan; installation of new compressed air piping (various diameters of CA lines); routing of chilled water (CW) piping at 100 PSI; installation of sanitary sewer piping with field location of existing services and tie-in to existing sanitary infrastructure; condensate drainage routed to floor drains; and gas (G) and stainless steel (SS) piping installations. The drawings specify equipment locations including PWP-1 (positioned over an existing C6 channel beam near grid line E'), hydro-pneumatic tanks, and various support infrastructure. Construction requirements include steel fabrication using A36 electrodes, paint preparation to match existing conditions, and proper removal of paint at weld areas prior to welding. The calculation sheet dated 10/13/2022 provides detailed layout specifications for support systems under the slab at PWP-1 and tank locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

steven.ford Highlight steven.ford Highlight

D'

E'

12' 14'13'

3"ø G

2"ø CW

1/

4" ø

C W

1 1/4"ø CA

1/

4" ø

C W

B-2

B-1

2 1/2"ø CA

1"ø CW @ 100 PSI

2"ø CW 2"ø CW @ 100 PSI

2" ø

C W

P

S I

AC-1

PWP-1

MECHANICAL

42C

2 1/2"ø CA

1/

2" ø

C A

1/

2" ø

C A

3" ø

G

3" ø

S S

3"ø SS 3"ø SS 3"ø SS

3"ø SS

FD2

FD2

FD2 4" VTR

CONTRACTOR TO ROUTE DOWN WALL WITHIN ROOM

HEF 43B TO BELOW SLAB. CONTRACTOR SHALL FIELD

LOCATE EXISTING SANITARY WITHIN ROOM HEF 43B AND

TIE NEW 3" SANITARY INTO EXISTING SERVICE.

1/2" CONDENSATE ROUTED

DOWN WALL TO TERMINATE AT

FLOOR DRAIN (FD2)

1/ 2" ø C

O N

D

EN

S

AT

E

SANITARY SEWER

PIPING ROUTED BELOW

MEZZANINE FLOOR

(TYP.)

2 1/2"ø CA

CLEARANCE INDICATED

BY HATCHED LINES

LOCATE PWP-1 OVER

EXISTING C6 CHANNEL

BEAM AND AS CLOSE TO

GRID LINE E' AS POSSIBLE7' - 6"

EXISTING C6 CHANNEL

BEAM BELOW

D'

E'

5'3' 4'

P2

P2

P4

P4

P4

P4

P6

P6

P3

P3

P3

2 1/2"ø CA 2 1/2"ø CA

1/

2" ø

C A

2" ø

C W

1/

2" ø

G

2"ø CW2"ø CW

4"ø G @ 2 PSI

4"ø G @ 5 PSI

1/

2" ø

C A

2 1/2"ø CA

5 PSI TO 2 PSI

REGULATOR

RESTROOM

LOCKER

ALCOVE

202JANITOR

CORRIDOR

200A

3"ø G

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ Pe as e

AF

B

H an ga rs

\D ra w in gs \A ut oC

AD

R ef er en ce

SZ

C Q

-G

-B

SA

R C

1.

dw g gu ec ke r

AS SHOWN

Stamp

P-402

ENLARGED PLUMBING FLOOR PLANS

9 APRIL 2015

JWM

JWM

DSB

DSB

SZCQ139904

KC-46A ADAL MAINTENANCE HANGAR, BUILDING 254

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/4" = 1'-0"

MECHANICAL MEZZANINE PLUMBING FLOOR PLAN2

0' 1' 2' 4' 8'TRUE

NORTH

PLAN

NORTH

SCALE: 1/4" = 1'-0"

EXISTING MEZZANINE RESTROOM FLOOR PLAN1

0' 1' 2' 4' 8'TRUE

NORTH

PLAN

NORTH

KEY NOTES:

NEW FIXTURE TO REPLACE EXISTING. CONTRACTOR

TO RECONNECT TO EXISTING PIPING AND REFINISH

WALLS AS REQUIRED.

LAVATORIES SINKS TO REMAIN. ONLY FAUCETS TO BE

REPLACED. CONTRACTOR TO REFINISH WALLS AS

REQUIRED.

SHOWER PAN TO REMAIN. ONLY SHOWER HEAD AND

VALVE TO BE REPLACED. CONTRACTOR TO REFINISH

WALLS AS REQUIRED.

1 COMPRESSOR LOCATION UPDATE 5/31/2019

MEZZANINE EQUIPMENT ADJUSTMENT2 6/21/2019

steven.ford Highlight steven.ford Highlight steven.ford Highlight steven.ford Highlight

File details come from the government source that posted it. Updated .