Pre Bid slides.ppt

PPT presentation 2 MB Posted

Attached to
Replace HVAC Equipment/Systems Federal contract opportunity
Solicitation number
W50S87-21-B-5002
Issued by
Department of the Army North Carolina Army National Guard

About this file

This presentation slide deck and related federal contract opportunity notice provide details for a replacement of HVAC equipment and systems project. The Army National Guard is seeking a fixed price bid to replace all HVAC equipment dependent on R-22 refrigerant across its North Carolina facilities. Bids are due on May 20th, with an award projected for July 21st. The 180-day period of performance will begin after notice to proceed. The small business set-aside solicitation seeks pricing for HVAC replacement and expansion of the controls and smart metering system. Offerors must attend the April 29th pre-bid conference and site visit, and direct any questions to the contracting officer by May 11th. Responsiveness will be determined in accordance with FAR Part 9 after public bid opening on the scheduled date.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

29 April 2021 Pre-Bid Conference/Site Visit

Solicitation Number W50S87-21-B-5002

Replace HVAC Equipment/Systems

Agenda

Introduction
Administrative Items
Process for Questions and Answers
Project Overview
Solicitation, Plans, Specifications and Amendments
Invitation for Bid Basics and Bid Requirements
Questions
Site Visit to follow conference

Introduction 1st Lt Zachary Leddy – Contracting Officer

Mr. Hanson Pedersen – Contracting Officer’s Representative (COR)

Administrative items- Attendance Roster Ensure you sign in on the attendance roster

We will post this roster to www.beta.sam.gov in order to facilitate communication between potential subs and prime contractors

A site visit will follow this presentation

Any questions you have during the site visit should be sent in writing for an official response in accordance with the solicitation.

Submit questions to 1st Lt Zachary Leddy. See Section 00100 for instructions.

Questions and official answers will be posted on www.beta.sam.gov on a non-attribution basis with solicitation information.

Submit questions NLT 7 business days prior to bid opening. Do not contact the A/E or any Gov engineering personnel directly.

Amendments will be only issued only if there is a change in the solicitation, specifications, or plans

Process for Questions and Answers

Project Overview

This project includes but is not limited to the replacement of all existing HVAC equipment dependent upon R-22 Freon base wide. Equipment to be replaced includes chillers, split systems, and package systems.

The existing smart meters and reporting system will be expanded to include 23 electrical and natural gas smart meters for the designated buildings.

Brand Name Items:

Alerton: Direct Digital Control (DDC)

Project Overview

A Firm Fixed Price (FFP) contract will be awarded
Invitation for Bid Procedures (FAR Part 14)
Small Business Set-Aside
NAICS: 238220
Period of Performance: 180 calendar days after Notice to Proceed (NTP) is issued
NTP will be issued after approval of Performance and Payment Bonds and all required pre-construction submittals
Contract Line Item Numbers (CLINs): Two (2) base CLINs

Project Overview- Bid Schedule Base:

CLIN 0001, FFP

Base Bid: Replace HVAC Equipment/Systems QUANTITY: 1 UNIT: Job Sustainment funds. HVAC work. Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to replace HVAC equipment/systems in accordance with specs and drawings dated February 2020 and Statement of Work dated 16 March 2020.

CLIN 0002, FFP

Base Bid: Replace HVAC Equipment/Systems QUANTITY: 1 UNIT: Job Repair funds. Controls and smart meter work. Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to replace HVAC equipment/systems in accordance with specs and drawings dated February 2020 and Statement of Work dated 16 March 2020.

Project Overview- Schedule Synopsis: 6 Mar 2021

Solicitation Posted: 20 Apr 2021

Pre-Bid Conference/Site Visit: 29 April 2021

Bid Opening Date/Time: 20 May 2021, 3:00PM EST
Bid opening held in Charlotte

Deadline to submit questions: 11 May 2021

Projected award date: 21 Jul 2021

Solicitation, Plans, Specifications and Amendments The plans and specs have been posted to www.beta.sam.gov.

The Government is not liable for information furnished by any other source.

Amendments (SF30) will be posted to www.beta.sam.gov. It is the offerors responsibility to check the website periodically for any amendments to the solicitation.

Bid Requirements

What you must submit (see Section 00010)

SF 1442, (Blocks 14-20c)
Do not enter less than 90 days in Block 17
Section 00010, Bid Schedule- all items must be priced
IAW Clause 252.236-7008, Contract Prices- Bidding Schedules. The prices shown in the Bidding Schedule must reflect ALL costs involved in performing the work, as described in the plans and specifications.
Section 00600, Reps and Certs
In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov. Be sure to complete the fill-ins at provisions 52.204-24, 52.204-26, 252.204-7016, and 252.204-7017.
Acknowledge all Amendments (SF 30)
Bid Bond/Guarantee, 20% (Standard Form 24)
Power of Attorney
The bid opening will occur at the time and date specified in Block 13 of the SF1442 at 4930 Minuteman Way, Charlotte, NC 28208 (map included in solicitation attachments).
Hand Carried Bids- must be deposited in the repository prior to the time established for opening of bids.
Mailed bids- must be received at the location specified in block 7 of the SF1442 prior to the time established for opening of bids.
Repository and Mailing Address: 4930 Minuteman Way, Charlotte, NC 28208. Attention: Contracting Office, 1st Lt Zachary Leddy
Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and in accordance with clause 52.214-7.

Bid Requirements- Bid Submission

Invitation for Bids Procedures What to expect at the Bid Opening Bid opening officer (BOO) will announce exact time bids are due and that no more bids will be accepted

Bids are opened and read out loud with no discussion or comment on responsiveness (FAR 14.301) of bids, and recorded

BOO opens Government estimate, records

Abstract will be certified and posted to www.beta.sam.gov as soon as practical.

Invitation for Bids Procedures Determination of Responsibility IMPORTANT: Refer to the solicitation and FAR Part 9 for details A bidder is determined to be responsible in accordance with FAR 9.104

After bids are publicly opened, an award will be made with reasonable promptness to that responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

To establish its responsibility, the apparent low bidder will be requested by the Government prior to award, to submit a statement/documents regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work.

File details come from the government source that posted it. Updated .