Solicitation Attachment 2 - Drawings HVAC Stanly County.pdf
PDF 6 MB Posted
- Attached to
- Replace HVAC Equipment/Systems Federal contract opportunity
- Solicitation number
- W50S87-21-B-5002
About this file
This document is a solicitation for replacing HVAC equipment and systems at various facilities of the North Carolina Army National Guard. The solicitation calls for replacing aging HVAC units, ductwork, controls and associated components at multiple buildings base-wide. Bids are due by May 20, 2021 with work to commence in July 2021. The pre-bid conference will be held on April 29, 2021 for interested contractors to review project scope and site conditions. The Army National Guard is seeking energy efficient equipment that meets Unified Facilities Criteria. The contract will have a one year base period and one option year.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C :\r vt \2
8\
-0 0-
M P
_d er ek .w or le y.
rv t
2/
/2
3:
:3
P
M
INDEX OF DRAWINGS
SHEET # DESCRIPTION
00M001 GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
01MD101 BUILDING 01 - FIRST FLOOR MECHANICAL DEMOLITION PLAN
01MD102 BUILDING 01 - ROOF MECHANICAL DEMOLITION PLAN
01M101 BUILDING 01 - FIRST FLOOR MECHANICAL PLAN
01M102 BUILDING 01 - ROOF MECHANICAL PLAN
03M101 BUILDING 03 - MECHANICAL PLAN
04M101 BUILDING 04 - MECHANICAL PLANS
06M101 BUILDING 06 - MECHANICAL PLAN
08MD101 BUILDING 08 - MECHANICAL DEMOLITION PLANS
08M101 BUILDING 08 - MECHANICAL PLANS
12MD101 BUILDING 12 - ROOF MECHANICAL DEMOLITION PLAN
12M101 BUILDING 12 - MECHANICAL PLANS
16M101 BUILDING 16 - MECHANICAL PLANS
30M101 BUILDING 30 - MECHANICAL PLANS
50M101 BUILDING 50 - MECHANICAL PLAN
51M101 BUILDING 51 - MECHANICAL PLAN
54M101 BUILDING 54 - MECHANICAL PLANS
60MD101 BUILDING 60 - MECHANICAL DEMOLITION PLANS
60M101 BUILDING 60 - MECHANICAL PLANS
75M101 BUILDING 75 - MECHANICAL PLANS
77M101 BUILDING 77 - MECHANICAL PLAN
81M101 BUILDING 81 - MECHANICAL PLAN
TCM101 TROOP CAMP - NEW WORK PLAN
99M001 MECHANICAL SCHEDULES
99M002 MECHANICAL SCHEDULES
99M003 MECHANICAL DETAILS
99M004 MECHANICAL DETAILS
PROJECT
LOCATION
NEW LONDON
NORTH CAROLINA
AIR NATIONAL GUARD
REPLACE HVAC SYSTEMS BASE WIDE
145th AIRLIFT WING
NEW LONDON, NC
CONTRACT NO.: W9133L-15-D-0004
TASK ORDER NO.: W91242-18-F-0130
PN: WEFM142600
B-3 DESIGN SUBMISSION
FEBRUARY 2020
BLDG 12
BLDG 30
BLDG 01
BLDG 03
BLDG 04
BLDG 06
BLDG 08
BLDG 16
DIFFUSER, GRILLE OR
REGISTER DESIGNATION TAG
AIR FLOW SCHEMATIC AND
TEMPERATURE CONTROL
DIAGRAM SYMBOLOGY
HVAC SYMBOLOGY PIPING SPECIALTIES
GENERAL NOTES
PIPING
PIPING FITTINGS
ABBREVIATIONS
SCHEMATIC SYMBOLS
SA12ø-250
SA-250
12ø
PIPE ANCHOR
PIPE GUIDE
EXPANSION JOINT
VENTURI
PRESSURE/TEMPERATURE PORT
THERMOMETER
PRESSURE GAGE
TEMPERATURE GAGE
FLEXIBLE PIPE CONNECTION
STRAINER
BLIND FLANGE
MANUAL AIR VENT
THERMOWELL
AUTOMATIC AIR VENT
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
CONDENSATE DRAINCD
ELBOW, 90°
ELBOW, 90° TURN DOWN
ELBOW, 90° TURN UP
ELBOW, 45° TURN DOWN
ELBOW, 45° TURN UP
PIPE BREAK
CAP
DIRECT
EVAPORATIVE
COOLER
DIRECT
EXPANSION
COOLING COIL
CONSTANT AIR
VOLUME BOX WITH
REHEAT COIL
VARIABLE AIR
VOLUME BOX WITH
REHEAT COIL
HOT WATER
HEATING COIL
CHILLED WATER
COOLING COIL
ELECTRIC
HEATING COIL
VFD (VARIABLE
FREQUENCY DRIVE)
GAS-FIRED
DUCT FURNACE
FREEZE STAT
FILTER SENSOR
GRAVITY DAMPER
CO2 SENSOR
GAS
ELECTRIC
ANALOG INPUT
ANALOG OUTPUT
DIGITAL INPUT
DIGITAL OUTPUT
COMMUNICATION
VARIABLE FREQUENCY DRIVE
MOTOR STARTER
DIRECT EXPANSION
MOTOR
THERMOSTAT
HUMIDISTAT
SMOKE DETECTOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
CURRENT TRANSMITTER
NATURAL GAS DETECTOR
FACE &
BYPASS COIL
DIRECT EXPANSION HEAT
PUMP
EXHAUST FAN
MOTORIZED
OPPOSED
BLADE DAMPER
SMOKE/DUCT
DETECTOR
TEMPERATURE
SENSOR
FLOW SWITCH
PRESSURE SENSOR
CURRENT TRANSMITTER
TEMPERATURE TRANSMITTER
FLOW METER
FLOW LIMITER
TEMPERATURE SWITCH
TEMPERATURE CONTROLLER
DIFFERENTIAL PRESSURE SENSOR
MOTOR ACTUATOR
FLOW MEASURING & BALANCING VALVE
W/ 100% SHUT OFF
R
SD SD
TRANSITION - ONE SIDED
TRANSITION - DOUBLE SIDED
VD, BDD
90° ELBOW TURNED UP,
RECTANGULAR
TRANSITION -
RECTANGULAR TO ROUND DUCT
STANDARD BRANCH -
FOR SUPPLY AIR W/EXTRACTOR
AND RETURN AIR W/O EXTRACTOR
RECTANGULAR DUCT INCLINE -
RISE OR DROP IN RESPECT TO
THE AIR FLOW
SPLITTER DAMPER
ROUND DUCT INCLINE -
RISE OR DROP IN RESPECT
TO THE AIR FLOW
PRESSURE/TEMPERATURE TEST
PLUG (PETE PLUG OR EQUAL)
VD
BDD
= VOLUME DAMPER
= BACKDRAFT DAMPER
ELBOW - W/TURNING VANES
(RECTANGULAR), SMOOTH RADIUS
ELBOW - W/TURNING VANE
(RECTANGULAR)
FIRE DAMPER
SMOKE DAMPER
SMOKE AND FIRE DAMPER
MOTOR OPERATED DAMPER
M
SA SOUND ATTENUATOR
DUCT ELEVATION
TAG ABOVE FINISH
FLOOR
18x10
T 9'-10" B 9'-0"
FLEXIBLE CONNECTION
FLEXIBLE DUCT
UC 3/4" UNDERCUT DOOR 3/4"
AD
AD
ACCESS DOOR
PLAN SECTION
SUPPLY AIR REGISTER OR
GRILLE - W/DUCT-MOUNTED
EXTRACTOR
EXHAUST OR RETURN AIR
REGISTER OR GRILLE
ACOUSTICAL LINING -
DUCT DIMENSIONS FOR NET
FREE AREA
RETURN AIR GRILLE
90° ELBOW TURNED UP,
RECTANGULAR
90° ELBOW TURNED UP,
ROUND
90° ELBOW TURNED UP,
ROUND
RETURN DUCT SECTION,
RECTANGULAR
SUPPLY DUCT SECTION,
RECTANGULAR
EXHAUST DUCT SECTION,
RECTANGULAR
ROUND DUCT
12x12
RECTANGULAR DUCT12x12
24x12
24x12
24x12
R
HIDDEN DUCT24x18
SUPPLY FAN
NEW CONNECTION TO
EXISTING
EXHAUST AIR GRILLE
SUPPLY DIFFUSER
(NO ARROWS INDICATE 4-WAY)
SUPPLY DIFFUSER
(ROUND)
TAG OR FLOW RATE
SIZE
12x12
12ø
12ø
LOUVER
AD ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFR ABOVE FINISHED ROOF
AHU AIR HANDLING UNIT
AI ANALOG INPUT
ALT ALTERNATIVE
AMB AMBIENT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
ARF ABOVE RAISED FLOOR
AV AIR VALVE
AVG AVERAGE
BAS BUILDING AUTOMATION SYSTEM
BCE BASE CIVIL ENGINEERING
BHP BRAKE HORSE POWER
BDD BACK DRAFT DAMPER
BOD BOTTOM OF DUCT
BOE BOTTOM OF EQUIPMENT
BOP BOTTOM OF PIPE
BTUH BRITISH THERMAL UNITS PER HOUR
CAV CONSTANT AIR VOLUME
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CLG CEILING, COOLING
CO CLEAN OUT
CONN CONNECTION
CONT CONTINUOUS
CRAC COMPUTER ROOM AIR CONDITIONER
CU CONDENSING UNIT
DB DRY BULB
dB DECIBEL(S)
DDC DIRECT DIGITAL CONTROL
DEG F DEGREES FAHRENHEIT
DH DEHUMIDIFIER
DIA DIAMETER
DN DOWN
DX DIRECT EXPANSION
E EXISTING
EA EXAUST AIR
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
F FUTURE
FA FREE AREA
FCP FAN CONTROL PANEL
FCU FAN COIL UNIT
FL FILTER, FLOOR
FLA FULL LOAD AMPS
FPB FAN POWERED BOX
FPM FEET PER MINUTE
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HP HORSE POWER
HR HOUR
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HZ HERTZ
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCHES
I/O INPUT/OUTPUT
I/P CURRENT TO PNEUMATIC
KEF KITCHEN EXHAUST FAN
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LB POUNDS
LV LOUVER
LWT LEAVING WATER TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH THOUSAND BTUH
MCC MOTOR CONTROL CENTER
MISC MISCELLANEOUS
MIN MINIMUM, MINUTES
MFG MANUFACTURING
MOD MOTOR OPERATED DAMPER
NC NORMALLY CLOSED, NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN, NUMBER
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OS&Y OUTSIDE SCREW AND YOKE
PD PRESSURE DROP
PH PHASE
PLBG PLUMBING
PPH POUNDS PER HOUR
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RA RETURN AIR
REQD REQUIRED
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
RTU ROOFTOP UNIT
S SIGNAL PORT
SA SUPPLY AIR, SOUND ATTENUATOR
SCFM STANDARD CUBIC FEET PER MINUTE
SF SUPPLY FAN, SQUARE FEET
SP STATIC PRESSURE
SQ SQUARE
TCP TEMPERATURE CONTROL PANEL
TD TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE, TEMPORARY
TES THERMAL ENERGY STORAGE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UH UNIT HEATER
V VOLTS
VAV VARIABLE AIR VOLUME
V&C VALVE AND CAP
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VTR VENT THROUGH ROOF
W WATTS
WB WET BULB
WG WATER GAUGE
WPD WATER PRESSURE DROP
1. PROVIDE AND INSTALL ALL MECHANICAL SYSTEMS IN ACCORDANCE
WITH THE UNIFIED FACILITIES CRITERIA (UFC'S), 2018 NORTH CAROLINA
MECHANICAL CODE AND ALL OTHER APPLICABLE STATE AND LOCAL
CODES.
2. PROVIDE AND INSTALL ALL PLUMBING SYSTEMS IN ACCORDANCE WITH
THE 2018 INTERNATIONAL PLUMBING CODE AND ALL OTHER
APPLICABLE STATE AND LOCAL CODES.
3. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC)
ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND
GENERAL ARRANGEMENT ONLY. PLANS SHOULD NOT BE SCALED.
4. INSTALL ALL MECHANICAL AND PLUMBING EQUIPMENT AND
APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS'
RECOMMENDATIONS.
5. VERIFY ALL CLEARANCES BEFORE FABRICATING AND INSTALLING
WORK. COORDINATE WITH ALL OTHER TRADES.
6. DRAWINGS REFLECT DIMENSIONS OF DESIGN MFG. EQUIPMENT.
ALLOWABLE ALTERNATES, WHILE EQUAL IN OUTPUT CAPACITY WILL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO MEET THE SPACE
REQUIREMENTS AND PROVE EQUALITY WITH DESIGN MFG. EQUIPMENT.
7. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S
CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND
PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS
TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT
AND PIPING DIMENSIONS BEFORE FABRICATION.
8. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE UFC'S AND
NFPA 70. IF WHIP/LIQUID TIGHT/CONDUIT AND CONDUCTOR ARE
DAMAGED DURING DEMO, CONTRACTOR SHALL REPLACE WITH NEW.
9. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND
AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS
OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL
CONTRACTOR.
10. PROVIDE ACCESS PANELS FOR INSTALLATION IN DUCTWORK, WALLS AND
CEILINGS, WHERE REQUIRED, TO SERVICE CONTROLS DEVICES, DAMPERS,
VALVES, DUCTWORK, SMOKE DETECTORS, AND OTHER CONCEALED
MECHANICAL EQUIPMENT. ACCESS PANEL INSTALLATION SHALL BE
COORDINATED WITH PROCESS REQUIREMENTS, ARCHITECTURAL WORK TO
MATCH MATERIALS AND FINISHES.
11. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL
STEEL SHALL BE COORDINATED WITH ALL TRADES. ALL ATTACHMENTS TO
STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS
OR AS SHOWN ON THE MECHANICAL AND STRUCTURAL DRAWINGS. PROVIDE
BEAM CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS
SHALL NOT BE PERMITTED.
12. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK AND PIPING SYSTEMS
CONNECTED TO FANS, PUMPS AND OTHER EQUIPMENT WHICH REQUIRE
VIBRATION ISOLATION.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY HEATING
AND COOLING OF AFFECTED AREAS OF THE BUILDINGS DURING
CONSTRUCTION. CONTRACTOR RESPONSIBILITIES TO INCLUDE, BUT NOT
LIMITED TO, THE FOLLOWING: THE INSTALLATION, CONNECTION, AND
DISCONNECTION OF THE SERVICES. UTILITY SOURCES FOR THE TEMPORARY
SYSTEMS SHALL BE PROVIDED BY THE GOVERNMENT, CONTRACTOR
RESPONSIBLE FOR EXTENDING UTILITIES AS REQUIRED. CONTRACTOR SHALL
HAVE PRE-CONSTRUCTION MEETING WITH COR WITH PLANNED PHASING AND
MEANS OF PROVIDING TEMPORARY COOLING AND HEATING TO OBTAIN
APPROVAL OF PLAN PRIOR TO STARTING CONSTRUCTION. DEMOLITION OF
EXISTING SYSTEMS SHOULD NOT COMMENCE UNTIL TEMPORARY SYSTEMS ARE
IN PLACE AND THE COR HAS INSPECTED AND APPROVED THE TEMPORARY
SYSTEMS. CONTRACTOR SHALL COMPLETE CONSTRUCTION IN PHASES SUCH
THAT DOWNTIME IS MINIMIZED.
PA
PG
PT
C
C
H
C
EP
R
D
X
EH
C
FB
C
VFD
H
C
CAV
H
C
VAV
EF
SF
GAS
ELECT
AI
AO
DI
DO
COMM
CT
STARTER
VFD
HP
DX
M
T
H
CO
NO2
S
NG
M
F
P
DP
CT
T
TS
TC
FM
A
T
S
T
FRZ
ΔP
M
CO2
DIFFERENTIAL PRESSURE SENSORDP
DEMOLITION NOTES
1. THE SCOPE OF WORK IS LIMITED TO THE
RENOVATION/REPLACEMENT OF A PORTION OF THE
EXISTING MECHANICAL EQUIPMENT. HVAC WORK
INCLUDES CONDUCTING A TEST AND BALANCE REPORT
PRIOR TO AND AFTER CONSTRUCTION, DUCTWORK
MODIFICATIONS TO MEET THE RENOVATED SPACE/SYSTEMS
REQUIREMENTS, AND THE ADDITION OF ANY OTHER
ARCHITECTURAL ELEMENTS REQUIRED AS INDICATED ON
DRAWINGS.
2. PRIOR TO THE START OF CONSTRUCTION OR DEMOLITION
WORK, A CERTIFIED TEST AND BALANCE REPORT SHALL BE
SUBMITTED TO THE ENGINEER. THE TEST AND BALANCE
REPORT SHALL INCLUDE THE FOLLOWING FROM THE
EXISTING AIR HANDLING UNIT TO BE REPLACED. MEASURE
AND RECORD FROM THE SUPPLY AIRFLOW FROM THE AHU,
OUTSIDE AIRFLOW RATE TO THE AHU, AND RETURN
AIRFLOW TO THE UNIT.
3. SYSTEMS SHALL BE ADJUSTED TO ACHIEVE THE MEASURED
AIRFLOW RATES AS EXISTING EQUIPMENT PRIOR TO
DEMOLITION OR AS INDICATED ON PLANS. WORK SHALL
INCLUDE ADDING ANY BALANCING DAMPERS WITHIN
EXISTING OR NEW DUCTWORK, CHANGING BELTS AND
SHEAVES NECESSARY TO THE AHU TO ACHIEVE AIRFLOW
RATES. AT POINT OF SUBSTANTIAL COMPLETION,
CONTRACTOR SHALL TEST, ADJUST AND BALANCE THE
SYSTEM AND SUBMIT A CERTIFIED REPORT TO THE
ENGINEER INDICATING THE FOLLOWING: SUPPLY AIR FLOW
FROM THE NEW AHU, OUTSIDE AIR FLOW TO THE NEW AHU,
AND RETURN AIR FLOW FROM THE SPACE.
4. DRAWINGS WERE PREPARED IN PART BASED ON EXISTING
AS-BUILTS DRAWINGS AND NON-DESTRUCTIVE FIELD
WORK. EXISTING MECHANICAL DUCTWORK AND PIPING
SHOWN IS SCHEMATIC AND MAY NOT NECESSARILY
REPRESENT EXACT LOCATIONS.
5. EXISTING MECHANICAL DUCTWORK AND PIPING NOT
ASSOCIATED WITH THE RENOVATION IS NOT SHOWN AND
SHALL REMAIN IN SERVICE.
6. FIELD VERIFY EXISTING CONDITIONS AND REPORT
DISCREPANCIES TO THE GOVERNMENT/ENGINEER BEFORE
COMMENCING WORK.
7. ALL MATERIALS AND EQUIPMENT BEING REMOVED UNDER
DEMOLITION SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND SHALL BE DISPOSED OF OFF SITE,
UNLESS OTHERWISE NOTED. UNITS INDICATED FOR
REMOVAL SHALL BE DISPOSED OF AS RECYCLED
MATERIALS AND SHALL NOT TO BE REUSED ELSEWHERE.
REFER TO DIVISION 1 SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND TRACKING REQUIREMENTS.
8. REFER TO DIVISION 1 SPECIFICATIONS FOR REQUIREMENTS
AND INSTRUCTIONS ON THE RECLAMATION AND DISPOSAL
OF ALL REFRIGERANT. ALL DISPOSAL SHALL BE THE
RESPONSIBILITY OF THE GOVERNMENT. CONTRACTOR
RESPONSIBLE FOR RECLAIMING AND TRACKING (UNIT,
POUNDS, AND OUNCES) AND COORDINATING WITH
BCE/ENVIRONMENTAL FOR TURNOVER. THE BCE WILL
PROVIDE THE CONTRACTOR WITH CONTAINERS FOR
RECLAIMED REFRIGERANT WHICH WILL BE TURNED OVER
WHEN FULL.
9. EXISTING HVAC EQUIPMENT/COMPONENTS TO BE REPLACED
WITH NEW EQUIPMENT/COMPONENT OF LIKE OR SIMILAR
ELECTRICAL REQUIREMENTS. NEW
EQUIPMENT/COMPONENTS SHALL BE CONNECTED TO THE
EXISTING CIRCUIT AND DISCONNECT REMAINING AFTER
DEMOLITION. REFER TO NEW WORK DRAWINGS FOR
FURTHER CLARIFICATION.
10. DISCONNECT ELECTRICAL SERVICES TO ELECTRICAL
DEVICES THAT ARE NOTED TO BE REMOVED. WIRE AND
CONDUIT TO BE REMOVED BACK TO THE FIRST TERMINATION
POINT WHICH IS TO REMAIN.
POINT OF DEMOLITION
NONE
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
00M001
N. OVERBY
10137117-00-MP.rvt
GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
FEB 2020 B-3 DESIGN SUBMITTAL
NO WORK IN THIS AREANO WORK IN THIS AREA
PU-1 INSTALLED ABOVE CEILING.
EXISTING PACKAGED UNIT TO BE
REMOVED. DUCTWORK AND ALL OTHER
MATERIALS SHALL REMAIN.
REMOVE EXISTING
REFRIGERANT LINES.
REMOVE EXISTING
FURNACE. ALL ASSOCIATED
DUCTWORK, GAS PIPING,
COMBUSTION AIR INTAKE,
FLUES, AND CONTROLS
SHALL REMAIN. (TYP)
POWER
PRODUCTION
ALO
ALO
SUPPLY
OFFICER
ELEC. /COMM
COPY ROOM
MEN
1ST SARGENT
COMMANDER'S
CONF.ROOM
COMMANDER
SQUADRON
SUPERVISOR
PERSONNEL
STOR
RECEPT/INFO
MGMT.OFFICE
PERSONNEL
OFFICE
WOMEN
CORR
MECHANICAL
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
3/32" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
01MD101
N. OVERBY
10137117-00-MP.rvt
FIRST FLOOR MECHANICAL DEMOLITION PLAN
BUILDING 01
NO WORK IN THIS AREA
1 (TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
3/32" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
01MD102
N. OVERBY
10137117-00-MP.rvt
ROOF MECHANICAL DEMOLITION PLAN
BUILDING 01
KEYNOTES
1 EXISTING CONDENSING UNITS AND ASSOCIATED
REFRIGERANT LINES TO BE REMOVED. EXISTING
ELECTRICAL CONDUIT, WIRING, AND
DISCONNECTS TO REMAIN. ROOF PENETRATIONS
TO BE REUSED.
01AH-2
01AH-3
01AH-1
01GF-4
REFRIGERANT LINES TO UTILIZE
EXISTING PENETRATIONS AND
ROUTE DOWN FROM CONDENSING
UNITS LOCATED ON ROOF (TYP)
8ø 01AH-4
12x14
16x16
01AH-4 INSTALLED ON MEZZANINE ABOVE
RM135. 8"OA DUCT TO ROUTE UP WALL AND
THRU TO ROOF. SUPPLY AND RETURN
DUCTWORK TO PENETRATE SLAB AND
CONNECT TO EXISTING DUCTWORK BELOW.
REFER TO DETAIL #6/99M004
REFRIGERANT LINE
UP TO 01HP-4
LOCATED ON ROOF.
LOCATE FURNACES IN SAME
LOCATION AS DEMOLISHED AND
CONNECT BACK TO EXISTING
DUCTWORK, GAS PIPE, COMBUSTION
AIR INTAKE, FLUE, CONDENSATE AND
CONTROLS. PROVIDE FLEXIBLE
CONNECTION BETWEEN GAS
FURNACE AND DUCTWORK. PROVIDE
TRANSITION AS REQUIRED FOR
CONNECTION TO EXISTING
DUCTWORK (TYP)
ELEC. /COMM
128 LOBBY/
WAITING
PERSONNEL
SQUADRON
SUPERVISOR
COMMANDER
COMMANDER'S
CONF.ROOM
1ST SARGENT
108POWER
PRODUCTION
ALO
ALO
SUPPLY
OFFICER
MEN
RECEPT/INFO
MGMT.OFFICE
MECHANICAL
STOR
WOMEN
JAN
CORR
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
3/32" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
01M101
N. OVERBY
10137117-00-MP.rvt
FIRST FLOOR MECHANICAL PLAN
BUILDING 01
KEYNOTES
1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL
NEW AND EXISTING MECHANICAL EQUIPMENT
SHALL BE TIED IN AND VISIBLE ON THE EXISTING
FRONT END.
2 SMART METER ON EXISTING PROPANE SERVICE.
COORDINATE TYPES AND DESIGNS WITH
GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE DOWNLOADING OF DATA.
3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH
IN ACCORDANCE WITH SECTION 3-19, UFC
4-010-011 "STANDARD 18". SWITCH TO BE
LOCATED WITHIN THE BUILDING AND VISIBLE TO
ALL OCCUPANTS. COORDINATE FINAL LOCATION
OF SWITCH WITH GOVERNMENT. EMERGENCY
SHUTOFF SWITCH SHALL BE TIED INTO BUILDING
BAS CONTROLLER/ROUTER AND INITIATE SHUT
DOWN OF ALL HVAC EQUIPMENT AND CLOSURE
OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN
30 SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY
TIED TO THE FRONT END FOR VISIBILITY AND
CONTROL WITHIN THE BAS. NOTIFY
GOVERNMENT/COR OF EXISTING CONDITIONS
AND CURRENT OPERATION.
01HP-1
01HP-2
01CU-4
01HP-3
REFRIGERANT LINES ROUTED
DOWN THRU EXISTING ROOF
PENETRATIONS. (TYP)
01HP-4
8"OA DUCT UP THRU
ROOF. TERMINATE WITH
BIRD SCREEN AND
HOODED ROOF CAP.
CONDENSING UNIT TO BE
INSTALLED ON EXISTING RAILS
(TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
3/32" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
01M102
N. OVERBY
10137117-00-MP.rvt
ROOF MECHANICAL PLAN
BUILDING 01
GENERAL NOTE:
A. ALL ROOF WORK AND PENETRATIONS SHALL BE
EXECUTED BY A CERTIFIED ROOFER WITH THE
APPROVAL OF THE GOVERNMENT/COR.
ELEC
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/8" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
03M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLAN
BUILDING 03
KEYNOTES
1 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO COMMUNICATIONS
RESTRICTIONS, NOTIFY COR AND ENSURE THAT
METER IS ACCESSIBLE FOR REMOTE
DOWNLOADING OF DATA.
2 SMART METER ON EXISTING PROPANE SERVICE.
COORDINATE TYPES AND DESIGNS WITH
GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO COMMUNICATIONS
RESTRICTIONS, NOTIFY COR AND ENSURE THAT
METER IS ACCESSIBLE FOR REMOTE
DOWNLOADING OF DATA.
3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH IN
ACCORDANCE WITH SECTION 3-19, UFC 4-010-011
"STANDARD 18". SWITCH TO BE LOCATED WITHIN
THE BUILDING AND VISIBLE TO ALL OCCUPANTS.
COORDINATE FINAL LOCATION OF SWITCH WITH
GOVERNMENT. EMERGENCY SHUTOFF SWITCH
SHALL BE TIED INTO BUILDING BAS
CONTROLLER/ROUTER AND INITIATE SHUT DOWN
OF ALL HVAC EQUIPMENT AND CLOSURE OF ALL
OUTSIDE AIR DAMPERS/LOUVERS WITHIN 30
SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY TIED
TO THE FRONT END FOR VISIBILITY AND CONTROL
WITHIN THE BAS. NOTIFY GOVERNMENT/COR OF
EXISTING CONDITIONS AND CURRENT
OPERATION.
REMOVE REFRIGERANT
LINES. WALL PENETRATIONS
TO REMAIN FOR REUSE.
(TYP)
REMOVE EXISTING
FURNACE. ALL ASSOCIATED
DUCTWORK, GAS PIPING,
COMBUSTION AIR INTAKE,
FLUES, AND CONTROLS
SHALL REMAIN. (TYP)
EXISTING PTAC UNIT TO BE
REMOVED. WALL PENETRATION
TO REMAIN FOR REUSE.
MECHANICAL
EXISTING CONDENSING UNIT
(CU-2) TO BE REMOVED
EXISTING CONDENSING UNIT
(CU-1) TO BE REMOVED
04CU-2
04AH-2
04AH-1
04CU-1
LOCATE FURNACES IN SAME
LOCATION AS DEMOLISHED
AND CONNECT BACK TO
EXISTING DUCTWORK, GAS
PIPE, COMBUSTION AIR
INTAKE, FLUE, CONDENSATE
AND CONTROLS. PROVIDE
FLEXIBLE CONNECTION
BETWEEN GAS FURNACE AND
DUCTWORK. PROVIDE
TRANSITION AS REQUIRED
FOR CONNECTION TO
EXISTING DUCTWORK (TYP)
HEAT PUMP UNITS ON EXISTING
CONCRETE PADS. EXTEND PAD AS
NECESSARY SUCH THAT PAD
EXTENDS 6" BEYOND THE FOOTPRINT
OF THE UNIT.(TYP)
04PTAC-1
PTAC UNIT TO BE INSTALLED IN
EXISTING WALL PENETRATION.
CONTRACTOR TO ALTER WALL
OPENING AS NECESSARY
MECHANICAL
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/8" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
04M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLANS
BUILDING 04
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN
1/8" = 1'-0"
MECHANICAL PLAN
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR AND
DOOR SWITCHES. ROUTER SHALL COMMUNICATE
WITH EXISTING BAS CONTROLLER LOCATED IN
BUILDING 1.
2 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO COMMUNICATIONS
RESTRICTIONS, NOTIFY COR AND ENSURE THAT
METER IS ACCESSIBLE FOR REMOTE
DOWNLOADING OF DATA.
3 SMART METER ON EXISTING PROPANE SERVICE.
COORDINATE TYPES AND DESIGNS WITH
GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO COMMUNICATIONS
RESTRICTIONS, NOTIFY COR AND ENSURE THAT
METER IS ACCESSIBLE FOR REMOTE
DOWNLOADING OF DATA.
4 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH IN
ACCORDANCE WITH SECTION 3-19, UFC 4-010-011
"STANDARD 18". SWITCH TO BE LOCATED WITHIN
THE BUILDING AND VISIBLE TO ALL OCCUPANTS.
COORDINATE FINAL LOCATION OF SWITCH WITH
GOVERNMENT. EMERGENCY SHUTOFF SWITCH
SHALL BE TIED INTO BUILDING BAS
CONTROLLER/ROUTER AND INITIATE SHUT DOWN
OF ALL HVAC EQUIPMENT AND CLOSURE OF ALL
OUTSIDE AIR DAMPERS/LOUVERS WITHIN 30
SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY TIED
TO THE FRONT END FOR VISIBILITY AND CONTROL
WITHIN THE BAS. NOTIFY GOVERNMENT/COR OF
EXISTING CONDITIONS AND CURRENT
OPERATION.
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
3/16" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
06M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLAN
BUILDING 06
KEYNOTES
1 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO COMMUNICATIONS
RESTRICTIONS, NOTIFY COR AND ENSURE THAT
METER IS ACCESSIBLE FOR REMOTE
DOWNLOADING OF DATA.
2 SMART METER ON EXISTING PROPANE SERVICE.
COORDINATE TYPES AND DESIGNS WITH
GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO COMMUNICATIONS
RESTRICTIONS, NOTIFY COR AND ENSURE THAT
METER IS ACCESSIBLE FOR REMOTE
DOWNLOADING OF DATA.
3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH IN
ACCORDANCE WITH SECTION 3-19, UFC 4-010-011
"STANDARD 18". SWITCH TO BE LOCATED WITHIN
THE BUILDING AND VISIBLE TO ALL OCCUPANTS.
COORDINATE FINAL LOCATION OF SWITCH WITH
GOVERNMENT. EMERGENCY SHUTOFF SWITCH
SHALL BE TIED INTO BUILDING BAS
CONTROLLER/ROUTER AND INITIATE SHUT DOWN
OF ALL HVAC EQUIPMENT AND CLOSURE OF ALL
OUTSIDE AIR DAMPERS/LOUVERS WITHIN 30
SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY TIED
TO THE FRONT END FOR VISIBILITY AND CONTROL
WITHIN THE BAS. NOTIFY GOVERNMENT/COR OF
EXISTING CONDITIONS AND CURRENT
OPERATION.
NO WORK IN THIS AREA NO WORK IN THIS AREA
08MD101
REMOVE EXISTING
FURNACE. ALL ASSOCIATED
DUCTWORK, GAS PIPING,
COMBUSTION AIR INSTAKE,
FLUES, AND CONTROLS
SHALL REMAIN. (TYP)
REMOVE EXISTING REFRIGERANT
LINES. WALL PENETRATION
SHALL REMAIN FOR REUSE. (TYP)
REMOVE EXISTING CONDENSING
UNIT AND ASSOCIATED
REFRIGERANT LINES. WALL
PENETRATION SHALL REMAIN
FOR REUSE. (TYP)
AS NOTED
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
08MD101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL DEMOLITION PLANS
BUILDING 08
- 1/4" = 1'-0"
1 ENLARGED MECHANICAL DEMOLITION PLAN
NO WORK IN THIS AREA NO WORK IN THIS AREA
08M101
8GF-1
8GF-4 8GF-2
8GF-3
8CU-28CU-38CU-18CU-4
LOCATE FURNACES IN SAME LOCATION AS
DEMOLISHED AND CONNECT BACK TO
EXISTING DUCTWORK, GAS PIPE, COMBUSTION
AIR INTAKE, FLUE, CONDENSATE AND
CONTROLS. PROVIDE FLEXIBLE CONNECTION
BETWEEN GAS FURNACE AND DUCTWORK.
PROVIDE TRANSITION AS REQUIRED FOR
CONNECTION TO EXISTING DUCTWORK (TYP)
RL/RS
(TYP)
HEAT PUMP UNITS ON EXISTING
CONCRETE PADS. EXTEND PAD AS
NECESSARY SUCH THAT PAD
EXTENDS 6" BEYOND THE FOOTPRINT
OF THE UNIT.(TYP)
AS NOTED
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:3
P M
08M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLANS
BUILDING 08
1/16" = 1'-0"
BUILDING 08 OVERALL PLAN
- 1/4" = 1'-0"
1 ENLARGED MECHANICAL PLAN
ROUTE REFRIGERANT LINES THRU
EXISTING WALL PENETRATIONS. (TYP)
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR AND
DOOR SWITCHES. ROUTER SHALL COMMUNICATE
WITH EXISTING BAS CONTROLLER LOCATED IN
BUILDING 3.
2 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO COMMUNICATIONS
RESTRICTIONS, NOTIFY COR AND ENSURE THAT
METER IS ACCESSIBLE FOR REMOTE
DOWNLOADING OF DATA.
3 SMART METER ON EXISTING PROPANE SERVICE.
COORDINATE TYPES AND DESIGNS WITH
GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO COMMUNICATIONS
RESTRICTIONS, NOTIFY COR AND ENSURE THAT
METER IS ACCESSIBLE FOR REMOTE
DOWNLOADING OF DATA.
4 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH IN
ACCORDANCE WITH SECTION 3-19, UFC 4-010-011
"STANDARD 18". SWITCH TO BE LOCATED WITHIN
THE BUILDING AND VISIBLE TO ALL OCCUPANTS.
COORDINATE FINAL LOCATION OF SWITCH WITH
GOVERNMENT. EMERGENCY SHUTOFF SWITCH
SHALL BE TIED INTO BUILDING BAS
CONTROLLER/ROUTER AND INITIATE SHUT DOWN
OF ALL HVAC EQUIPMENT AND CLOSURE OF ALL
OUTSIDE AIR DAMPERS/LOUVERS WITHIN 30
SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY TIED
TO THE FRONT END FOR VISIBILITY AND CONTROL
WITHIN THE BAS. NOTIFY GOVERNMENT/COR OF
EXISTING CONDITIONS AND CURRENT
OPERATION.
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
REMOVE EXISTING
REFRIGERANT LINES
DOWN FROM ABOVE
OPEN TO BELOW
REMOVE EXISTING FURNACE.
ALL ASSOCIATED DUCTWORK,
GAS PIPING, COMBUSTION AIR
INSTAKE, FLUES, AND
CONTROLS SHALL REMAIN.
(TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/16" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
12MD101
N. OVERBY
10137117-00-MP.rvt
ROOF MECHANICAL DEMOLITION PLAN
BUILDING 12
1/16" = 1'-0"
ROOF MECHANICAL DEMOLITION PLAN
KEYNOTES
1 EXISTING CONDENSING UNITS AND ASSOCIATED
REFRIGERANT LINES TO BE REMOVED. EXISTING
ELECTRICAL CONDUIT, WIRING, AND
DISCONNECTS TO REMAIN. ROOF PENETRATIONS
TO BE REUSED.
2 EXISTING ROOFTOP UNIT AND ASSOCIATED
CONTROLS TO BE REMOVED. ALL ELECTRICAL
CONDUIT, WIRING, AND DISCONNECT TO REMAIN
FOR REUSE.
3 REFRIGERANT PIPING TO BE REMOVED. MAINTAIN
REFRIGERANT VAULT AND ROOF PENETRATION
FOR REUSE.
4 ALL INDICATED ROOF MOUNTED EQUIPMENT TO
BE REMOVED. ROOF CURBS AND PENETRATIONS
TO BE REUSED.
1/16" = 1'-0"
MEZZANINE MECHANICAL DEMOLITION PLAN
12CU-3
12CU-6
12CU-5
12CU-1
12CU-4
REFRIGERANT LINES DOWN
THROUGH EXISTING ROOF
PENETRATION TO
MEZZANINE LEVEL BELOW
12MSCU-9
12RTU-4
12RTU-3
12RTU-2
12RTU-1
12RTU-8
12RTU-7
12RTU-5
12RTU-2-1
12RTU-2-2
12RTU-1-1
12RTU-1-2
12RTU-2-3
EXISTING PROPANE
LINES TO REMAIN (TYP)
PROPANE SMART
METER THIS LOCATION
ON FIRST FLOOR
12RTU-6
EXISTING PROPANE
UP FROM BELOW
LOCATE ALL ROOF TOP UNITS SUCH
THAT EXISTING SUPPLY AND
RETURN DUCT PENETRATIONS ARE
USED. PROVIDE CURB ADAPTER AS
REQUIRED (TYP)
REFRIGERANT LINES
DOWN THROUGH
EXISTING ROOF
PENETRATION
GF-4
GF-1
GF-3
GF-5
GF-6
OPEN TO BELOW
LOCATE FURNACES IN SAME LOCATION AS
DEMOLISHED AND CONNECT BACK TO EXISTING
DUCTWORK, GAS PIPE, COMBUSTION AIR INTAKE,
FLUE, CONDENSATE AND CONTROLS. PROVIDE
FLEXIBLE CONNECTION BETWEEN GAS FURNACE
AND DUCTWORK. PROVIDE TRANSITION AS
REQUIRED FOR CONNECTION TO EXISTING
DUCTWORK (TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/16" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
12M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLANS
BUILDING 12
1/16" = 1'-0"
ROOF MECHANICAL PLAN
KEYNOTES
1 WALL MOUNTED INDOOR UNIT LOCATED ON
FIRST FLOOR IN ROOM 128.
2 SMART METER ON EXISTING PROPANE SERVICE.
COORDINATE TYPES AND DESIGNS WITH
GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE DOWNLOADING OF DATA.
3 EXISTING LIGHTNING PROTECTION CABLES AND
SYSTEM TO BE REINSTALLED UPON COMPLETION
OF ROOFTOP UNIT INSTALLATION.
4 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH
IN ACCORDANCE WITH SECTION 3-19, UFC
4-010-011 "STANDARD 18". SWITCH TO BE
LOCATED WITHIN THE BUILDING AND VISIBLE TO
ALL OCCUPANTS. COORDINATE FINAL LOCATION
OF SWITCH WITH GOVERNMENT. EMERGENCY
SHUTOFF SWITCH SHALL BE TIED INTO BUILDING
BAS CONTROLLER/ROUTER AND INITIATE SHUT
DOWN OF ALL HVAC EQUIPMENT AND CLOSURE
OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN
30 SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY
TIED TO THE FRONT END FOR VISIBILITY AND
CONTROL WITHIN THE BAS. NOTIFY
GOVERNMENT/COR OF EXISTING CONDITIONS
AND CURRENT OPERATION.
1/16" = 1'-0"
MEZZANINE MECHANICAL PLAN
EXISTING WALL MOUNTED PACKAGED UNIT AND
ASSOCIATED CONTROLS TO BE REMOVED. ALL
ELECTRICAL CONDUIT, WIRING , AND DISCONNECTS
TO REMAIN FOR REUSE. (TYP)
16WMU-2
16WMU-2
PACKAGED UNIT SHALL BE
INSTALLED TO UTILIZE EXISTING
WALL PENETRATIONS (TYP)
1 2
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/4" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
16M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLANS
BUILDING 16
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN
1/4" = 1'-0"
MECHANICAL PLAN
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR, AND
THERMOSTAT (ALERTON MODEL:VLC/D).
ROUTER SHALL COMMUNICATE WITH EXISTING
BAS CONTROLLER LOCATED IN BUILDING 3.
2 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH
IN ACCORDANCE WITH SECTION 3-19, UFC
4-010-011 "STANDARD 18". SWITCH TO BE
LOCATED WITHIN THE BUILDING AND VISIBLE TO
ALL OCCUPANTS. COORDINATE FINAL LOCATION
OF SWITCH WITH GOVERNMENT. EMERGENCY
SHUTOFF SWITCH SHALL BE TIED INTO BUILDING
BAS CONTROLLER/ROUTER AND INITIATE SHUT
DOWN OF ALL HVAC EQUIPMENT AND CLOSURE
OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN
30 SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY
TIED TO THE FRONT END FOR VISIBILITY AND
CONTROL WITHIN THE BAS. NOTIFY
GOVERNMENT/COR OF EXISTING CONDITIONS
AND CURRENT OPERATION.
REMOVE EXISTING AIR
HANDLER. ALL ASSOCIATED
DUCTWORK AND CONTROLS
SHALL REMAIN. (TYP)
EXISTING HEAT PUMPS AND ASSOCIATED
REFRIGERANT LINES TO BE REMOVED. ALL
ELECTRICAL CONDUIT, WIRING, AND
DISCONNECTS TO REMAIN FOR REUSE.
(TYP)
30HP-2
30HP-1
30AH-2
30AH-1
NEW REFRIGERANT LINES SHALL
BE ROUTED THROUGH EXISTING
WALL PENETRATIONS (TYP)
NEW HEAT PUMP UNIT SHALL
BE INSTALLED ON EXISTING
CONCRETE APRON. (TYP)
LOCATE AIR HANDLERS IN SAME LOCATION AS
DEMOLISHED AND CONNECT BACK TO EXISTING
DUCTWORK, CONDENSATE AND CONTROLS.
PROVIDE FLEXIBLE CONNECTION BETWEEN AIR
HANDLER AND DUCTWORK. PROVIDE TRANSITION AS
REQUIRED FOR CONNECTION TO EXISTING
DUCTWORK (TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/4" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
30M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLANS
BUILDING 30
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN
1/4" = 1'-0"
MECHANICAL PLAN
KEYNOTES
1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL
NEW AND EXISTING MECHANICAL EQUIPMENT
SHALL BE TIED IN AND VISIBLE ON THE EXISTING
FRONT END.
2 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE DOWNLOADING OF DATA.
3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH
IN ACCORDANCE WITH SECTION 3-19, UFC
4-010-011 "STANDARD 18". SWITCH TO BE
LOCATED WITHIN THE BUILDING AND VISIBLE TO
ALL OCCUPANTS. COORDINATE FINAL LOCATION
OF SWITCH WITH GOVERNMENT. EMERGENCY
SHUTOFF SWITCH SHALL BE TIED INTO BUILDING
BAS CONTROLLER/ROUTER AND INITIATE SHUT
DOWN OF ALL HVAC EQUIPMENT AND CLOSURE
OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN
30 SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY
TIED TO THE FRONT END FOR VISIBILITY AND
CONTROL WITHIN THE BAS. NOTIFY
GOVERNMENT/COR OF EXISTING CONDITIONS
AND CURRENT OPERATION.
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/4" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
50M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLAN
BUILDING 50
KEYNOTES
1 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE DOWNLOADING OF DATA.
2 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH
IN ACCORDANCE WITH SECTION 3-19, UFC
4-010-011 "STANDARD 18". SWITCH TO BE
LOCATED WITHIN THE BUILDING AND VISIBLE TO
ALL OCCUPANTS. COORDINATE FINAL LOCATION
OF SWITCH WITH GOVERNMENT. EMERGENCY
SHUTOFF SWITCH SHALL BE TIED INTO BUILDING
BAS CONTROLLER/ROUTER AND INITIATE SHUT
DOWN OF ALL HVAC EQUIPMENT AND CLOSURE
OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN
30 SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY
TIED TO THE FRONT END FOR VISIBILITY AND
CONTROL WITHIN THE BAS. NOTIFY
GOVERNMENT/COR OF EXISTING CONDITIONS
AND CURRENT OPERATION.
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/4" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
51M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLAN
BUILDING 51
KEYNOTES
1 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE DOWNLOADING OF DATA.
2 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH
IN ACCORDANCE WITH SECTION 3-19, UFC
4-010-011 "STANDARD 18". SWITCH TO BE
LOCATED WITHIN THE BUILDING AND VISIBLE TO
ALL OCCUPANTS. COORDINATE FINAL LOCATION
OF SWITCH WITH GOVERNMENT. EMERGENCY
SHUTOFF SWITCH SHALL BE TIED INTO BUILDING
BAS CONTROLLER/ROUTER AND INITIATE SHUT
DOWN OF ALL HVAC EQUIPMENT AND CLOSURE
OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN
30 SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY
TIED TO THE FRONT END FOR VISIBILITY AND
CONTROL WITHIN THE BAS. NOTIFY
GOVERNMENT/COR OF EXISTING CONDITIONS
AND CURRENT OPERATION.
TRAINING 2
JAN CL
122 ELEC
Room
VEST
CORR
STORAGE
OFFICE
TRAINING 1
CONTROL CAB
COMM
OFFICE
REMOVE EXISTING CONDENSING
UNIT AND ASSOCIATED
REFRIGERANT LINES. (TYP)
AIR HANDLERS LOCATED
ON PLATFORM IN ATTIC
TO BE REMOVED.
54HP-154HP-2
54AH-2
54AH-1
LOCATE AIR HANDLERS IN SAME LOCATION AS
DEMOLISHED AND CONNECT BACK TO EXISTING
DUCTWORK, CONDENSATE AND CONTROLS.
PROVIDE FLEXIBLE CONNECTION BETWEEN AIR
HANDLER AND DUCTWORK. PROVIDE TRANSITION
AS REQUIRED FOR CONNECTION TO EXISTING
DUCTWORK. FILTERS SHALL BE REMOVED FROM
THE AIR HANDLING UNITS AND (TYP)
REFRIGERANT LINES SHALL BE
ROUTED THROUGH EXISTING
WALL PENETRATIONS (TYP)
TRAINING 2
CONTROL CAB
COMM
TRAINING 1
OFFICE
OFFICE
CORR
STORAGE
VEST
Room
ELEC
JAN CL
HEAT PUMP UNITS ON EXISTING
CONCRETE PADS. EXTEND PAD AS
NECESSARY SUCH THAT PAD
EXTENDS 6" BEYOND THE FOOTPRINT
OF THE UNIT.(TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/4" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
54M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLANS
BUILDING 54
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN
1/4" = 1'-0"
MECHANICAL PLAN
KEYNOTES
1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL
NEW AND EXISTING MECHANICAL EQUIPMENT
SHALL BE TIED IN AND VISIBLE ON THE EXISTING
FRONT END.
2 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE DOWNLOADING OF DATA.
3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH
IN ACCORDANCE WITH SECTION 3-19, UFC
4-010-011 "STANDARD 18". SWITCH TO BE
LOCATED WITHIN THE BUILDING AND VISIBLE TO
ALL OCCUPANTS. COORDINATE FINAL LOCATION
OF SWITCH WITH GOVERNMENT. EMERGENCY
SHUTOFF SWITCH SHALL BE TIED INTO BUILDING
BAS CONTROLLER/ROUTER AND INITIATE SHUT
DOWN OF ALL HVAC EQUIPMENT AND CLOSURE
OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN
30 SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY
TIED TO THE FRONT END FOR VISIBILITY AND
CONTROL WITHIN THE BAS. NOTIFY
GOVERNMENT/COR OF EXISTING CONDITIONS
AND CURRENT OPERATION.
REMOVE EXISTING AIR
HANDLER. ALL ASSOCIATED
DUCTWORK AND CONTROLS
SHALL REMAIN. (TYP)
STAIR
VEST
ELEC
REMOVE EXISTING
CONDENSING UNIT AND
ASSOCIATED REFRIGERANT
LINES. (TYP)
REMOVE EXISTNG AIR
HANDLER. ALL ASSOCIATED
DUCTWORK AND CONTROLS
SHALL REMAIN. (TYP)
STAIR
EQUIPMENT/
MECHANICAL
RL/RS (TYP)
STAIR
OFFICE
TOILET
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/4" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
60MD101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL DEMOLITION PLANS
BUILDING 60
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN - FIRST FLOOR
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN - THIRD FLOOR
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN - SECOND FLOOR
60HP-3
60HP-2
60HP-1
60AH-1
STAIR
VEST
ELEC
HEAT PUMP UNITS ON EXISTING
CONCRETE PADS. EXTEND PAD AS
NECESSARY SUCH THAT PAD
EXTENDS 6" BEYOND THE
FOOTPRINT OF THE UNIT.(TYP)
60AH-2
60AH-3
STAIR
EQUIPMENT/
MECHANICAL
LOCATE AIR HANDLERS IN
SAME LOCATION AS
DEMOLISHED AND CONNECT
BACK TO EXISTING
DUCTWORK, CONDENSATE
AND CONTROLS. PROVIDE
FLEXIBLE CONNECTION
BETWEEN AIR HANDLER AND
DUCTWORK. PROVIDE
TRANSITION AS REQUIRED FOR
CONNECTION TO EXISTING
DUCTWORK (TYP)
RL/RS TO BE ROUTED UP
EXTERIOR FACE OF BUILDING
AND CONCEALED BY GUTTER.
COORDINATE COLOR/FINISH OF
GUTTER WITH BASE CIVIL
ENGINEERING
OFFICE
STAIR
TOILET
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/4" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
60M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLANS
BUILDING 60
1/4" = 1'-0"
MECHANICAL PLAN - FIRST FLOOR
1/4" = 1'-0"
MECHANICAL PLAN - THIRD FLOOR
1/4" = 1'-0"
MECHANICAL PLAN - SECOND FLOOR
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR, AND
THERMOSTAT (ALERTON MODEL:VLC/D).
ROUTER SHALL COMMUNICATE WITH EXISTING
BAS CONTROLLER LOCATED IN BUILDING 54.
2 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE DOWNLOADING OF DATA.
3 CONTRACTOR TO COORDINATE WITH COR, BASE
CIVIL ENGINEERING, AND END USER FOR THE
INSTALLATION OF THIS AIR HANDLER.
4 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH
IN ACCORDANCE WITH SECTION 3-19, UFC
4-010-011 "STANDARD 18". SWITCH TO BE
LOCATED WITHIN THE BUILDING AND VISIBLE TO
ALL OCCUPANTS. COORDINATE FINAL LOCATION
OF SWITCH WITH GOVERNMENT. EMERGENCY
SHUTOFF SWITCH SHALL BE TIED INTO BUILDING
BAS CONTROLLER/ROUTER AND INITIATE SHUT
DOWN OF ALL HVAC EQUIPMENT AND CLOSURE
OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN
30 SECONDS OF ACTIVATION. REFER TO DETAIL
#4/99M004 FOR MORE INFORMATION. IF
EMERGENCY SHUT-OFF SWITCH IS ALREADY
PRESENT WITHIN THE BUILDING, COORDINATE
WITH GOVERNMENT TO ENSURE PROPER
FUNCTION AND THAT SWITCH IS CURRENTLY
TIED TO THE FRONT END FOR VISIBILITY AND
CONTROL WITHIN THE BAS. NOTIFY
GOVERNMENT/COR OF EXISTING CONDITIONS
AND CURRENT OPERATION.
REMOVE AIR HANDLER INSTALLED
ON MEZZANINE ABOVE FIRST
FLOOR OFFICE/ADMIN SPACE. ALL
ASSOCIATED DUCTWORK AND
CONTROLS SHALL REMAIN.
HP-1
AH-1
REFRIGERANT LINES SHALL
BE ROUTED THRU EXISTING
WALL PENETRATION
LOCATE AIR HANDLER IN SAME
LOCATION AS DEMOLISHED AND
CONNECT BACK TO EXISTING
DUCTWORK, CONDENSATE AND
CONTROLS. PROVIDE FLEXIBLE
CONNECTION BETWEEN AIR HANDLER
AND DUCTWORK. PROVIDE TRANSITION
AS REQUIRED FOR CONNECTION TO
EXISTING DUCTWORK (TYP)
2 3
NEW HEAT PUMP UNIT SHALL
BE INSTALLED ON EXISTING
CONCRETE APRON. (TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W91242-18-F-0130
ANG PROJECT #: WEFM142600
HDR PROJECT #: 10137117
STANLY COUNTY AIR NATIONAL GUARD STATION
STANLY COUNTY AIRPORT
REPLACE HVAC SYSTEMS
BASE WIDE - STANLY CO.
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
NEW LONDON, NC
1/8" = 1'-0"C rv t\
\1
-0
-M
P d e re k .w o rl e y .r v t
/1
/2
:1
:4
P M
75M101
N. OVERBY
10137117-00-MP.rvt
MECHANICAL PLANS
BUILDING 75
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN
1/8" = 1'-0"
MECHANICAL PLAN
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR AND
DOOR SWITCHES. ROUTER SHALL
COMMUNICATE WITH EXISTING BAS
CONTROLLER LOCATED IN BUILDING 77.
2 SMART METER ON EXISTING PROPANE SERVICE.
COORDINATE TYPES AND DESIGNS WITH
GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE DOWNLOADING OF DATA.
3 SMART METER ON EXISTING ELECTRICAL
SERVICE. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END. IF
METER IS NOT VISIBLE DUE TO
COMMUNICATIONS RESTRICTIONS, NOTIFY COR
AND ENSURE THAT METER IS ACCESSIBLE FOR
REMOTE…
This is the start of the file's text. The full file is on GovTribe.