This document is a solicitation for replacing HVAC equipment and systems at various facilities of the North Carolina Army National Guard. The solicitation calls for replacing aging HVAC units, ductwork, controls and associated components at multiple buildings base-wide. Bids are due by May 20, 2021 with work to commence in July 2021. The pre-bid conference will be held on April 29, 2021 for interested contractors to review project scope and site conditions. The Army National Guard is seeking energy efficient equipment that meets Unified Facilities Criteria. The contract will have a one year base period and one option year.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C :\r vt \2

8\

-0 0-

M P

_d er ek .w or le y.

rv t

2/

/2

3:

:3

P

M

INDEX OF DRAWINGS

SHEET # DESCRIPTION

00M001 GENERAL NOTES, LEGENDS, AND ABBREVIATIONS

01MD101 BUILDING 01 - FIRST FLOOR MECHANICAL DEMOLITION PLAN

01MD102 BUILDING 01 - ROOF MECHANICAL DEMOLITION PLAN

01M101 BUILDING 01 - FIRST FLOOR MECHANICAL PLAN

01M102 BUILDING 01 - ROOF MECHANICAL PLAN

03M101 BUILDING 03 - MECHANICAL PLAN

04M101 BUILDING 04 - MECHANICAL PLANS

06M101 BUILDING 06 - MECHANICAL PLAN

08MD101 BUILDING 08 - MECHANICAL DEMOLITION PLANS

08M101 BUILDING 08 - MECHANICAL PLANS

12MD101 BUILDING 12 - ROOF MECHANICAL DEMOLITION PLAN

12M101 BUILDING 12 - MECHANICAL PLANS

16M101 BUILDING 16 - MECHANICAL PLANS

30M101 BUILDING 30 - MECHANICAL PLANS

50M101 BUILDING 50 - MECHANICAL PLAN

51M101 BUILDING 51 - MECHANICAL PLAN

54M101 BUILDING 54 - MECHANICAL PLANS

60MD101 BUILDING 60 - MECHANICAL DEMOLITION PLANS

60M101 BUILDING 60 - MECHANICAL PLANS

75M101 BUILDING 75 - MECHANICAL PLANS

77M101 BUILDING 77 - MECHANICAL PLAN

81M101 BUILDING 81 - MECHANICAL PLAN

TCM101 TROOP CAMP - NEW WORK PLAN

99M001 MECHANICAL SCHEDULES

99M002 MECHANICAL SCHEDULES

99M003 MECHANICAL DETAILS

99M004 MECHANICAL DETAILS

PROJECT

LOCATION

NEW LONDON

NORTH CAROLINA

AIR NATIONAL GUARD

REPLACE HVAC SYSTEMS BASE WIDE

145th AIRLIFT WING

NEW LONDON, NC

CONTRACT NO.: W9133L-15-D-0004

TASK ORDER NO.: W91242-18-F-0130

PN: WEFM142600

B-3 DESIGN SUBMISSION

FEBRUARY 2020

BLDG 12

BLDG 30

BLDG 01

BLDG 03

BLDG 04

BLDG 06

BLDG 08

BLDG 16

DIFFUSER, GRILLE OR

REGISTER DESIGNATION TAG

AIR FLOW SCHEMATIC AND

TEMPERATURE CONTROL

DIAGRAM SYMBOLOGY

HVAC SYMBOLOGY PIPING SPECIALTIES

GENERAL NOTES

PIPING

PIPING FITTINGS

ABBREVIATIONS

SCHEMATIC SYMBOLS

SA12ø-250

SA-250

12ø

PIPE ANCHOR

PIPE GUIDE

EXPANSION JOINT

VENTURI

PRESSURE/TEMPERATURE PORT

THERMOMETER

PRESSURE GAGE

TEMPERATURE GAGE

FLEXIBLE PIPE CONNECTION

STRAINER

BLIND FLANGE

MANUAL AIR VENT

THERMOWELL

AUTOMATIC AIR VENT

REFRIGERANT LIQUIDRL

REFRIGERANT SUCTIONRS

CONDENSATE DRAINCD

ELBOW, 90°

ELBOW, 90° TURN DOWN

ELBOW, 90° TURN UP

ELBOW, 45° TURN DOWN

ELBOW, 45° TURN UP

PIPE BREAK

CAP

DIRECT

EVAPORATIVE

COOLER

DIRECT

EXPANSION

COOLING COIL

CONSTANT AIR

VOLUME BOX WITH

REHEAT COIL

VARIABLE AIR

VOLUME BOX WITH

REHEAT COIL

HOT WATER

HEATING COIL

CHILLED WATER

COOLING COIL

ELECTRIC

HEATING COIL

VFD (VARIABLE

FREQUENCY DRIVE)

GAS-FIRED

DUCT FURNACE

FREEZE STAT

FILTER SENSOR

GRAVITY DAMPER

CO2 SENSOR

GAS

ELECTRIC

ANALOG INPUT

ANALOG OUTPUT

DIGITAL INPUT

DIGITAL OUTPUT

COMMUNICATION

VARIABLE FREQUENCY DRIVE

MOTOR STARTER

DIRECT EXPANSION

MOTOR

THERMOSTAT

HUMIDISTAT

SMOKE DETECTOR

CARBON MONOXIDE SENSOR

NITROGEN DIOXIDE SENSOR

CURRENT TRANSMITTER

NATURAL GAS DETECTOR

FACE &

BYPASS COIL

DIRECT EXPANSION HEAT

PUMP

EXHAUST FAN

MOTORIZED

OPPOSED

BLADE DAMPER

SMOKE/DUCT

DETECTOR

TEMPERATURE

SENSOR

FLOW SWITCH

PRESSURE SENSOR

CURRENT TRANSMITTER

TEMPERATURE TRANSMITTER

FLOW METER

FLOW LIMITER

TEMPERATURE SWITCH

TEMPERATURE CONTROLLER

DIFFERENTIAL PRESSURE SENSOR

MOTOR ACTUATOR

FLOW MEASURING & BALANCING VALVE

W/ 100% SHUT OFF

R

SD SD

TRANSITION - ONE SIDED

TRANSITION - DOUBLE SIDED

VD, BDD

90° ELBOW TURNED UP,

RECTANGULAR

TRANSITION -

RECTANGULAR TO ROUND DUCT

STANDARD BRANCH -

FOR SUPPLY AIR W/EXTRACTOR

AND RETURN AIR W/O EXTRACTOR

RECTANGULAR DUCT INCLINE -

RISE OR DROP IN RESPECT TO

THE AIR FLOW

SPLITTER DAMPER

ROUND DUCT INCLINE -

RISE OR DROP IN RESPECT

TO THE AIR FLOW

PRESSURE/TEMPERATURE TEST

PLUG (PETE PLUG OR EQUAL)

VD

BDD

= VOLUME DAMPER

= BACKDRAFT DAMPER

ELBOW - W/TURNING VANES

(RECTANGULAR), SMOOTH RADIUS

ELBOW - W/TURNING VANE

(RECTANGULAR)

FIRE DAMPER

SMOKE DAMPER

SMOKE AND FIRE DAMPER

MOTOR OPERATED DAMPER

M

SA SOUND ATTENUATOR

DUCT ELEVATION

TAG ABOVE FINISH

FLOOR

18x10

T 9'-10" B 9'-0"

FLEXIBLE CONNECTION

FLEXIBLE DUCT

UC 3/4" UNDERCUT DOOR 3/4"

AD

AD

ACCESS DOOR

PLAN SECTION

SUPPLY AIR REGISTER OR

GRILLE - W/DUCT-MOUNTED

EXTRACTOR

EXHAUST OR RETURN AIR

REGISTER OR GRILLE

ACOUSTICAL LINING -

DUCT DIMENSIONS FOR NET

FREE AREA

RETURN AIR GRILLE

90° ELBOW TURNED UP,

RECTANGULAR

90° ELBOW TURNED UP,

ROUND

90° ELBOW TURNED UP,

ROUND

RETURN DUCT SECTION,

RECTANGULAR

SUPPLY DUCT SECTION,

RECTANGULAR

EXHAUST DUCT SECTION,

RECTANGULAR

ROUND DUCT

12x12

RECTANGULAR DUCT12x12

24x12

24x12

24x12

R

HIDDEN DUCT24x18

SUPPLY FAN

NEW CONNECTION TO

EXISTING

EXHAUST AIR GRILLE

SUPPLY DIFFUSER

(NO ARROWS INDICATE 4-WAY)

SUPPLY DIFFUSER

(ROUND)

TAG OR FLOW RATE

SIZE

12x12

12ø

12ø

LOUVER

AD ACCESS DOOR

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

AHU AIR HANDLING UNIT

AI ANALOG INPUT

ALT ALTERNATIVE

AMB AMBIENT

AO ANALOG OUTPUT

APD AIR PRESSURE DROP

ARF ABOVE RAISED FLOOR

AV AIR VALVE

AVG AVERAGE

BAS BUILDING AUTOMATION SYSTEM

BCE BASE CIVIL ENGINEERING

BHP BRAKE HORSE POWER

BDD BACK DRAFT DAMPER

BOD BOTTOM OF DUCT

BOE BOTTOM OF EQUIPMENT

BOP BOTTOM OF PIPE

BTUH BRITISH THERMAL UNITS PER HOUR

CAV CONSTANT AIR VOLUME

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CLG CEILING, COOLING

CO CLEAN OUT

CONN CONNECTION

CONT CONTINUOUS

CRAC COMPUTER ROOM AIR CONDITIONER

CU CONDENSING UNIT

DB DRY BULB

dB DECIBEL(S)

DDC DIRECT DIGITAL CONTROL

DEG F DEGREES FAHRENHEIT

DH DEHUMIDIFIER

DIA DIAMETER

DN DOWN

DX DIRECT EXPANSION

E EXISTING

EA EXAUST AIR

EAT ENTERING AIR TEMPERATURE

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

EMCS ENERGY MANAGEMENT CONTROL SYSTEM

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

F FUTURE

FA FREE AREA

FCP FAN CONTROL PANEL

FCU FAN COIL UNIT

FL FILTER, FLOOR

FLA FULL LOAD AMPS

FPB FAN POWERED BOX

FPM FEET PER MINUTE

GAL GALLONS

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HP HORSE POWER

HR HOUR

HTG HEATING

HVAC HEATING, VENTILATION, & AIR CONDITIONING

HZ HERTZ

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN INCHES

I/O INPUT/OUTPUT

I/P CURRENT TO PNEUMATIC

KEF KITCHEN EXHAUST FAN

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LB POUNDS

LV LOUVER

LWT LEAVING WATER TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH THOUSAND BTUH

MCC MOTOR CONTROL CENTER

MISC MISCELLANEOUS

MIN MINIMUM, MINUTES

MFG MANUFACTURING

MOD MOTOR OPERATED DAMPER

NC NORMALLY CLOSED, NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN, NUMBER

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

OS&Y OUTSIDE SCREW AND YOKE

PD PRESSURE DROP

PH PHASE

PLBG PLUMBING

PPH POUNDS PER HOUR

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

QTY QUANTITY

RA RETURN AIR

REQD REQUIRED

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RTU ROOFTOP UNIT

S SIGNAL PORT

SA SUPPLY AIR, SOUND ATTENUATOR

SCFM STANDARD CUBIC FEET PER MINUTE

SF SUPPLY FAN, SQUARE FEET

SP STATIC PRESSURE

SQ SQUARE

TCP TEMPERATURE CONTROL PANEL

TD TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE, TEMPORARY

TES THERMAL ENERGY STORAGE

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UH UNIT HEATER

V VOLTS

VAV VARIABLE AIR VOLUME

V&C VALVE AND CAP

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

VTR VENT THROUGH ROOF

W WATTS

WB WET BULB

WG WATER GAUGE

WPD WATER PRESSURE DROP

1. PROVIDE AND INSTALL ALL MECHANICAL SYSTEMS IN ACCORDANCE

WITH THE UNIFIED FACILITIES CRITERIA (UFC'S), 2018 NORTH CAROLINA

MECHANICAL CODE AND ALL OTHER APPLICABLE STATE AND LOCAL

CODES.

2. PROVIDE AND INSTALL ALL PLUMBING SYSTEMS IN ACCORDANCE WITH

THE 2018 INTERNATIONAL PLUMBING CODE AND ALL OTHER

APPLICABLE STATE AND LOCAL CODES.

3. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC)

ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND

GENERAL ARRANGEMENT ONLY. PLANS SHOULD NOT BE SCALED.

4. INSTALL ALL MECHANICAL AND PLUMBING EQUIPMENT AND

APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS'

RECOMMENDATIONS.

5. VERIFY ALL CLEARANCES BEFORE FABRICATING AND INSTALLING

WORK. COORDINATE WITH ALL OTHER TRADES.

6. DRAWINGS REFLECT DIMENSIONS OF DESIGN MFG. EQUIPMENT.

ALLOWABLE ALTERNATES, WHILE EQUAL IN OUTPUT CAPACITY WILL BE

THE RESPONSIBILITY OF THE CONTRACTOR TO MEET THE SPACE

REQUIREMENTS AND PROVE EQUALITY WITH DESIGN MFG. EQUIPMENT.

7. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S

CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND

PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS

TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT

AND PIPING DIMENSIONS BEFORE FABRICATION.

8. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE UFC'S AND

NFPA 70. IF WHIP/LIQUID TIGHT/CONDUIT AND CONDUCTOR ARE

DAMAGED DURING DEMO, CONTRACTOR SHALL REPLACE WITH NEW.

9. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND

AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS

OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL

CONTRACTOR.

10. PROVIDE ACCESS PANELS FOR INSTALLATION IN DUCTWORK, WALLS AND

CEILINGS, WHERE REQUIRED, TO SERVICE CONTROLS DEVICES, DAMPERS,

VALVES, DUCTWORK, SMOKE DETECTORS, AND OTHER CONCEALED

MECHANICAL EQUIPMENT. ACCESS PANEL INSTALLATION SHALL BE

COORDINATED WITH PROCESS REQUIREMENTS, ARCHITECTURAL WORK TO

MATCH MATERIALS AND FINISHES.

11. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL

STEEL SHALL BE COORDINATED WITH ALL TRADES. ALL ATTACHMENTS TO

STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS

OR AS SHOWN ON THE MECHANICAL AND STRUCTURAL DRAWINGS. PROVIDE

BEAM CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS

SHALL NOT BE PERMITTED.

12. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK AND PIPING SYSTEMS

CONNECTED TO FANS, PUMPS AND OTHER EQUIPMENT WHICH REQUIRE

VIBRATION ISOLATION.

13. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY HEATING

AND COOLING OF AFFECTED AREAS OF THE BUILDINGS DURING

CONSTRUCTION. CONTRACTOR RESPONSIBILITIES TO INCLUDE, BUT NOT

LIMITED TO, THE FOLLOWING: THE INSTALLATION, CONNECTION, AND

DISCONNECTION OF THE SERVICES. UTILITY SOURCES FOR THE TEMPORARY

SYSTEMS SHALL BE PROVIDED BY THE GOVERNMENT, CONTRACTOR

RESPONSIBLE FOR EXTENDING UTILITIES AS REQUIRED. CONTRACTOR SHALL

HAVE PRE-CONSTRUCTION MEETING WITH COR WITH PLANNED PHASING AND

MEANS OF PROVIDING TEMPORARY COOLING AND HEATING TO OBTAIN

APPROVAL OF PLAN PRIOR TO STARTING CONSTRUCTION. DEMOLITION OF

EXISTING SYSTEMS SHOULD NOT COMMENCE UNTIL TEMPORARY SYSTEMS ARE

IN PLACE AND THE COR HAS INSPECTED AND APPROVED THE TEMPORARY

SYSTEMS. CONTRACTOR SHALL COMPLETE CONSTRUCTION IN PHASES SUCH

THAT DOWNTIME IS MINIMIZED.

PA

PG

PT

C

C

H

C

EP

R

D

X

EH

C

FB

C

VFD

H

C

CAV

H

C

VAV

EF

SF

GAS

ELECT

AI

AO

DI

DO

COMM

CT

STARTER

VFD

HP

DX

M

T

H

CO

NO2

S

NG

M

F

P

DP

CT

T

TS

TC

FM

A

T

S

T

FRZ

ΔP

M

CO2

DIFFERENTIAL PRESSURE SENSORDP

DEMOLITION NOTES

1. THE SCOPE OF WORK IS LIMITED TO THE

RENOVATION/REPLACEMENT OF A PORTION OF THE

EXISTING MECHANICAL EQUIPMENT. HVAC WORK

INCLUDES CONDUCTING A TEST AND BALANCE REPORT

PRIOR TO AND AFTER CONSTRUCTION, DUCTWORK

MODIFICATIONS TO MEET THE RENOVATED SPACE/SYSTEMS

REQUIREMENTS, AND THE ADDITION OF ANY OTHER

ARCHITECTURAL ELEMENTS REQUIRED AS INDICATED ON

DRAWINGS.

2. PRIOR TO THE START OF CONSTRUCTION OR DEMOLITION

WORK, A CERTIFIED TEST AND BALANCE REPORT SHALL BE

SUBMITTED TO THE ENGINEER. THE TEST AND BALANCE

REPORT SHALL INCLUDE THE FOLLOWING FROM THE

EXISTING AIR HANDLING UNIT TO BE REPLACED. MEASURE

AND RECORD FROM THE SUPPLY AIRFLOW FROM THE AHU,

OUTSIDE AIRFLOW RATE TO THE AHU, AND RETURN

AIRFLOW TO THE UNIT.

3. SYSTEMS SHALL BE ADJUSTED TO ACHIEVE THE MEASURED

AIRFLOW RATES AS EXISTING EQUIPMENT PRIOR TO

DEMOLITION OR AS INDICATED ON PLANS. WORK SHALL

INCLUDE ADDING ANY BALANCING DAMPERS WITHIN

EXISTING OR NEW DUCTWORK, CHANGING BELTS AND

SHEAVES NECESSARY TO THE AHU TO ACHIEVE AIRFLOW

RATES. AT POINT OF SUBSTANTIAL COMPLETION,

CONTRACTOR SHALL TEST, ADJUST AND BALANCE THE

SYSTEM AND SUBMIT A CERTIFIED REPORT TO THE

ENGINEER INDICATING THE FOLLOWING: SUPPLY AIR FLOW

FROM THE NEW AHU, OUTSIDE AIR FLOW TO THE NEW AHU,

AND RETURN AIR FLOW FROM THE SPACE.

4. DRAWINGS WERE PREPARED IN PART BASED ON EXISTING

AS-BUILTS DRAWINGS AND NON-DESTRUCTIVE FIELD

WORK. EXISTING MECHANICAL DUCTWORK AND PIPING

SHOWN IS SCHEMATIC AND MAY NOT NECESSARILY

REPRESENT EXACT LOCATIONS.

5. EXISTING MECHANICAL DUCTWORK AND PIPING NOT

ASSOCIATED WITH THE RENOVATION IS NOT SHOWN AND

SHALL REMAIN IN SERVICE.

6. FIELD VERIFY EXISTING CONDITIONS AND REPORT

DISCREPANCIES TO THE GOVERNMENT/ENGINEER BEFORE

COMMENCING WORK.

7. ALL MATERIALS AND EQUIPMENT BEING REMOVED UNDER

DEMOLITION SHALL BECOME THE PROPERTY OF THE

CONTRACTOR AND SHALL BE DISPOSED OF OFF SITE,

UNLESS OTHERWISE NOTED. UNITS INDICATED FOR

REMOVAL SHALL BE DISPOSED OF AS RECYCLED

MATERIALS AND SHALL NOT TO BE REUSED ELSEWHERE.

REFER TO DIVISION 1 SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND TRACKING REQUIREMENTS.

8. REFER TO DIVISION 1 SPECIFICATIONS FOR REQUIREMENTS

AND INSTRUCTIONS ON THE RECLAMATION AND DISPOSAL

OF ALL REFRIGERANT. ALL DISPOSAL SHALL BE THE

RESPONSIBILITY OF THE GOVERNMENT. CONTRACTOR

RESPONSIBLE FOR RECLAIMING AND TRACKING (UNIT,

POUNDS, AND OUNCES) AND COORDINATING WITH

BCE/ENVIRONMENTAL FOR TURNOVER. THE BCE WILL

PROVIDE THE CONTRACTOR WITH CONTAINERS FOR

RECLAIMED REFRIGERANT WHICH WILL BE TURNED OVER

WHEN FULL.

9. EXISTING HVAC EQUIPMENT/COMPONENTS TO BE REPLACED

WITH NEW EQUIPMENT/COMPONENT OF LIKE OR SIMILAR

ELECTRICAL REQUIREMENTS. NEW

EQUIPMENT/COMPONENTS SHALL BE CONNECTED TO THE

EXISTING CIRCUIT AND DISCONNECT REMAINING AFTER

DEMOLITION. REFER TO NEW WORK DRAWINGS FOR

FURTHER CLARIFICATION.

10. DISCONNECT ELECTRICAL SERVICES TO ELECTRICAL

DEVICES THAT ARE NOTED TO BE REMOVED. WIRE AND

CONDUIT TO BE REMOVED BACK TO THE FIRST TERMINATION

POINT WHICH IS TO REMAIN.

POINT OF DEMOLITION

NONE

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

00M001

N. OVERBY

10137117-00-MP.rvt

GENERAL NOTES, LEGENDS, AND ABBREVIATIONS

FEB 2020 B-3 DESIGN SUBMITTAL

NO WORK IN THIS AREANO WORK IN THIS AREA

PU-1 INSTALLED ABOVE CEILING.

EXISTING PACKAGED UNIT TO BE

REMOVED. DUCTWORK AND ALL OTHER

MATERIALS SHALL REMAIN.

REMOVE EXISTING

REFRIGERANT LINES.

REMOVE EXISTING

FURNACE. ALL ASSOCIATED

DUCTWORK, GAS PIPING,

COMBUSTION AIR INTAKE,

FLUES, AND CONTROLS

SHALL REMAIN. (TYP)

POWER

PRODUCTION

ALO

ALO

SUPPLY

OFFICER

ELEC. /COMM

COPY ROOM

MEN

1ST SARGENT

COMMANDER'S

CONF.ROOM

COMMANDER

SQUADRON

SUPERVISOR

PERSONNEL

STOR

RECEPT/INFO

MGMT.OFFICE

PERSONNEL

OFFICE

WOMEN

CORR

MECHANICAL

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

3/32" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

01MD101

N. OVERBY

10137117-00-MP.rvt

FIRST FLOOR MECHANICAL DEMOLITION PLAN

BUILDING 01

NO WORK IN THIS AREA

1 (TYP)

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

3/32" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

01MD102

N. OVERBY

10137117-00-MP.rvt

ROOF MECHANICAL DEMOLITION PLAN

BUILDING 01

KEYNOTES

1 EXISTING CONDENSING UNITS AND ASSOCIATED

REFRIGERANT LINES TO BE REMOVED. EXISTING

ELECTRICAL CONDUIT, WIRING, AND

DISCONNECTS TO REMAIN. ROOF PENETRATIONS

TO BE REUSED.

01AH-2

01AH-3

01AH-1

01GF-4

REFRIGERANT LINES TO UTILIZE

EXISTING PENETRATIONS AND

ROUTE DOWN FROM CONDENSING

UNITS LOCATED ON ROOF (TYP)

8ø 01AH-4

12x14

16x16

01AH-4 INSTALLED ON MEZZANINE ABOVE

RM135. 8"OA DUCT TO ROUTE UP WALL AND

THRU TO ROOF. SUPPLY AND RETURN

DUCTWORK TO PENETRATE SLAB AND

CONNECT TO EXISTING DUCTWORK BELOW.

REFER TO DETAIL #6/99M004

REFRIGERANT LINE

UP TO 01HP-4

LOCATED ON ROOF.

LOCATE FURNACES IN SAME

LOCATION AS DEMOLISHED AND

CONNECT BACK TO EXISTING

DUCTWORK, GAS PIPE, COMBUSTION

AIR INTAKE, FLUE, CONDENSATE AND

CONTROLS. PROVIDE FLEXIBLE

CONNECTION BETWEEN GAS

FURNACE AND DUCTWORK. PROVIDE

TRANSITION AS REQUIRED FOR

CONNECTION TO EXISTING

DUCTWORK (TYP)

ELEC. /COMM

128 LOBBY/

WAITING

PERSONNEL

SQUADRON

SUPERVISOR

COMMANDER

COMMANDER'S

CONF.ROOM

1ST SARGENT

108POWER

PRODUCTION

ALO

ALO

SUPPLY

OFFICER

MEN

RECEPT/INFO

MGMT.OFFICE

MECHANICAL

STOR

WOMEN

JAN

CORR

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

3/32" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

01M101

N. OVERBY

10137117-00-MP.rvt

FIRST FLOOR MECHANICAL PLAN

BUILDING 01

KEYNOTES

1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL

NEW AND EXISTING MECHANICAL EQUIPMENT

SHALL BE TIED IN AND VISIBLE ON THE EXISTING

FRONT END.

2 SMART METER ON EXISTING PROPANE SERVICE.

COORDINATE TYPES AND DESIGNS WITH

GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE DOWNLOADING OF DATA.

3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH

IN ACCORDANCE WITH SECTION 3-19, UFC

4-010-011 "STANDARD 18". SWITCH TO BE

LOCATED WITHIN THE BUILDING AND VISIBLE TO

ALL OCCUPANTS. COORDINATE FINAL LOCATION

OF SWITCH WITH GOVERNMENT. EMERGENCY

SHUTOFF SWITCH SHALL BE TIED INTO BUILDING

BAS CONTROLLER/ROUTER AND INITIATE SHUT

DOWN OF ALL HVAC EQUIPMENT AND CLOSURE

OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN

30 SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY

TIED TO THE FRONT END FOR VISIBILITY AND

CONTROL WITHIN THE BAS. NOTIFY

GOVERNMENT/COR OF EXISTING CONDITIONS

AND CURRENT OPERATION.

01HP-1

01HP-2

01CU-4

01HP-3

REFRIGERANT LINES ROUTED

DOWN THRU EXISTING ROOF

PENETRATIONS. (TYP)

01HP-4

8"OA DUCT UP THRU

ROOF. TERMINATE WITH

BIRD SCREEN AND

HOODED ROOF CAP.

CONDENSING UNIT TO BE

INSTALLED ON EXISTING RAILS

(TYP)

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

3/32" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

01M102

N. OVERBY

10137117-00-MP.rvt

ROOF MECHANICAL PLAN

BUILDING 01

GENERAL NOTE:

A. ALL ROOF WORK AND PENETRATIONS SHALL BE

EXECUTED BY A CERTIFIED ROOFER WITH THE

APPROVAL OF THE GOVERNMENT/COR.

ELEC

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/8" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

03M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLAN

BUILDING 03

KEYNOTES

1 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO COMMUNICATIONS

RESTRICTIONS, NOTIFY COR AND ENSURE THAT

METER IS ACCESSIBLE FOR REMOTE

DOWNLOADING OF DATA.

2 SMART METER ON EXISTING PROPANE SERVICE.

COORDINATE TYPES AND DESIGNS WITH

GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO COMMUNICATIONS

RESTRICTIONS, NOTIFY COR AND ENSURE THAT

METER IS ACCESSIBLE FOR REMOTE

DOWNLOADING OF DATA.

3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH IN

ACCORDANCE WITH SECTION 3-19, UFC 4-010-011

"STANDARD 18". SWITCH TO BE LOCATED WITHIN

THE BUILDING AND VISIBLE TO ALL OCCUPANTS.

COORDINATE FINAL LOCATION OF SWITCH WITH

GOVERNMENT. EMERGENCY SHUTOFF SWITCH

SHALL BE TIED INTO BUILDING BAS

CONTROLLER/ROUTER AND INITIATE SHUT DOWN

OF ALL HVAC EQUIPMENT AND CLOSURE OF ALL

OUTSIDE AIR DAMPERS/LOUVERS WITHIN 30

SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY TIED

TO THE FRONT END FOR VISIBILITY AND CONTROL

WITHIN THE BAS. NOTIFY GOVERNMENT/COR OF

EXISTING CONDITIONS AND CURRENT

OPERATION.

REMOVE REFRIGERANT

LINES. WALL PENETRATIONS

TO REMAIN FOR REUSE.

(TYP)

REMOVE EXISTING

FURNACE. ALL ASSOCIATED

DUCTWORK, GAS PIPING,

COMBUSTION AIR INTAKE,

FLUES, AND CONTROLS

SHALL REMAIN. (TYP)

EXISTING PTAC UNIT TO BE

REMOVED. WALL PENETRATION

TO REMAIN FOR REUSE.

MECHANICAL

EXISTING CONDENSING UNIT

(CU-2) TO BE REMOVED

EXISTING CONDENSING UNIT

(CU-1) TO BE REMOVED

04CU-2

04AH-2

04AH-1

04CU-1

LOCATE FURNACES IN SAME

LOCATION AS DEMOLISHED

AND CONNECT BACK TO

EXISTING DUCTWORK, GAS

PIPE, COMBUSTION AIR

INTAKE, FLUE, CONDENSATE

AND CONTROLS. PROVIDE

FLEXIBLE CONNECTION

BETWEEN GAS FURNACE AND

DUCTWORK. PROVIDE

TRANSITION AS REQUIRED

FOR CONNECTION TO

EXISTING DUCTWORK (TYP)

HEAT PUMP UNITS ON EXISTING

CONCRETE PADS. EXTEND PAD AS

NECESSARY SUCH THAT PAD

EXTENDS 6" BEYOND THE FOOTPRINT

OF THE UNIT.(TYP)

04PTAC-1

PTAC UNIT TO BE INSTALLED IN

EXISTING WALL PENETRATION.

CONTRACTOR TO ALTER WALL

OPENING AS NECESSARY

MECHANICAL

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/8" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

04M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLANS

BUILDING 04

1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN

1/8" = 1'-0"

MECHANICAL PLAN

KEYNOTES

1 BACNET ROUTER, TEMPERATURE SENSOR AND

DOOR SWITCHES. ROUTER SHALL COMMUNICATE

WITH EXISTING BAS CONTROLLER LOCATED IN

BUILDING 1.

2 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO COMMUNICATIONS

RESTRICTIONS, NOTIFY COR AND ENSURE THAT

METER IS ACCESSIBLE FOR REMOTE

DOWNLOADING OF DATA.

3 SMART METER ON EXISTING PROPANE SERVICE.

COORDINATE TYPES AND DESIGNS WITH

GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO COMMUNICATIONS

RESTRICTIONS, NOTIFY COR AND ENSURE THAT

METER IS ACCESSIBLE FOR REMOTE

DOWNLOADING OF DATA.

4 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH IN

ACCORDANCE WITH SECTION 3-19, UFC 4-010-011

"STANDARD 18". SWITCH TO BE LOCATED WITHIN

THE BUILDING AND VISIBLE TO ALL OCCUPANTS.

COORDINATE FINAL LOCATION OF SWITCH WITH

GOVERNMENT. EMERGENCY SHUTOFF SWITCH

SHALL BE TIED INTO BUILDING BAS

CONTROLLER/ROUTER AND INITIATE SHUT DOWN

OF ALL HVAC EQUIPMENT AND CLOSURE OF ALL

OUTSIDE AIR DAMPERS/LOUVERS WITHIN 30

SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY TIED

TO THE FRONT END FOR VISIBILITY AND CONTROL

WITHIN THE BAS. NOTIFY GOVERNMENT/COR OF

EXISTING CONDITIONS AND CURRENT

OPERATION.

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

3/16" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

06M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLAN

BUILDING 06

KEYNOTES

1 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO COMMUNICATIONS

RESTRICTIONS, NOTIFY COR AND ENSURE THAT

METER IS ACCESSIBLE FOR REMOTE

DOWNLOADING OF DATA.

2 SMART METER ON EXISTING PROPANE SERVICE.

COORDINATE TYPES AND DESIGNS WITH

GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO COMMUNICATIONS

RESTRICTIONS, NOTIFY COR AND ENSURE THAT

METER IS ACCESSIBLE FOR REMOTE

DOWNLOADING OF DATA.

3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH IN

ACCORDANCE WITH SECTION 3-19, UFC 4-010-011

"STANDARD 18". SWITCH TO BE LOCATED WITHIN

THE BUILDING AND VISIBLE TO ALL OCCUPANTS.

COORDINATE FINAL LOCATION OF SWITCH WITH

GOVERNMENT. EMERGENCY SHUTOFF SWITCH

SHALL BE TIED INTO BUILDING BAS

CONTROLLER/ROUTER AND INITIATE SHUT DOWN

OF ALL HVAC EQUIPMENT AND CLOSURE OF ALL

OUTSIDE AIR DAMPERS/LOUVERS WITHIN 30

SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY TIED

TO THE FRONT END FOR VISIBILITY AND CONTROL

WITHIN THE BAS. NOTIFY GOVERNMENT/COR OF

EXISTING CONDITIONS AND CURRENT

OPERATION.

NO WORK IN THIS AREA NO WORK IN THIS AREA

08MD101

REMOVE EXISTING

FURNACE. ALL ASSOCIATED

DUCTWORK, GAS PIPING,

COMBUSTION AIR INSTAKE,

FLUES, AND CONTROLS

SHALL REMAIN. (TYP)

REMOVE EXISTING REFRIGERANT

LINES. WALL PENETRATION

SHALL REMAIN FOR REUSE. (TYP)

REMOVE EXISTING CONDENSING

UNIT AND ASSOCIATED

REFRIGERANT LINES. WALL

PENETRATION SHALL REMAIN

FOR REUSE. (TYP)

AS NOTED

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

08MD101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL DEMOLITION PLANS

BUILDING 08

- 1/4" = 1'-0"

1 ENLARGED MECHANICAL DEMOLITION PLAN

NO WORK IN THIS AREA NO WORK IN THIS AREA

08M101

8GF-1

8GF-4 8GF-2

8GF-3

8CU-28CU-38CU-18CU-4

LOCATE FURNACES IN SAME LOCATION AS

DEMOLISHED AND CONNECT BACK TO

EXISTING DUCTWORK, GAS PIPE, COMBUSTION

AIR INTAKE, FLUE, CONDENSATE AND

CONTROLS. PROVIDE FLEXIBLE CONNECTION

BETWEEN GAS FURNACE AND DUCTWORK.

PROVIDE TRANSITION AS REQUIRED FOR

CONNECTION TO EXISTING DUCTWORK (TYP)

RL/RS

(TYP)

HEAT PUMP UNITS ON EXISTING

CONCRETE PADS. EXTEND PAD AS

NECESSARY SUCH THAT PAD

EXTENDS 6" BEYOND THE FOOTPRINT

OF THE UNIT.(TYP)

AS NOTED

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:3

P M

08M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLANS

BUILDING 08

1/16" = 1'-0"

BUILDING 08 OVERALL PLAN

- 1/4" = 1'-0"

1 ENLARGED MECHANICAL PLAN

ROUTE REFRIGERANT LINES THRU

EXISTING WALL PENETRATIONS. (TYP)

KEYNOTES

1 BACNET ROUTER, TEMPERATURE SENSOR AND

DOOR SWITCHES. ROUTER SHALL COMMUNICATE

WITH EXISTING BAS CONTROLLER LOCATED IN

BUILDING 3.

2 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO COMMUNICATIONS

RESTRICTIONS, NOTIFY COR AND ENSURE THAT

METER IS ACCESSIBLE FOR REMOTE

DOWNLOADING OF DATA.

3 SMART METER ON EXISTING PROPANE SERVICE.

COORDINATE TYPES AND DESIGNS WITH

GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO COMMUNICATIONS

RESTRICTIONS, NOTIFY COR AND ENSURE THAT

METER IS ACCESSIBLE FOR REMOTE

DOWNLOADING OF DATA.

4 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH IN

ACCORDANCE WITH SECTION 3-19, UFC 4-010-011

"STANDARD 18". SWITCH TO BE LOCATED WITHIN

THE BUILDING AND VISIBLE TO ALL OCCUPANTS.

COORDINATE FINAL LOCATION OF SWITCH WITH

GOVERNMENT. EMERGENCY SHUTOFF SWITCH

SHALL BE TIED INTO BUILDING BAS

CONTROLLER/ROUTER AND INITIATE SHUT DOWN

OF ALL HVAC EQUIPMENT AND CLOSURE OF ALL

OUTSIDE AIR DAMPERS/LOUVERS WITHIN 30

SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY TIED

TO THE FRONT END FOR VISIBILITY AND CONTROL

WITHIN THE BAS. NOTIFY GOVERNMENT/COR OF

EXISTING CONDITIONS AND CURRENT

OPERATION.

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

REMOVE EXISTING

REFRIGERANT LINES

DOWN FROM ABOVE

OPEN TO BELOW

REMOVE EXISTING FURNACE.

ALL ASSOCIATED DUCTWORK,

GAS PIPING, COMBUSTION AIR

INSTAKE, FLUES, AND

CONTROLS SHALL REMAIN.

(TYP)

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/16" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

12MD101

N. OVERBY

10137117-00-MP.rvt

ROOF MECHANICAL DEMOLITION PLAN

BUILDING 12

1/16" = 1'-0"

ROOF MECHANICAL DEMOLITION PLAN

KEYNOTES

1 EXISTING CONDENSING UNITS AND ASSOCIATED

REFRIGERANT LINES TO BE REMOVED. EXISTING

ELECTRICAL CONDUIT, WIRING, AND

DISCONNECTS TO REMAIN. ROOF PENETRATIONS

TO BE REUSED.

2 EXISTING ROOFTOP UNIT AND ASSOCIATED

CONTROLS TO BE REMOVED. ALL ELECTRICAL

CONDUIT, WIRING, AND DISCONNECT TO REMAIN

FOR REUSE.

3 REFRIGERANT PIPING TO BE REMOVED. MAINTAIN

REFRIGERANT VAULT AND ROOF PENETRATION

FOR REUSE.

4 ALL INDICATED ROOF MOUNTED EQUIPMENT TO

BE REMOVED. ROOF CURBS AND PENETRATIONS

TO BE REUSED.

1/16" = 1'-0"

MEZZANINE MECHANICAL DEMOLITION PLAN

12CU-3

12CU-6

12CU-5

12CU-1

12CU-4

REFRIGERANT LINES DOWN

THROUGH EXISTING ROOF

PENETRATION TO

MEZZANINE LEVEL BELOW

12MSCU-9

12RTU-4

12RTU-3

12RTU-2

12RTU-1

12RTU-8

12RTU-7

12RTU-5

12RTU-2-1

12RTU-2-2

12RTU-1-1

12RTU-1-2

12RTU-2-3

EXISTING PROPANE

LINES TO REMAIN (TYP)

PROPANE SMART

METER THIS LOCATION

ON FIRST FLOOR

12RTU-6

EXISTING PROPANE

UP FROM BELOW

LOCATE ALL ROOF TOP UNITS SUCH

THAT EXISTING SUPPLY AND

RETURN DUCT PENETRATIONS ARE

USED. PROVIDE CURB ADAPTER AS

REQUIRED (TYP)

REFRIGERANT LINES

DOWN THROUGH

EXISTING ROOF

PENETRATION

GF-4

GF-1

GF-3

GF-5

GF-6

OPEN TO BELOW

LOCATE FURNACES IN SAME LOCATION AS

DEMOLISHED AND CONNECT BACK TO EXISTING

DUCTWORK, GAS PIPE, COMBUSTION AIR INTAKE,

FLUE, CONDENSATE AND CONTROLS. PROVIDE

FLEXIBLE CONNECTION BETWEEN GAS FURNACE

AND DUCTWORK. PROVIDE TRANSITION AS

REQUIRED FOR CONNECTION TO EXISTING

DUCTWORK (TYP)

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/16" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

12M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLANS

BUILDING 12

1/16" = 1'-0"

ROOF MECHANICAL PLAN

KEYNOTES

1 WALL MOUNTED INDOOR UNIT LOCATED ON

FIRST FLOOR IN ROOM 128.

2 SMART METER ON EXISTING PROPANE SERVICE.

COORDINATE TYPES AND DESIGNS WITH

GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE DOWNLOADING OF DATA.

3 EXISTING LIGHTNING PROTECTION CABLES AND

SYSTEM TO BE REINSTALLED UPON COMPLETION

OF ROOFTOP UNIT INSTALLATION.

4 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH

IN ACCORDANCE WITH SECTION 3-19, UFC

4-010-011 "STANDARD 18". SWITCH TO BE

LOCATED WITHIN THE BUILDING AND VISIBLE TO

ALL OCCUPANTS. COORDINATE FINAL LOCATION

OF SWITCH WITH GOVERNMENT. EMERGENCY

SHUTOFF SWITCH SHALL BE TIED INTO BUILDING

BAS CONTROLLER/ROUTER AND INITIATE SHUT

DOWN OF ALL HVAC EQUIPMENT AND CLOSURE

OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN

30 SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY

TIED TO THE FRONT END FOR VISIBILITY AND

CONTROL WITHIN THE BAS. NOTIFY

GOVERNMENT/COR OF EXISTING CONDITIONS

AND CURRENT OPERATION.

1/16" = 1'-0"

MEZZANINE MECHANICAL PLAN

EXISTING WALL MOUNTED PACKAGED UNIT AND

ASSOCIATED CONTROLS TO BE REMOVED. ALL

ELECTRICAL CONDUIT, WIRING , AND DISCONNECTS

TO REMAIN FOR REUSE. (TYP)

16WMU-2

16WMU-2

PACKAGED UNIT SHALL BE

INSTALLED TO UTILIZE EXISTING

WALL PENETRATIONS (TYP)

1 2

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/4" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

16M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLANS

BUILDING 16

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN

1/4" = 1'-0"

MECHANICAL PLAN

KEYNOTES

1 BACNET ROUTER, TEMPERATURE SENSOR, AND

THERMOSTAT (ALERTON MODEL:VLC/D).

ROUTER SHALL COMMUNICATE WITH EXISTING

BAS CONTROLLER LOCATED IN BUILDING 3.

2 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH

IN ACCORDANCE WITH SECTION 3-19, UFC

4-010-011 "STANDARD 18". SWITCH TO BE

LOCATED WITHIN THE BUILDING AND VISIBLE TO

ALL OCCUPANTS. COORDINATE FINAL LOCATION

OF SWITCH WITH GOVERNMENT. EMERGENCY

SHUTOFF SWITCH SHALL BE TIED INTO BUILDING

BAS CONTROLLER/ROUTER AND INITIATE SHUT

DOWN OF ALL HVAC EQUIPMENT AND CLOSURE

OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN

30 SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY

TIED TO THE FRONT END FOR VISIBILITY AND

CONTROL WITHIN THE BAS. NOTIFY

GOVERNMENT/COR OF EXISTING CONDITIONS

AND CURRENT OPERATION.

REMOVE EXISTING AIR

HANDLER. ALL ASSOCIATED

DUCTWORK AND CONTROLS

SHALL REMAIN. (TYP)

EXISTING HEAT PUMPS AND ASSOCIATED

REFRIGERANT LINES TO BE REMOVED. ALL

ELECTRICAL CONDUIT, WIRING, AND

DISCONNECTS TO REMAIN FOR REUSE.

(TYP)

30HP-2

30HP-1

30AH-2

30AH-1

NEW REFRIGERANT LINES SHALL

BE ROUTED THROUGH EXISTING

WALL PENETRATIONS (TYP)

NEW HEAT PUMP UNIT SHALL

BE INSTALLED ON EXISTING

CONCRETE APRON. (TYP)

LOCATE AIR HANDLERS IN SAME LOCATION AS

DEMOLISHED AND CONNECT BACK TO EXISTING

DUCTWORK, CONDENSATE AND CONTROLS.

PROVIDE FLEXIBLE CONNECTION BETWEEN AIR

HANDLER AND DUCTWORK. PROVIDE TRANSITION AS

REQUIRED FOR CONNECTION TO EXISTING

DUCTWORK (TYP)

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/4" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

30M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLANS

BUILDING 30

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN

1/4" = 1'-0"

MECHANICAL PLAN

KEYNOTES

1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL

NEW AND EXISTING MECHANICAL EQUIPMENT

SHALL BE TIED IN AND VISIBLE ON THE EXISTING

FRONT END.

2 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE DOWNLOADING OF DATA.

3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH

IN ACCORDANCE WITH SECTION 3-19, UFC

4-010-011 "STANDARD 18". SWITCH TO BE

LOCATED WITHIN THE BUILDING AND VISIBLE TO

ALL OCCUPANTS. COORDINATE FINAL LOCATION

OF SWITCH WITH GOVERNMENT. EMERGENCY

SHUTOFF SWITCH SHALL BE TIED INTO BUILDING

BAS CONTROLLER/ROUTER AND INITIATE SHUT

DOWN OF ALL HVAC EQUIPMENT AND CLOSURE

OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN

30 SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY

TIED TO THE FRONT END FOR VISIBILITY AND

CONTROL WITHIN THE BAS. NOTIFY

GOVERNMENT/COR OF EXISTING CONDITIONS

AND CURRENT OPERATION.

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/4" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

50M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLAN

BUILDING 50

KEYNOTES

1 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE DOWNLOADING OF DATA.

2 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH

IN ACCORDANCE WITH SECTION 3-19, UFC

4-010-011 "STANDARD 18". SWITCH TO BE

LOCATED WITHIN THE BUILDING AND VISIBLE TO

ALL OCCUPANTS. COORDINATE FINAL LOCATION

OF SWITCH WITH GOVERNMENT. EMERGENCY

SHUTOFF SWITCH SHALL BE TIED INTO BUILDING

BAS CONTROLLER/ROUTER AND INITIATE SHUT

DOWN OF ALL HVAC EQUIPMENT AND CLOSURE

OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN

30 SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY

TIED TO THE FRONT END FOR VISIBILITY AND

CONTROL WITHIN THE BAS. NOTIFY

GOVERNMENT/COR OF EXISTING CONDITIONS

AND CURRENT OPERATION.

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/4" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

51M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLAN

BUILDING 51

KEYNOTES

1 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE DOWNLOADING OF DATA.

2 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH

IN ACCORDANCE WITH SECTION 3-19, UFC

4-010-011 "STANDARD 18". SWITCH TO BE

LOCATED WITHIN THE BUILDING AND VISIBLE TO

ALL OCCUPANTS. COORDINATE FINAL LOCATION

OF SWITCH WITH GOVERNMENT. EMERGENCY

SHUTOFF SWITCH SHALL BE TIED INTO BUILDING

BAS CONTROLLER/ROUTER AND INITIATE SHUT

DOWN OF ALL HVAC EQUIPMENT AND CLOSURE

OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN

30 SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY

TIED TO THE FRONT END FOR VISIBILITY AND

CONTROL WITHIN THE BAS. NOTIFY

GOVERNMENT/COR OF EXISTING CONDITIONS

AND CURRENT OPERATION.

TRAINING 2

JAN CL

122 ELEC

Room

VEST

CORR

STORAGE

OFFICE

TRAINING 1

CONTROL CAB

COMM

OFFICE

REMOVE EXISTING CONDENSING

UNIT AND ASSOCIATED

REFRIGERANT LINES. (TYP)

AIR HANDLERS LOCATED

ON PLATFORM IN ATTIC

TO BE REMOVED.

54HP-154HP-2

54AH-2

54AH-1

LOCATE AIR HANDLERS IN SAME LOCATION AS

DEMOLISHED AND CONNECT BACK TO EXISTING

DUCTWORK, CONDENSATE AND CONTROLS.

PROVIDE FLEXIBLE CONNECTION BETWEEN AIR

HANDLER AND DUCTWORK. PROVIDE TRANSITION

AS REQUIRED FOR CONNECTION TO EXISTING

DUCTWORK. FILTERS SHALL BE REMOVED FROM

THE AIR HANDLING UNITS AND (TYP)

REFRIGERANT LINES SHALL BE

ROUTED THROUGH EXISTING

WALL PENETRATIONS (TYP)

TRAINING 2

CONTROL CAB

COMM

TRAINING 1

OFFICE

OFFICE

CORR

STORAGE

VEST

Room

ELEC

JAN CL

HEAT PUMP UNITS ON EXISTING

CONCRETE PADS. EXTEND PAD AS

NECESSARY SUCH THAT PAD

EXTENDS 6" BEYOND THE FOOTPRINT

OF THE UNIT.(TYP)

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/4" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

54M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLANS

BUILDING 54

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN

1/4" = 1'-0"

MECHANICAL PLAN

KEYNOTES

1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL

NEW AND EXISTING MECHANICAL EQUIPMENT

SHALL BE TIED IN AND VISIBLE ON THE EXISTING

FRONT END.

2 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE DOWNLOADING OF DATA.

3 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH

IN ACCORDANCE WITH SECTION 3-19, UFC

4-010-011 "STANDARD 18". SWITCH TO BE

LOCATED WITHIN THE BUILDING AND VISIBLE TO

ALL OCCUPANTS. COORDINATE FINAL LOCATION

OF SWITCH WITH GOVERNMENT. EMERGENCY

SHUTOFF SWITCH SHALL BE TIED INTO BUILDING

BAS CONTROLLER/ROUTER AND INITIATE SHUT

DOWN OF ALL HVAC EQUIPMENT AND CLOSURE

OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN

30 SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY

TIED TO THE FRONT END FOR VISIBILITY AND

CONTROL WITHIN THE BAS. NOTIFY

GOVERNMENT/COR OF EXISTING CONDITIONS

AND CURRENT OPERATION.

REMOVE EXISTING AIR

HANDLER. ALL ASSOCIATED

DUCTWORK AND CONTROLS

SHALL REMAIN. (TYP)

STAIR

VEST

ELEC

REMOVE EXISTING

CONDENSING UNIT AND

ASSOCIATED REFRIGERANT

LINES. (TYP)

REMOVE EXISTNG AIR

HANDLER. ALL ASSOCIATED

DUCTWORK AND CONTROLS

SHALL REMAIN. (TYP)

STAIR

EQUIPMENT/

MECHANICAL

RL/RS (TYP)

STAIR

OFFICE

TOILET

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/4" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

60MD101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL DEMOLITION PLANS

BUILDING 60

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - FIRST FLOOR

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - THIRD FLOOR

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - SECOND FLOOR

60HP-3

60HP-2

60HP-1

60AH-1

STAIR

VEST

ELEC

HEAT PUMP UNITS ON EXISTING

CONCRETE PADS. EXTEND PAD AS

NECESSARY SUCH THAT PAD

EXTENDS 6" BEYOND THE

FOOTPRINT OF THE UNIT.(TYP)

60AH-2

60AH-3

STAIR

EQUIPMENT/

MECHANICAL

LOCATE AIR HANDLERS IN

SAME LOCATION AS

DEMOLISHED AND CONNECT

BACK TO EXISTING

DUCTWORK, CONDENSATE

AND CONTROLS. PROVIDE

FLEXIBLE CONNECTION

BETWEEN AIR HANDLER AND

DUCTWORK. PROVIDE

TRANSITION AS REQUIRED FOR

CONNECTION TO EXISTING

DUCTWORK (TYP)

RL/RS TO BE ROUTED UP

EXTERIOR FACE OF BUILDING

AND CONCEALED BY GUTTER.

COORDINATE COLOR/FINISH OF

GUTTER WITH BASE CIVIL

ENGINEERING

OFFICE

STAIR

TOILET

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/4" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

60M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLANS

BUILDING 60

1/4" = 1'-0"

MECHANICAL PLAN - FIRST FLOOR

1/4" = 1'-0"

MECHANICAL PLAN - THIRD FLOOR

1/4" = 1'-0"

MECHANICAL PLAN - SECOND FLOOR

KEYNOTES

1 BACNET ROUTER, TEMPERATURE SENSOR, AND

THERMOSTAT (ALERTON MODEL:VLC/D).

ROUTER SHALL COMMUNICATE WITH EXISTING

BAS CONTROLLER LOCATED IN BUILDING 54.

2 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE DOWNLOADING OF DATA.

3 CONTRACTOR TO COORDINATE WITH COR, BASE

CIVIL ENGINEERING, AND END USER FOR THE

INSTALLATION OF THIS AIR HANDLER.

4 PROVIDE EMERGENCY HVAC SHUTOFF SWITCH

IN ACCORDANCE WITH SECTION 3-19, UFC

4-010-011 "STANDARD 18". SWITCH TO BE

LOCATED WITHIN THE BUILDING AND VISIBLE TO

ALL OCCUPANTS. COORDINATE FINAL LOCATION

OF SWITCH WITH GOVERNMENT. EMERGENCY

SHUTOFF SWITCH SHALL BE TIED INTO BUILDING

BAS CONTROLLER/ROUTER AND INITIATE SHUT

DOWN OF ALL HVAC EQUIPMENT AND CLOSURE

OF ALL OUTSIDE AIR DAMPERS/LOUVERS WITHIN

30 SECONDS OF ACTIVATION. REFER TO DETAIL

#4/99M004 FOR MORE INFORMATION. IF

EMERGENCY SHUT-OFF SWITCH IS ALREADY

PRESENT WITHIN THE BUILDING, COORDINATE

WITH GOVERNMENT TO ENSURE PROPER

FUNCTION AND THAT SWITCH IS CURRENTLY

TIED TO THE FRONT END FOR VISIBILITY AND

CONTROL WITHIN THE BAS. NOTIFY

GOVERNMENT/COR OF EXISTING CONDITIONS

AND CURRENT OPERATION.

REMOVE AIR HANDLER INSTALLED

ON MEZZANINE ABOVE FIRST

FLOOR OFFICE/ADMIN SPACE. ALL

ASSOCIATED DUCTWORK AND

CONTROLS SHALL REMAIN.

HP-1

AH-1

REFRIGERANT LINES SHALL

BE ROUTED THRU EXISTING

WALL PENETRATION

LOCATE AIR HANDLER IN SAME

LOCATION AS DEMOLISHED AND

CONNECT BACK TO EXISTING

DUCTWORK, CONDENSATE AND

CONTROLS. PROVIDE FLEXIBLE

CONNECTION BETWEEN AIR HANDLER

AND DUCTWORK. PROVIDE TRANSITION

AS REQUIRED FOR CONNECTION TO

EXISTING DUCTWORK (TYP)

2 3

NEW HEAT PUMP UNIT SHALL

BE INSTALLED ON EXISTING

CONCRETE APRON. (TYP)

PROJECT MANAGER

0 1" 2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

D. WORLEY

D. WORLEY

M. DIMOFF

CONTRACT #: W91242-18-F-0130

ANG PROJECT #: WEFM142600

HDR PROJECT #: 10137117

STANLY COUNTY AIR NATIONAL GUARD STATION

STANLY COUNTY AIRPORT

REPLACE HVAC SYSTEMS

BASE WIDE - STANLY CO.

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

NEW LONDON, NC

1/8" = 1'-0"C rv t\

\1

-0

-M

P d e re k .w o rl e y .r v t

/1

/2

:1

:4

P M

75M101

N. OVERBY

10137117-00-MP.rvt

MECHANICAL PLANS

BUILDING 75

1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN

1/8" = 1'-0"

MECHANICAL PLAN

KEYNOTES

1 BACNET ROUTER, TEMPERATURE SENSOR AND

DOOR SWITCHES. ROUTER SHALL

COMMUNICATE WITH EXISTING BAS

CONTROLLER LOCATED IN BUILDING 77.

2 SMART METER ON EXISTING PROPANE SERVICE.

COORDINATE TYPES AND DESIGNS WITH

GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE DOWNLOADING OF DATA.

3 SMART METER ON EXISTING ELECTRICAL

SERVICE. COORDINATE TYPES AND DESIGNS

WITH GOVERNMENT TO ENSURE THAT METER IS

COMPATIBLE WITH EXISTING SYSTEM. METERS

SELECTED SHALL MEET CURRENT UFC'S AND AIR

FORCE REQUIREMENTS. METER SHALL BE

WIRED/ROUTED TO BUILDING CONTROLLER FOR

VISIBILITY ON THE EXISTING FRONT END. IF

METER IS NOT VISIBLE DUE TO

COMMUNICATIONS RESTRICTIONS, NOTIFY COR

AND ENSURE THAT METER IS ACCESSIBLE FOR

REMOTE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .