DCFT 252005 Schedule of Material Submtls.pdf

PDF 63 KB Posted

Attached to
183 CES Replace Security Forces Squadron Generator
Solicitation number
W50S7U-25-Q-A004
Issued by

About this file

This is a Schedule of Material Submittals for a military construction project to replace a SFS Generator at Building 25. The project is identified by Project Number DCFT 252005 and Solicitation/Contract Number W50S7U-25-Q-A004. The submittal schedule requires documentation and approvals for multiple technical components, including bonds, work schedule, concrete/rebar (if applicable), wiring, conduit, diesel-engine generators, transfer switches, electrical equipment accessories, and warranty information. The document provides a detailed tracking matrix for contractors to submit various technical documents, with spaces for project engineer and contract administrator annotations, including approval status, submission dates, and number of required document copies.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

1 Bonds 1

2 Work Schedule 1

3 Concrete / Rebar (if applicable)

4 Wiring 1 1 1 1 1 1 1

5 Conduit 1 1 1 1 1 1 1

6 Diesel-Engine Generators 1 1 1 1 1 1 1 1 1 1 1

7 Transfer Switches 1 1 1 1 1 1 1 1 1 1 1

8 Electrical / Equipment Accessories 1 1 1 1 1 1 1 1 1 1 1

9 Warranty 1 1 1 1

Re tu rn S us pe ns e

D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

Co lo r S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

M an uf ac tu re r's W ar ra nt y

Ca ta lo g

D at a

Project Number:

DCFT 252005

Project Title:

Replace SFS Generator, Building 25

Solicitation / Contract Number:

W50S7U-25-Q-A004

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

Re qu ire d

Su bm is si on D at e

Item or Description of Item, Contract Reference, Type of Submittal

Ce rt ifi ca te o f C om pl ia nc e

Sh op

D ra w in gs

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

Co nt ra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required

D at e Re ce iv ed in

C on tr ac tin g

Fi el d Re po rt s

O pe ra tin g In st ru ct io ns

Sc he du le s, L is tin gs , R ep or ts , P la ns

Material Submittals Schedule