DCFT 252005 Schedule of Material Submtls.pdf
PDF 63 KB Posted
- Solicitation number
- W50S7U-25-Q-A004
- Issued by
-
Department of the Army National Guard
About this file
This is a Schedule of Material Submittals for a military construction project to replace a SFS Generator at Building 25. The project is identified by Project Number DCFT 252005 and Solicitation/Contract Number W50S7U-25-Q-A004. The submittal schedule requires documentation and approvals for multiple technical components, including bonds, work schedule, concrete/rebar (if applicable), wiring, conduit, diesel-engine generators, transfer switches, electrical equipment accessories, and warranty information. The document provides a detailed tracking matrix for contractors to submit various technical documents, with spaces for project engineer and contract administrator annotations, including approval status, submission dates, and number of required document copies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
1 Bonds 1
2 Work Schedule 1
3 Concrete / Rebar (if applicable)
4 Wiring 1 1 1 1 1 1 1
5 Conduit 1 1 1 1 1 1 1
6 Diesel-Engine Generators 1 1 1 1 1 1 1 1 1 1 1
7 Transfer Switches 1 1 1 1 1 1 1 1 1 1 1
8 Electrical / Equipment Accessories 1 1 1 1 1 1 1 1 1 1 1
9 Warranty 1 1 1 1
Re tu rn S us pe ns e
D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
Co lo r S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
M an uf ac tu re r's W ar ra nt y
Ca ta lo g
D at a
Project Number:
DCFT 252005
Project Title:
Replace SFS Generator, Building 25
Solicitation / Contract Number:
W50S7U-25-Q-A004
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
Re qu ire d
Su bm is si on D at e
Item or Description of Item, Contract Reference, Type of Submittal
Ce rt ifi ca te o f C om pl ia nc e
Sh op
D ra w in gs
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
Co nt ra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required
D at e Re ce iv ed in
C on tr ac tin g
Fi el d Re po rt s
O pe ra tin g In st ru ct io ns
Sc he du le s, L is tin gs , R ep or ts , P la ns
Material Submittals Schedule