W50S7U-21-B-0001-0001 Amendment 0001.pdf
PDF 419 KB Posted
- Attached to
- 183 CES Repair CRF Building P-17
- Solicitation number
- W50S7U-21-B-0001
- Issued by
-
Department of the Army National Guard
About this file
This document contains an amendment to a federal solicitation for construction services. The solicitation is for repair work to Building P-17 at the 183rd Communications Flight facility. The amendment incorporates three addenda into the solicitation documents, updating the project manual, drawings, specifications, and statement of work. A site visit date and location are provided. The solicitation is issued by the Department of the Army National Guard for repair of an existing facility. Responses are due as indicated on the Standard Form 1442.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DCFT102008
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorperate:
DOCUMENT 009113.1 – ADDENDA NO. 1, Dated: 5/28/2020.
DOCUMENT 009113.2 – ADDENDA NO. 2, Dated 9/3/2020.
DOCUMENT 009113.3 – ADDENDA NUMBER 3, Dated, 4/7/2021
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S7U21B0001
X 9B. DATED (SEE ITEM 11)
09-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Apr-2021
CODE
USPFO IL 183 MISSION SUPPORT CONTRACTING
3101 J DAVID JONES PARKWAY
SPRINGFIELD IL 62707-5003
W50S7U 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S7U21B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
SECTION 00010
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 - BID SCHEDULE, NOTES
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project # DCFT102008 Dated 12 December 2019 with
Addemum #1 dated 28 May 2020 (w/applicable drawings), Addendum #2 dated 03 September 2020, Drawings dated 12 December 2020, and Addendum #3 dated 07 April 2021.
Addendums 1, 2, and 3 have been issued to all registered plan holders pursuant to the
Conditions of the Contract. These Addendums serve to clarify, revise, and supersede information in the Project Manual, and Drawings. Portions of the Addendums affecting the
Contract Documents will be incorporated into the Contract by enumeration of the
Addendum(s).
SECTION 00010 NOTES
NOTES
1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://beta.SAM.gov.
2. Facsimile transmission of bid is not authorized. Electronic submission of bids will NOT be accepted.
3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://beta.SAM.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.
4. Reserved.
5. A complete bid package must contain the following:
(a) Offer, Standard Form (SF) 1442 front and back signed
(b) Section 00010 Line Items- all items must be priced http://beta.sam.gov/ http://beta.sam.gov/ https://www.sam.gov/portal/public/SAM/
(c) A Bid Bond and Power of Attorney are required with submission of the bid. The bid bond is due on the date stated on the SF1442 block 13. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.
(d) Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.
(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.
One copy of the SF1442 is required to have an original signature.
(f) All amendments to the solicitation must be acknowledged.
(g) Mark the front of the envelope with the following: “BID No. W50S7U-21-B-0001”, and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
6. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting
Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR
Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the
Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. All questions regarding
Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.
End of Section 00010
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
GENERAL
G-001 COVER SHEET
CIVIL SITE
CD-101 SITE REMOVAL PLAN
C-102 SITE DEVELOPMENT PLAN
C-103 SITE GRADING AND EROSION CONTROL PLAN
C-501 CIVIL / SITE GENERAL NOTES & DETAILS
C-502 CIVIL / SITE DETAILS
C-503 CIVIL / SITE DETAILS
ABATEMENT
HZ-001 INTERIOR ASBESTOS ABATEMENT AREAS
HZ-002 EXTERIOR ASBESTOS ABATEMENT AREAS - EAST AND SOUTH ELEVATIONS
HZ-003 EXTERIOR ASBESTOS ABATEMENT AREAS - WEST AND NORTH ELEVATIONS
HZ-004 INTERIOR LEAD-LINED ABATEMENT AREAS
ARCHITECTURAL
A-001 ARCHITECTURAL ABBREVIATIONS, TYPICAL ACCESSIBILITY MOUNTING HEIGHTS
& SYMBOLS LEGEND
A-002 CODE AND LIFE SAFETY PLAN / CONTINUOUS AIR BARRIER PLAN
AD-101 DEMOLITION PLAN AND PHOTOS
AD-102 DEMOLITION PHOTOS
AD-103 DEMOLITION PHOTOS
AE-101 FLOOR PLAN
AE-102 ROOF PLAN
AE-103 ENLARGED FLOOR PLAN & REFLECTED CEILING PLANS
AE-104 EQUIPMENT FLOOR PLAN & EQUIPMENT SCHEDULE
AE-201 ELEVATIONS
AE-301 BUILDING SECTIONS
AE-310 WALL SECTIONS
AE-311 WALL SECTIONS
AE-401 INTERIOR ELEVATIONS/ MILLWORK
AE-500 DETAILS
AE-501 DETAILS
AE-502 DETAILS
AE-601 ROOM FINISH SCHEDULE, DOOR SCHEDULE & GLAZING ELEVATIONS
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 TYPICAL DETAILS
SD-101 GROUND FLOOR DEMOLITION PLAN
SD-102 ROOF DEMOLITION PLAN
S-101 GROUND FLOOR PLAN
S-102 ROOF PLAN
S-301 BUILDING SECTIONS
S-401 ENLARGED PLAN VIEWS
S-501 SECTIONS AND DETAILS
S-502 SECTIONS AND DETAILS
S-503 SECTIONS AND DETAILS
S-504 SECTIONS AND DETAILS
S-505 SECTIONS AND DETAILS
S-506 SECTIONS AND DETAILS
PLUMBING
P-001 PLUMBING NOTES, LEGENDS, AND ABBREVIATIONS
PD-101 FIRST FLOOR SANITARY WASTE & VENT PIPING DEMOLITION PLAN
PD-102 FIRST FLOOR DOMESTIC WATER PIPING DEMOLITION PLAN
PD-103 FIRST FLOOR COMPRESSED AIR PIPING DEMOLITION PLAN
P-101 FIRST FLOOR SANITARY AND WASTE & VENT PIPING NEW WORK PLAN
P-102 FIRST FLOOR DOMESTIC WATER PIPING NEW WORK PLAN
P-103 FIRST FLOOR CONDENSATE PIPING NEW WORK PLAN
P-104 FIRST FLOOR COMPRESSED AIR PIPING NEW WORK PLAN
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-601 ADDENDUM #1
P-602 PLUMBING SCHEDULES CONTINUED
P-901 ISOMETRICS
P-902 ISOMETRICS
HEATING
H-001 HEATING NOTES, LEGENDS, AND ABBREVIATIONS
HD-101 FIRST FLOOR HEATING DEMOLITION PLAN
HD-102 FIRST FLOOR NATURAL GAS DEMOLITION PLAN
H-101 FIRST FLOOR HEATING NEW WORK PLAN
H-102 FIRST FLOOR NATURAL GAS PIPING NEW WORK
H-501 HEATING SCHEMATIC DIAGRAMS
H-502 SEQUENCES OF OPERATIONS
H-503 VRF AND HUMIDIFICATION SEQUENCE OF OPERATIONS
H-504 MINI-SPLITS, UH, CUH, PLUMBING SEQUENCES OF OPERATIONS
H-505 EXHAUST FAN SEQUENCE OF OPERATIONS
H-506 EXHAUST FAN SEQUENCE OF OPERATIONS CONTINUED
H-507 MAU & DOAS SEQUENCE OF OPERATIONS
H-508 HEATING DETAILS
H-601 HEATING SCHEDULES
H-601 ADDENDUM #1
H-602 HEATING SCHEDULES CONTINUED
VENTILATION
V-001 VENTILATION NOTES, LEGENDS, AND ABBREVIATIONS
VD-101 FIRST FLOOR VENTILATION DEMOLITION PLAN
VD-201 SECOND FLOOR VENTILATION DEMOLITION PLAN
V-101 FIRST FLOOR VENTILATION NEW WORK PLAN
V-201 SECOND FLOOR VENTILATION NEW WORK PLAN
V-501 VENTILATION DETAILS
V-502 VENTILATION DETAILS- CONTINUED
V-601 VENTILATION SCHEDULES
V-602 VENTILATION SCHEDULES CONTINUED
V-901 DUCTWORK ELEVATIONS AND ISOMETRIC VIEWS
FIRE PROTECTION
F-001 LEGEND & ABBREVIATIONS
FP-101 FIRE PROTECTION PLAN
FA-701 FIRE ALARM RISER DIAGRAM
FA-702 FIRE ALARM AND MASS NOTIFICATION INPUT / OUTPUT MATRIX
ELECTRICAL
E-001 ELECTRICAL SYMBOLS AND NOTES
ED-101 FIRST FLOOR -ELECTRICAL DEMOLITION PLAN
E-101 ELECTRICAL POWER PLAN
E-102 ELECTRICAL RECEPTACLE PLAN
E-103 ELECTRICAL SHOP EQUIPMENT PLAN
E-104 PARTIAL ELECTRICAL PLAN - MECH / ELECT. ROOM
E-201 LIGHTING PLAN
E-301 COMMUNICATIONS AND SECURITY PLAN
E-601 ONE-LINE DIAGRAM AND DETAILS
E-602 ELECTRICAL PANELBOARD SCHEDULES
E-603 PANELBOARD SCHEDULES
E-604 LIGHTING SCHEDULES
E-605 COMMUNICATION SCHEDULES AND DETAILS
E-606 ELECTRICAL DETAILS
REFERENCE DRAWINGS
• EXISTING AVAILABLE CIVIL, STRUCTURAL, ARCHITECTURAL DRAWINGS (20 PAGES)
• EXISTING AVAILABLE MECHANICAL & ELECTRICAL DRAWINGS (23 PAGES)
• EXISTING AVAILABLE CANOPY DOOR DRAWINGS (43 PAGES)
(End of clause)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .