This addendum provides revisions to specifications and drawings for a federal construction contract to repair Building P-17 at the 183rd Communications Squadron in Springfield, Illinois.

The addendum updates specifications to reference ASHRAE 90.1 energy efficiency standards rather than ASHRAE 189.1, replaces terminology for clarity and consistency, and inserts additional commissioning requirements. It also includes revised mechanical and plumbing drawings that update VRV unit efficiency values and add fixture product data.

The related solicitation seeks bids to repair Building P-17 in accordance with the specifications, drawings, addendums and statement of work. A site visit is scheduled for interested contractors to inspect the building. The Department of the Army National Guard is the contracting agency for this project.

View the file

Other files

File Type Posted
Bid Opening Sign in.pdf PDF
Bid Opening Report- Repair CRF Building 17 W50S7U-21-B-0001.pdf PDF
W50S7U-21-B-0001-0001 Amendment 0001.pdf PDF
SECTION 074213.13 - FORMED METAL WALL PANELS.pdf PDF
DCFT 102008 RFI Repsonse 4 Roof and Wall Panels Sec 07413.13.docx DOCX document
DCFT 102008 RFI Response 3.docx DOCX document
DS Boot 2.jpg JPG image
DS Boot 3.jpg JPG image
DCFT 102008 RFI Response 3 - Door Hardware Sets.docx DOCX document
DS Boot 1.jpg JPG image
61650_Arch_amerzTDZYW-183WG-2090209.png PNG image
009113_2 fl - addenda_No2.pdf PDF
61650_Arch_amerzTDZYW-4-1309292.JPG JPG image
61650_Arch_amerzTDZYW-fsb-fdg-jv-logo-2ver-2090207.png PNG image
61650_Arch_amerzTDZYW-3-1309490.JPG JPG image
DCFT 102008 - RFI-RESPONSE 2.docx DOCX document
61650_Arch_amerzTDZYW-2-1309322.JPG JPG image
61650_Arch_amerzTDZYW-6-1309001.JPG JPG image
61650_Arch_amerzTDZYW-5-1307452.jpg JPG image
61650_Arch_amerzTDZYW-1-1151913.JPG JPG image
123661.16 - SOLID SURFACING COUNTERTOPS.pdf PDF
RFI Response 1 W50S7U-21-B-0001.pdf PDF
A-001.pdf PDF
AD-101.pdf PDF
AE-310.pdf PDF
AE-103.pdf PDF
AE-311.pdf PDF
AE-601.pdf PDF
102800 - TOILET_ BATH_ AND LAUNDRY ACCESSORIES.pdf PDF
AE-301.pdf PDF
AE-401.pdf PDF
105113 - METAL LOCKERS.pdf PDF
090690 - COLOR SCHEDULE.pdf PDF
009113_3 fl - addenda_No3.pdf PDF
A-002.pdf PDF
P17 Reference Civil_Struct_Arch Dwgs Binder.zip ZIP file
Site Visit Sign-In Sheet CES Repair CRF P-17.pdf PDF
Site Visit Slides - CES Repair CRF P-17.pdf PDF
P17 Reference Canopy Door Dwgs Binder.zip ZIP file
P17 Reference Mech_Elect Dwgs Binder.zip ZIP file
SF 1705.pdf PDF
W50S7U-21-B-0001 -Solicitation - Repair Centralized Repair Facility Building P-17.pdf PDF
SOW - 102008 Final.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DCFT #102008

Hanson #13D0027004

009113.1 - 1 009113.1

ADDENDA NO. 1

DOCUMENT 009113.1 – ADDENDA NO. 1

1.1 PROJECT INFORMATION

A. Repair CRF Building P-17

Illinois Air National Guard, 183D Wing

Abraham Lincoln Capital Airport, Springfield, IL

IL ANG Project No. DCFT102008

B. Prepared by: Hanson Professional Services Inc.

1525 South Sixth Street

Springfield, IL 62703

Phone: 217.788.2450

Hanson Project No. 13D0027004

C. Prepared on Behalf of: FSB Federal Design Group JV

5801 Broadway Extension, Suite 500

Oklahoma City, OK 73118-7436

Contract No. W9113L-16-D-005

Delivery Order 9E01

Web Site: www/fsb-ae.com

D. Date of Addendum: 5/28/2020.

1.2 NOTICE TO BIDDERS

A. This Addendum is issued to all registered plan holders pursuant to the Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda as noted below. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Government/Contractor Agreement.

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.

C. The date for receipt of bids is unchanged by this Addendum, at same time and location.

009113.1 - 2 009113.1

ADDENDA NO. 1

1.3 ATTACHMENTS

A. This Addendum includes the attached Addendum Drawings:

1. Heating Addendum, drawing H-601 Addenda No. 1, dated 5/28/2020.

2. Plumbing Addendum, drawing P-601 Addenda No. 1, dated 5/28/2020.

1.4 REVISIONS TO DIVISIONS 01 - 49 SPECIFICATION SECTIONS

A. Specification Section 019113:

1. After Paragraph 1.1.A insert 1.1.B “ASHRAE standard 90.1-2013, ASHRAE Guideline 0-2019 (The Commissioning Process), ASHRAE Standard 202-2018 Commissioning Process for Buildings and Systems, ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 (ASHRAE 189.1) Standard for the Design of High-Performance Green Buildings except Low-Rise Residential Buildings, and United Facilities Guide Specifications 01 91 00.15.”

2. Paragraph 1.1.B: Replace “B. OPR and BoD documentation are included by reference for information only” with “The Government’s Project Requirements (OPR) and the Architect / Engineer’s (Design team’s) Basis of Design (BoD) documentation are included by reference for information only.” Renumber to item C.

3. Replace all instances of “owner” with “Government.”

4. Replace all instances of “Using Agency” with “Government.”

5. Paragraph 1.2.E: Replace “OR – Owner’s Representative” with “CO Government Contracting Officer.” Add “COTR Contracting Officer’s Technical Representative.”

6. Paragraph 1.2.F: Add 1.2.F.4, “Section 013329 “Sustainability Reporting” for submitting items required for sustainability reporting and third -party certification.”

7. Paragraph 1.4.A: Add “Refer also to 01 33 00 PFOIL form (submittal register) for a listing of "S" submittals.”

8. Paragraph 1.4.B.1.d: Replace with “Power Ventilators / Exhaust Fans.”

9. Paragraph 1.5.A: Replace with “Commissioning Team: The members of the commissioning team consist of the Commissioning Authority (CxA), Representatives of the Government, the, CO, the COTR, the General Contractor (GC), the Contractor’s Quality Control Representative, the architect and design engineers (particularly the mechanical engineer), the Heating Contractor (HC), the Ventilating Contractor (VC), the Electrical Contractor (EC), the TAB representative, the Controls Contractor (CC), and all other installing subcontractors or suppliers of equipment. If known, the Government’s building or plant operator/engineer is also a member of the commissioning team.”

10. Replace instances of “commissioning scoping meeting” with “Construction Commissioning Coordination Meeting.”

11. Replace instances of “Commissioning Plan – Construction Phase” with “Commissioning Plan.”

009113.1 - 3 009113.1

ADDENDA NO. 1

12. Paragraph 1.8: Insert new item A. “Manage the contract of the A/E, CxA, GC and other discipline (trade) contractors.” Renumber items to end in Item F.

B. Specification Section 220800:

1. After Paragraph 1.1.A insert 1.1.B: “ASHRAE standard 90.1-2013, ASHRAE Guideline 0-2019 (The Commissioning Process), ASHRAE Standard 202-2018 Commissioning Process for Buildings and Systems, ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 (ASHRAE 189.1) Standard for the Design of High-Performance Green Buildings except Low-Rise Residential Buildings, and United Facilities Guide Specifications 01 91 00.15.”

2. After Paragraph 1.1.B insert 1.1.C: “The Government’s Project Requirements (OPR) and the Architect / Engineer’s (Design team’s) Basis of Design (BoD) documentation are included by reference for information only.”

3. Replace all instances of “owner” with “Government.”

4. Replace all instances of “Using Agency” with “Government.”

5. Paragraph 1.5: Eliminate duplicate Paragraph header “1.1 SUBMITTALS.”

6. Paragraph 1.5.A: Add “Refer also to 01 33 00 PFOIL form (submittal register) for a listing of "S" submittals.”

7. Paragraph 1.2 QUALITY ASSURANCE: renumber to 1.6.

C. Specification Section 230800:

1. After Paragraph 1.1.A insert 1.1.B: “ASHRAE standard 90.1-2013, ASHRAE Guideline 0-2019 (The Commissioning Process), ASHRAE Standard 202-2018 Commissioning Process for Buildings and Systems, ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 (ASHRAE 189.1) Standard for the Design of High-Performance Green Buildings except Low-Rise Residential Buildings, and United Facilities Guide Specifications 01 91 00.15.”

2. After Paragraph 1.1.B insert 1.1.C: “The Government’s Project Requirements (OPR) and the Architect / Engineer’s (Design team’s) Basis of Design (BoD) documentation are included by reference for information only.”

3. Replace all instances of “owner” with “Government.”

4. Replace all instances of “Using Agency” with “Government.”

5. Paragraph 1.5.A: Add “Refer also to 01 33 00 PFOIL form (submittal register) for a listing of "S" submittals.”

6. Paragraph 1.5.B.1.d: Replace with “Power Ventilators / Exhaust Fans.”

7. Paragraph 3.9.G.5: Replace with “Power Ventilators / Exhaust Fans.”

009113.1 - 4 009113.1

ADDENDA NO. 1

D. Specification Section 260800:

1. After Paragraph 1.1.A insert 1.1.B: “ASHRAE standard 90.1-2013, ASHRAE Guideline 0-2019 (The Commissioning Process), ASHRAE Standard 202-2018 Commissioning Process for Buildings and Systems, ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 (ASHRAE 189.1) Standard for the Design of High-Performance Green Buildings except Low-Rise Residential Buildings, and United Facilities Guide Specifications 01 91 00.15.”

2. After Paragraph 1.1.B insert 1.1.C: “The Government’s Project Requirements (OPR) and the Architect / Engineer’s (Design team’s) Basis of Design (BoD) documentation are included by reference for information only.”

3. Replace all instances of “owner” with “Government.”

4. Replace all instances of “Using Agency” with “Government.”

5. Paragraph 1.5.A: Add “Refer also to 01 33 00 PFOIL form (submittal register) for a listing of "S" submittals.”

6. Paragraph 1.5.B.1.a: Replace with “Lighting Fixtures”

7. Paragraph 1.5.B.1.b: Replace with “Lighting Controls”

8. Paragraph 1.5.B.1.a: Insert 1.5.B.1.b “Building Automation System (HVAC Controls).”

9. Paragraph 3.1.E.3: Replace with “This information shall be organized and arranged by building system, such as fire alarm, lighting controls, emergency generator and transfer switch, etc.”

E. Specification Section 238130:

1. Paragraph 1.4.C: Replace “ASHRAE 189.1, “Standard for the Design of High- Performance Green Buildings” with “ASHRAE 90.1, “Energy Standard for Buildings Except Low-Rise Residential Buildings.”

2. Paragraph 1.4.D: Replace “ASHRAE 189.1, “Standard for the Design of High- Performance Green Buildings” with “ASHRAE 90.1, “Energy Standard for Buildings Except Low-Rise Residential Buildings.”

1.5 REVISIONS TO DRAWING SHEETS

A. Revised sheet: H-601 Addenda No. 1, dated 5/28/2020, is attached.

1. VRV condensing unit efficiency values updated from those required by ASHRAE 189.1 to those required by ASHRAE 90.1.

B. Revised sheet: P-601 Addenda No. 1, dated 5/28/2020, is attached.

1. Plumbing fixture schedule updated to include manufacturer make/model and flow rate for

SH-1.

END OF DOCUMENT 009113.1

1.1 PROJECT INFORMATION
A. Repair CRF Building P-17
Illinois Air National Guard, 183D Wing
Abraham Lincoln Capital Airport, Springfield, IL
IL ANG Project No. DCFT102008
B. Prepared by: Hanson Professional Services Inc.
1525 South Sixth Street
Springfield, IL 62703
Phone: 217.788.2450
Hanson Project No. 13D0027004
C. Prepared on Behalf of: FSB Federal Design Group JV
5801 Broadway Extension, Suite 500
Oklahoma City, OK 73118-7436
Contract No. W9113L-16-D-005
Delivery Order 9E01
Web Site: www/fsb-ae.com
D. Date of Addendum: 5/28/2020.
1.2 NOTICE TO BIDDERS
A. This Addendum is issued to all registered plan holders pursuant to the Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda as noted below. Por...
B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.
C. The date for receipt of bids is unchanged by this Addendum, at same time and location.
1.3 ATTACHMENTS
A. This Addendum includes the attached Addendum Drawings:
1. Heating Addendum, drawing H-601 Addenda No. 1, dated 5/28/2020.
2. Plumbing Addendum, drawing P-601 Addenda No. 1, dated 5/28/2020.
1.4 REVISIONS TO DIVISIONS 01 - 49 SPECIFICATION SECTIONS
A. Specification Section 019113:
1. After Paragraph 1.1.A insert 1.1.B “ASHRAE standard 90.1-2013, ASHRAE Guideline 0-2019 (The Commissioning Process), ASHRAE Standard 202-2018 Commissioning Process for Buildings and Systems, ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 (ASHRAE 189.1) S...
2. Paragraph 1.1.B: Replace “B. OPR and BoD documentation are included by reference for information only” with “The Government’s Project Requirements (OPR) and the Architect / Engineer’s (Design team’s) Basis of Design (BoD) documentation are included...
3. Replace all instances of “owner” with “Government.”
4. Replace all instances of “Using Agency” with “Government.”
5. Paragraph 1.2.E: Replace “OR – Owner’s Representative” with “CO Government Contracting Officer.” Add “COTR Contracting Officer’s Technical Representative.”
6. Paragraph 1.2.F: Add 1.2.F.4, “Section 013329 “Sustainability Reporting” for submitting items required for sustainability reporting and third -party certification.”
7. Paragraph 1.4.A: Add “Refer also to 01 33 00 PFOIL form (submittal register) for a listing of "S" submittals.”
8. Paragraph 1.4.B.1.d: Replace with “Power Ventilators / Exhaust Fans.”
9. Paragraph 1.5.A: Replace with “Commissioning Team: The members of the commissioning team consist of the Commissioning Authority (CxA), Representatives of the Government, the, CO, the COTR, the General Contractor (GC), the Contractor’s Quality Contr...
10. Replace instances of “commissioning scoping meeting” with “Construction Commissioning Coordination Meeting.”
11. Replace instances of “Commissioning Plan – Construction Phase” with “Commissioning Plan.”
12. Paragraph 1.8: Insert new item A. “Manage the contract of the A/E, CxA, GC and other discipline (trade) contractors.” Renumber items to end in Item F.
B. Specification Section 220800:
1. After Paragraph 1.1.A insert 1.1.B: “ASHRAE standard 90.1-2013, ASHRAE Guideline 0-2019 (The Commissioning Process), ASHRAE Standard 202-2018 Commissioning Process for Buildings and Systems, ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 (ASHRAE 189.1) ...
2. After Paragraph 1.1.B insert 1.1.C: “The Government’s Project Requirements (OPR) and the Architect / Engineer’s (Design team’s) Basis of Design (BoD) documentation are included by reference for information only.”
3. Replace all instances of “owner” with “Government.”
4. Replace all instances of “Using Agency” with “Government.”
5. Paragraph 1.5: Eliminate duplicate Paragraph header “1.1 SUBMITTALS.”
6. Paragraph 1.5.A: Add “Refer also to 01 33 00 PFOIL form (submittal register) for a listing of "S" submittals.”
7. Paragraph 1.2 QUALITY ASSURANCE: renumber to 1.6.
C. Specification Section 230800:
1. After Paragraph 1.1.A insert 1.1.B: “ASHRAE standard 90.1-2013, ASHRAE Guideline 0-2019 (The Commissioning Process), ASHRAE Standard 202-2018 Commissioning Process for Buildings and Systems, ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 (ASHRAE 189.1) ...
2. After Paragraph 1.1.B insert 1.1.C: “The Government’s Project Requirements (OPR) and the Architect / Engineer’s (Design team’s) Basis of Design (BoD) documentation are included by reference for information only.”
3. Replace all instances of “owner” with “Government.”
4. Replace all instances of “Using Agency” with “Government.”
5. Paragraph 1.5.A: Add “Refer also to 01 33 00 PFOIL form (submittal register) for a listing of "S" submittals.”
6. Paragraph 1.5.B.1.d: Replace with “Power Ventilators / Exhaust Fans.”
7. Paragraph 3.9.G.5: Replace with “Power Ventilators / Exhaust Fans.”
D. Specification Section 260800:
1. After Paragraph 1.1.A insert 1.1.B: “ASHRAE standard 90.1-2013, ASHRAE Guideline 0-2019 (The Commissioning Process), ASHRAE Standard 202-2018 Commissioning Process for Buildings and Systems, ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 (ASHRAE 189.1) ...
2. After Paragraph 1.1.B insert 1.1.C: “The Government’s Project Requirements (OPR) and the Architect / Engineer’s (Design team’s) Basis of Design (BoD) documentation are included by reference for information only.”
3. Replace all instances of “owner” with “Government.”
4. Replace all instances of “Using Agency” with “Government.”
5. Paragraph 1.5.A: Add “Refer also to 01 33 00 PFOIL form (submittal register) for a listing of "S" submittals.”
6. Paragraph 1.5.B.1.a: Replace with “Lighting Fixtures”
7. Paragraph 1.5.B.1.b: Replace with “Lighting Controls”
8. Paragraph 1.5.B.1.a: Insert 1.5.B.1.b “Building Automation System (HVAC Controls).”
9. Paragraph 3.1.E.3: Replace with “This information shall be organized and arranged by building system, such as fire alarm, lighting controls, emergency generator and transfer switch, etc.”
E. Specification Section 238130:
1. Paragraph 1.4.C: Replace “ASHRAE 189.1, “Standard for the Design of High-Performance Green Buildings” with “ASHRAE 90.1, “Energy Standard for Buildings Except Low-Rise Residential Buildings.”
2. Paragraph 1.4.D: Replace “ASHRAE 189.1, “Standard for the Design of High-Performance Green Buildings” with “ASHRAE 90.1, “Energy Standard for Buildings Except Low-Rise Residential Buildings.”
1.5 REVISIONS TO DRAWING SHEETS
A. Revised sheet: H-601 Addenda No. 1, dated 5/28/2020, is attached.
1. VRV condensing unit efficiency values updated from those required by ASHRAE 189.1 to those required by ASHRAE 90.1.
B. Revised sheet: P-601 Addenda No. 1, dated 5/28/2020, is attached.
1. Plumbing fixture schedule updated to include manufacturer make/model and flow rate for SH-1.