AE-601.pdf

PDF 167 KB Posted

Attached to
183 CES Repair CRF Building P-17
Solicitation number
W50S7U-21-B-0001
Issued by

About this file

This solicitation package includes plans and specifications for repair work to Building P-17 at the 183rd Communications Squadron facility. The work includes repairs to the building envelope, doors, windows and interior finishes. The solicitation is issued by the Department of the Army National Guard under contract number W50S7U-21-B-0001. Bids are due by the date identified in the solicitation package. The successful bidder will be awarded a contract to complete the repair work in accordance with the project manual, drawings, specifications and statement of work provided. Site visits are available for bidders to inspect the building and project scope.

View the file

Other files

File Type Posted
Bid Opening Sign in.pdf PDF
Bid Opening Report- Repair CRF Building 17 W50S7U-21-B-0001.pdf PDF
W50S7U-21-B-0001-0001 Amendment 0001.pdf PDF
SECTION 074213.13 - FORMED METAL WALL PANELS.pdf PDF
DCFT 102008 RFI Repsonse 4 Roof and Wall Panels Sec 07413.13.docx DOCX document
DCFT 102008 RFI Response 3.docx DOCX document
DS Boot 2.jpg JPG image
DS Boot 3.jpg JPG image
DCFT 102008 RFI Response 3 - Door Hardware Sets.docx DOCX document
DS Boot 1.jpg JPG image
009113_1 fl - addenda_No1.pdf PDF
61650_Arch_amerzTDZYW-183WG-2090209.png PNG image
009113_2 fl - addenda_No2.pdf PDF
61650_Arch_amerzTDZYW-4-1309292.JPG JPG image
61650_Arch_amerzTDZYW-fsb-fdg-jv-logo-2ver-2090207.png PNG image
61650_Arch_amerzTDZYW-3-1309490.JPG JPG image
DCFT 102008 - RFI-RESPONSE 2.docx DOCX document
61650_Arch_amerzTDZYW-2-1309322.JPG JPG image
61650_Arch_amerzTDZYW-6-1309001.JPG JPG image
61650_Arch_amerzTDZYW-5-1307452.jpg JPG image
61650_Arch_amerzTDZYW-1-1151913.JPG JPG image
123661.16 - SOLID SURFACING COUNTERTOPS.pdf PDF
RFI Response 1 W50S7U-21-B-0001.pdf PDF
A-001.pdf PDF
AD-101.pdf PDF
AE-310.pdf PDF
AE-103.pdf PDF
AE-311.pdf PDF
102800 - TOILET_ BATH_ AND LAUNDRY ACCESSORIES.pdf PDF
AE-301.pdf PDF
AE-401.pdf PDF
105113 - METAL LOCKERS.pdf PDF
090690 - COLOR SCHEDULE.pdf PDF
009113_3 fl - addenda_No3.pdf PDF
A-002.pdf PDF
P17 Reference Civil_Struct_Arch Dwgs Binder.zip ZIP file
Site Visit Sign-In Sheet CES Repair CRF P-17.pdf PDF
Site Visit Slides - CES Repair CRF P-17.pdf PDF
P17 Reference Canopy Door Dwgs Binder.zip ZIP file
P17 Reference Mech_Elect Dwgs Binder.zip ZIP file
SF 1705.pdf PDF
W50S7U-21-B-0001 -Solicitation - Repair Centralized Repair Facility Building P-17.pdf PDF
SOW - 102008 Final.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D O

O R

H

EI

G H

T

DOOR WIDTH

D O

O R

H

EI

G H

T

DOOR WIDTH

SFX STEEL, EXTERIOR

SFI STEEL, INTERIOR

SLI STEEL, INTERIOR

REF DOOR

SCHEDULE

FOR SIZE

D O

O R

H

EI

G H

T

DOOR WIDTH

GLAZING

REF DOOR

SCHEDULE

FOR TYPE

SGX STEEL, EXTERIOR

D O

O R

H

EI

G H

T

DOOR WIDTH

RDX ROLLING DOOR, EXTERIOR

S2 STEEL

D O

O R

H

EI

G H

T 2"

2" 2" 2" 2"DOOR WIDTH DOOR WIDTH

D2 STEEL

D O

O R

H

EI

G H

T 2"

TYPE NOTES

HEAD

JAMB

SILL

W1

TRANSLUCENT

WALL PANEL

6'-0"

6' -0

3'

-0

GROUND FLOOR

EL 100'-0"

TYPE NOTES

HEAD

JAMB

SILL

W2

TRANSLUCENT

WALL PANEL

6'-0"

6' -0

3'

-0

GROUND FLOOR

EL 100'-0"

TRANSLUCENT

WALL PANEL

TYPE NOTES

HEAD

JAMB

SILL

W3

6'-0"

2' -0

7'

-0

GROUND FLOOR

EL 100'-0"

TYPE NOTES

HEAD

JAMB

SILL

W4

8'-0"

6" 4'

-0

EL 130'-6"

HIGH ROOF

TRANSLUCENT

WALL PANEL

TYPE NOTES

HEAD

JAMB

SILL

W5

EL 100'-0"

GROUND FLOOR

3' -2

4'

-0

'-0

4'-1 5/8"

TYPE NOTES

HEAD

JAMB

SILL

W6

EL 100'-0"

GROUND FLOOR

7' -2

'-0

4'-1 5/8"

TYPE NOTES

HEAD

JAMB

SILL

W7

EL 100'-0"

GROUND FLOOR

'-0

9'

-2

4'-4"

FINISH ABBREV LEGEND

ACOUSTICAL CEILING TILE

SEALED CONCRETE FLOOR

EXPOSED

PAINT

CERAMIC TILE BASE

CARPET TILE

RUBBER BASE

ACT

CONC

EXP

PT

CB

CPT

RB

EPOXY FLOOR COATINGEF

INTEGRAL COVE BASEICB

LINER PANELLP

TRANSITION STRIPTS

GYPSUM BOARD CEILINGGYP BD

CERAMIC FLOOR TILECFT

CERAMIC WALL TILECWT

LA

YO

U T

DR

AW

N

RE

VI

EW

ED

D0 sheetsof XX

R

EV

IS

IO

N D

AT

E

H an so n No

Fi le na m e

Sc al e

Da te

3d

W in g Ill in oi s Ai r N at io na l G ua rd Sp rin gf ie ld

, I llin oi s

3-

H an so n

Pr of es si on al

S er vi ce s In c.

S ou th

S ix th S tre et

Ph on e:

(2

) 7

-2

O kl am ho m a

C ity

, O K

8-

N G

B

ID

IQ

C on tr ac t #

W

L-

-D

B ro ad w ay E xt en si on

, S ui te

Ph on e:

(4

) 8

-2

C op yr ig ht H an so n Pr of es si on al S er vi ce s In c.

R

EP

A

IR

N D

I B U

IL

D

IN

G

P -1

SP

R

IN

G

FI

EL

D , I

L

TYPE B3 SUBMITTAL 12/12/2019

Si gn ed

/1

2/

Ex pi re s:

1/

/2

C :\U se rs

\a am

\D oc um en ts \M y R ev it\

0_ Ar ch _ a m er zT D

ZY

W

.rv t

4/ 1/

:5

5:

5 3

P M

/1

2/

R O

O M

F

IN

IS

H

S C

H

ED

UL

E, D O

O R

S C

H

ED

U

LE

G

LA

ZI

N G

E

LE

VA

TI

O N

S

AE-601

AA

M

JB

C

DOOR SCHEDULE

MARK

DOOR FRAME

NOTES

SIZE DOOR

TYPE TYPE

DETAIL

WD HGT THK HEAD JAMB SILL

100A 3'-8" 7'-0" 1 3/4" SGX S2 NEW KEYPAD ACCESS CONTROL AND MAGNETIC LOCK REQUIRED

100C 10'-0" 10'-0" 3/4" RDX STL

100D 10'-0" 10'-0" 3/4" RDX STL

100F 12'-0" 12'-0" 3/4" RDX STL

100M 3'-0" 7'-0" 1 3/4" SGX

100O 3'-0" 7'-0" S2

101A 3'-0" 7'-0" 1 3/4" SFI S2

102A 3'-0" 7'-0" 1 3/4" SFI S2

102B 3'-0" 7'-0" 1 3/4" SFGX S2 EXISTING KEYPAD ACCESS CONTROL AND MAG LOCK TO REMAIN 103A 3'-0" 7'-0" S2

104A 3'-0" 7'-0" 1 3/4" SFGI S2

105A 3'-0" 7'-0" 1 3/4" SFGX S2

107A 6'-0" 7'-0" 1 3/4" (2)SFGX D2

107B 3'-0" 7'-0" 1 3/4" SFI S2

108A 6'-0" 7'-0" 1 3/4" (2)SFGX D2

108B 6'-0" 7'-0" 1 3/4" (2)SFGX D2

109A 6'-0" 7'-0" 1 3/4" (2)SFI D2

110A 3'-0" 7'-0" 1 3/4" SFI S2

110B 3'-0" 7'-0" 1 3/4" SFGX S2

110C 8'-0" 10'-0" 3/4" RDX STL

110E 8'-0" 10'-0" 3/4" RDX STL

ROOM FINISH SCHEDULE

ROOM

NUMBER. ROOM NAME FLOOR FINISH BASE FINISH

WALL FINISHES CEILING

FINISH

CEILING

HEIGHT NOTESNORTH SOUTH EAST WEST

100 SHEET METAL SHOP EF-1 ICB-1 LP-1, PT-1 LP-1, PT-1 LP-1, PT-1 LP-1, PT-1 EXP EXPOSED TO STRUCTURE

101 OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

102 VEST. CONC RB-1 PT-1 PT-1 PT-1 PT-1 GYP BD/

PT-1

9'-0"

103 CORR. CONC RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

104 WOMEN CFT-1 CB-1 CWT-1 CWT-1, PT-1 PT-1 CWT-1 GYP BD/

PT-1

9'-0"

105 MEN CFT-1 CB-1 CWT-1 CWT-1, PT-1 CWT-1, PT-1 CWT-1, PT-1 GYP BD/

PT-1

9'-0"

106 SHEET METAL SHOP #1 EF-1 ICB-1 LP-1 PT-1 PT-1 PT-1 EXP EXPOSED TO STRUCTURE

107 MECHANICAL EF-1 ICB-1 LP-1 PT-1 PT-1 LP-1 EXP EXPOSED TO STRUCTURE

108 METALS TECH. #2 EF-1 ICB-1 PT-1 LP-1 PT-1 LP-1 EXP EXPOSED TO STRUCTURE

109 METALS TECH #1 EF-1 ICB-1 PT-1 LP-1 PT-1 PT-1 EXP EXPOSED TO STRUCTURE

110 A.G.E. #1 EF-1 ICB-1 LP-1 LP-1 LP-1 PT-1 EXP EXPOSED TO STRUCTURE

111 COMM. CLOSET EF-1 ICB-1 PT-1 PT-1 PT-1 PT-1 EXP EXPOSED TO STRUCTURE

SCALE:NTS

DOOR TYPES

SCALE:NTS

FRAME TYPES

SCALE:NTS

GLAZING ELEVATIONS2

SCALE:NTS

GLAZING ELEVATIONS1

ROOM FINISH SCHEDULE NOTES:

1. PAINT THE FIVE (5) EXISTING MAIN FRAME COLUMNS AND BEAMS PT-1.

2. PAINT THE NEW COLUMNS AND FRAMING AT THE WEST CURTAINWALL INFILL PT-1.

3. PAINT THE REINSTALLED GUARDRAIL AT THE MEZZANINE SAFETY YELLOW.

/0

7/

Ad de nd um

File details come from the government source that posted it. Updated .