This document package includes construction plans and specifications for a federal solicitation to repair Building P-17 at the 183rd Communications Squadron in Springfield, Illinois. The solicitation seeks bids to replace the roof, install new wall panels, upgrade the HVAC system, and complete other interior and exterior repairs. Bids are due by April 7th, 2021 under Solicitation Number W50S7U-21-B-0001 issued by the Department of the Army National Guard. The pre-bid site visit was held on an unspecified date to review the project scope. Plans include building elevations, sections, and details. Repairs must meet air barrier requirements, and the contractor is responsible for verifying and testing the continuous air barriers.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND FLOOR
100'-0"
HIGH ROOF
130'-6"
A B C D E
AE-301
AE-301
AE-301
AE-301
AE-311
AE-310
1" / 1'-0"1" / 1'-0"
A.2 A.8 B.1 B.6 C.1 C.5 C.9 D.2 D.8C.6C.3B.9B.5
NEW COLUMN FOR
2-TON JIB CRANE
STANDING SEAM
METAL ROOF
STANDING SEAM
METAL ROOF
ENVELOPE 1
ENVELOPE 2 ENVELOPE 3
AE-311
AE-311 SERVICE MEZZANINE
AE-501
EIFS
EIFS
INSULATED METAL
WALL PANEL
GROUND FLOOR
100'-0"
HIGH ROOF
130'-6"
12345678
AE-301
AE-301
AE-310
AE-310
AE-311
0.9 0.81.1
STANDING SEAM
METAL ROOF
STANDING SEAM
METAL ROOF
ENVELOPE 1
ENVELOPE 4
INSULATED METAL
WALL PANEL
EIFS
CANOPY
INSULATED METAL
WALL PANEL
TRANSLUCENT
WALL PANEL
EIFS ON CAST IN
PLACE CONCRETE
4"
GROUND FLOOR
100'-0"
HIGH ROOF
130'-6"
A B C
AE-301
AE-311
A.2 A.8 B.1 B.6 C.1B.9B.5
STANDING SEAM
METAL ROOF
ENVELOPE 4
INSULATED METAL
WALL PANEL
AE-501
RIGID FRAME
EIFS
GROUND FLOOR
100'-0"
HIGH ROOF
130'-6"
1 2 3 4 5 6
AE-301
AE-311
0.90.8 1.1
STANDING SEAM
METAL ROOF
AE-310
TRANSLUCENT WALL
PANEL
OVERHEAD
COILING DOOR
INSULATED METAL
WALL PANEL
INSULATED METAL
WALL PANEL
ENVELOPE 1
4"
AE-502
AE-501
LEGEND INDICATES PLANE OF
CONTINUOUS AIR BARRIER
LA
YO
U T
DR
AW
N
RE
VI
EW
ED
D0 sheetsof XX
R
EV
IS
IO
N D
AT
E
H an so n No
Fi le na m e
Sc al e
Da te
3d
W in g Ill in oi s Ai r N at io na l G ua rd Sp rin gf ie ld
, I llin oi s
3-
H an so n
Pr of es si on al
S er vi ce s In c.
S ou th
S ix th S tre et
Ph on e:
(2
) 7
-2
O kl am ho m a
C ity
, O K
8-
N G
B
ID
IQ
C on tr ac t #
W
L-
-D
B ro ad w ay E xt en si on
, S ui te
Ph on e:
(4
) 8
-2
C op yr ig ht H an so n Pr of es si on al S er vi ce s In c.
R
EP
A
IR
N D
I B U
IL
D
IN
G
P -1
SP
R
IN
G
FI
EL
D , I
L
TYPE B3 SUBMITTAL 12/12/2019
Si gn ed
/1
2/
Ex pi re s:
1/
/2
C :\U se rs
\a am
\D oc um en ts \M y R ev it\
0_ Ar ch _ a m er zT D
ZY
W
.rv t
4/ 1/
:5
6:
2 6
P M
/1
2/
B U
IL
D
IN
G
S
EC
TI
O
N S
AE-301
AA
M
JB
C
0 4' 8' 16'
1/8" = 1'-0"
GENERAL NOTES
SCALE: 1/8" = 1'-0"
1 BUILDING SECTION
SCALE: 1/8" = 1'-0"
2 BUILDING SECTION
SCALE: 1/8" = 1'-0"
3 BUILDING SECTION
SCALE: 1/8" = 1'-0"
4 BUILDING SECTION
A. ACCORDING TO UFC 3-101-01 PARAGRAPH 3-6.3,
HANGAR BAYS AND MAINTENANCE BAY FACILITIES
REQUIRE AIR BARRIER INSPECTION ONLY.
CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER
WHEN INSPECTION IS SCHEDULED.
B. THE CONTRACTOR SHALL REFERENCE WALL
SECTIONS AND DETAILS THAT GRAPHICALLY
INDICATE THE VISUAL PLANE OF THE INTENDED
CONTINUOUS AIR BARRIERS. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL
INTENDED CONTINUOUS AIR BARRIERS ARE IN PLACE
PRIOR TO TESTING PER ASHRAE 189.1. FOR
AIRFORCE PROJECTS THE BUILDING AIR LEAKAGE
RATE MUST BE DETERMINED BY TESTING TO 0.2 IN.
WATER (50 PA) AND EXTRAPOLATING THE TEST
RESULTS TO 0.3 IN. WATER (75 PA). THE BUILDING AIR
LEAKAGE RATE FOR AIR FORCE PROJECTS MUST
NOT EXCEED 0.4 CFM/FT SQUARED WHEN TEST
RESULTS ARE EXTRAPOLATED TO 0.3 INCHES WATER
(75 PA). USE OF 0.2 INCHES WATER (50 PA) TEST
PRESSURE ALLOWS FOR THE USE OF THE BUILDING
HVAC SYSTEM TO PROVIDE TEST PRESSURE.
C. THE CONTRACTOR SHALL JOIN AND SEAL THE AIR
BARRIER MATERIAL OF EACH ASSEMBLY IN A
FLEXIBLE MANNER TO THE AIR BARRIER OF
ADJACENT ASSEMBLIES AND COMPONENTS.
D. THE CONTRACTOR SHALL MAKE ALL PENETRATIONS
AIRTIGHT INCLUDING INCIDENTAL OPENINGS AT OR
AROUND ELECTRICAL BOXES, CONDUIT, PLUMBING,
AND OTHER ASSEMBLIES.
/0
7/
Ad de nd um
File details come from the government source that posted it. Updated .