This document package includes construction plans and specifications for a federal solicitation to repair Building P-17 at the 183rd Communications Squadron in Springfield, Illinois. The solicitation seeks bids to replace the roof, install new wall panels, upgrade the HVAC system, and complete other interior and exterior repairs. Bids are due by April 7th, 2021 under Solicitation Number W50S7U-21-B-0001 issued by the Department of the Army National Guard. The pre-bid site visit was held on an unspecified date to review the project scope. Plans include building elevations, sections, and details. Repairs must meet air barrier requirements, and the contractor is responsible for verifying and testing the continuous air barriers.

View the file

Other files

File Type Posted
Bid Opening Sign in.pdf PDF
Bid Opening Report- Repair CRF Building 17 W50S7U-21-B-0001.pdf PDF
W50S7U-21-B-0001-0001 Amendment 0001.pdf PDF
SECTION 074213.13 - FORMED METAL WALL PANELS.pdf PDF
DCFT 102008 RFI Repsonse 4 Roof and Wall Panels Sec 07413.13.docx DOCX document
DCFT 102008 RFI Response 3.docx DOCX document
DS Boot 2.jpg JPG image
DS Boot 3.jpg JPG image
DCFT 102008 RFI Response 3 - Door Hardware Sets.docx DOCX document
DS Boot 1.jpg JPG image
009113_1 fl - addenda_No1.pdf PDF
61650_Arch_amerzTDZYW-183WG-2090209.png PNG image
009113_2 fl - addenda_No2.pdf PDF
61650_Arch_amerzTDZYW-4-1309292.JPG JPG image
61650_Arch_amerzTDZYW-fsb-fdg-jv-logo-2ver-2090207.png PNG image
61650_Arch_amerzTDZYW-3-1309490.JPG JPG image
DCFT 102008 - RFI-RESPONSE 2.docx DOCX document
61650_Arch_amerzTDZYW-2-1309322.JPG JPG image
61650_Arch_amerzTDZYW-6-1309001.JPG JPG image
61650_Arch_amerzTDZYW-5-1307452.jpg JPG image
61650_Arch_amerzTDZYW-1-1151913.JPG JPG image
123661.16 - SOLID SURFACING COUNTERTOPS.pdf PDF
RFI Response 1 W50S7U-21-B-0001.pdf PDF
A-001.pdf PDF
AD-101.pdf PDF
AE-310.pdf PDF
AE-103.pdf PDF
AE-311.pdf PDF
AE-601.pdf PDF
102800 - TOILET_ BATH_ AND LAUNDRY ACCESSORIES.pdf PDF
AE-401.pdf PDF
105113 - METAL LOCKERS.pdf PDF
090690 - COLOR SCHEDULE.pdf PDF
009113_3 fl - addenda_No3.pdf PDF
A-002.pdf PDF
P17 Reference Civil_Struct_Arch Dwgs Binder.zip ZIP file
Site Visit Sign-In Sheet CES Repair CRF P-17.pdf PDF
Site Visit Slides - CES Repair CRF P-17.pdf PDF
P17 Reference Canopy Door Dwgs Binder.zip ZIP file
P17 Reference Mech_Elect Dwgs Binder.zip ZIP file
SF 1705.pdf PDF
W50S7U-21-B-0001 -Solicitation - Repair Centralized Repair Facility Building P-17.pdf PDF
SOW - 102008 Final.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUND FLOOR

100'-0"

HIGH ROOF

130'-6"

A B C D E

AE-301

AE-301

AE-301

AE-301

AE-311

AE-310

1" / 1'-0"1" / 1'-0"

A.2 A.8 B.1 B.6 C.1 C.5 C.9 D.2 D.8C.6C.3B.9B.5

NEW COLUMN FOR

2-TON JIB CRANE

STANDING SEAM

METAL ROOF

STANDING SEAM

METAL ROOF

ENVELOPE 1

ENVELOPE 2 ENVELOPE 3

AE-311

AE-311 SERVICE MEZZANINE

AE-501

EIFS

EIFS

INSULATED METAL

WALL PANEL

GROUND FLOOR

100'-0"

HIGH ROOF

130'-6"

12345678

AE-301

AE-301

AE-310

AE-310

AE-311

0.9 0.81.1

STANDING SEAM

METAL ROOF

STANDING SEAM

METAL ROOF

ENVELOPE 1

ENVELOPE 4

INSULATED METAL

WALL PANEL

EIFS

CANOPY

INSULATED METAL

WALL PANEL

TRANSLUCENT

WALL PANEL

EIFS ON CAST IN

PLACE CONCRETE

4"

GROUND FLOOR

100'-0"

HIGH ROOF

130'-6"

A B C

AE-301

AE-311

A.2 A.8 B.1 B.6 C.1B.9B.5

STANDING SEAM

METAL ROOF

ENVELOPE 4

INSULATED METAL

WALL PANEL

AE-501

RIGID FRAME

EIFS

GROUND FLOOR

100'-0"

HIGH ROOF

130'-6"

1 2 3 4 5 6

AE-301

AE-311

0.90.8 1.1

STANDING SEAM

METAL ROOF

AE-310

TRANSLUCENT WALL

PANEL

OVERHEAD

COILING DOOR

INSULATED METAL

WALL PANEL

INSULATED METAL

WALL PANEL

ENVELOPE 1

4"

AE-502

AE-501

LEGEND INDICATES PLANE OF

CONTINUOUS AIR BARRIER

LA

YO

U T

DR

AW

N

RE

VI

EW

ED

D0 sheetsof XX

R

EV

IS

IO

N D

AT

E

H an so n No

Fi le na m e

Sc al e

Da te

3d

W in g Ill in oi s Ai r N at io na l G ua rd Sp rin gf ie ld

, I llin oi s

3-

H an so n

Pr of es si on al

S er vi ce s In c.

S ou th

S ix th S tre et

Ph on e:

(2

) 7

-2

O kl am ho m a

C ity

, O K

8-

N G

B

ID

IQ

C on tr ac t #

W

L-

-D

B ro ad w ay E xt en si on

, S ui te

Ph on e:

(4

) 8

-2

C op yr ig ht H an so n Pr of es si on al S er vi ce s In c.

R

EP

A

IR

N D

I B U

IL

D

IN

G

P -1

SP

R

IN

G

FI

EL

D , I

L

TYPE B3 SUBMITTAL 12/12/2019

Si gn ed

/1

2/

Ex pi re s:

1/

/2

C :\U se rs

\a am

\D oc um en ts \M y R ev it\

0_ Ar ch _ a m er zT D

ZY

W

.rv t

4/ 1/

:5

6:

2 6

P M

/1

2/

B U

IL

D

IN

G

S

EC

TI

O

N S

AE-301

AA

M

JB

C

0 4' 8' 16'

1/8" = 1'-0"

GENERAL NOTES

SCALE: 1/8" = 1'-0"

1 BUILDING SECTION

SCALE: 1/8" = 1'-0"

2 BUILDING SECTION

SCALE: 1/8" = 1'-0"

3 BUILDING SECTION

SCALE: 1/8" = 1'-0"

4 BUILDING SECTION

A. ACCORDING TO UFC 3-101-01 PARAGRAPH 3-6.3,

HANGAR BAYS AND MAINTENANCE BAY FACILITIES

REQUIRE AIR BARRIER INSPECTION ONLY.

CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER

WHEN INSPECTION IS SCHEDULED.

B. THE CONTRACTOR SHALL REFERENCE WALL

SECTIONS AND DETAILS THAT GRAPHICALLY

INDICATE THE VISUAL PLANE OF THE INTENDED

CONTINUOUS AIR BARRIERS. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL

INTENDED CONTINUOUS AIR BARRIERS ARE IN PLACE

PRIOR TO TESTING PER ASHRAE 189.1. FOR

AIRFORCE PROJECTS THE BUILDING AIR LEAKAGE

RATE MUST BE DETERMINED BY TESTING TO 0.2 IN.

WATER (50 PA) AND EXTRAPOLATING THE TEST

RESULTS TO 0.3 IN. WATER (75 PA). THE BUILDING AIR

LEAKAGE RATE FOR AIR FORCE PROJECTS MUST

NOT EXCEED 0.4 CFM/FT SQUARED WHEN TEST

RESULTS ARE EXTRAPOLATED TO 0.3 INCHES WATER

(75 PA). USE OF 0.2 INCHES WATER (50 PA) TEST

PRESSURE ALLOWS FOR THE USE OF THE BUILDING

HVAC SYSTEM TO PROVIDE TEST PRESSURE.

C. THE CONTRACTOR SHALL JOIN AND SEAL THE AIR

BARRIER MATERIAL OF EACH ASSEMBLY IN A

FLEXIBLE MANNER TO THE AIR BARRIER OF

ADJACENT ASSEMBLIES AND COMPONENTS.

D. THE CONTRACTOR SHALL MAKE ALL PENETRATIONS

AIRTIGHT INCLUDING INCIDENTAL OPENINGS AT OR

AROUND ELECTRICAL BOXES, CONDUIT, PLUMBING,

AND OTHER ASSEMBLIES.

/0

7/

Ad de nd um

File details come from the government source that posted it. Updated .