AD-101.pdf

PDF 2 MB Posted

Attached to
183 CES Repair CRF Building P-17
Solicitation number
W50S7U-21-B-0001
Issued by

About this file

This document package includes plans and specifications for a construction project. The United States Army National Guard is soliciting fixed-price bids for repairs to Building P-17 at the 183rd Combat Readiness Facility in Springfield, Illinois. Work includes demolition of existing structures, installation of new walls and roofing, HVAC system replacement, and site work. Bids are due by the date and time specified in solicitation number W50S7U-21-B-0001. Plans, specifications, statements of work and site visit details are provided to assist contractors in preparing responses for this opportunity.

View the file

Other files

File Type Posted
Bid Opening Sign in.pdf PDF
Bid Opening Report- Repair CRF Building 17 W50S7U-21-B-0001.pdf PDF
W50S7U-21-B-0001-0001 Amendment 0001.pdf PDF
SECTION 074213.13 - FORMED METAL WALL PANELS.pdf PDF
DCFT 102008 RFI Repsonse 4 Roof and Wall Panels Sec 07413.13.docx DOCX document
DCFT 102008 RFI Response 3.docx DOCX document
DS Boot 2.jpg JPG image
DS Boot 3.jpg JPG image
DCFT 102008 RFI Response 3 - Door Hardware Sets.docx DOCX document
DS Boot 1.jpg JPG image
009113_1 fl - addenda_No1.pdf PDF
61650_Arch_amerzTDZYW-183WG-2090209.png PNG image
009113_2 fl - addenda_No2.pdf PDF
61650_Arch_amerzTDZYW-4-1309292.JPG JPG image
61650_Arch_amerzTDZYW-fsb-fdg-jv-logo-2ver-2090207.png PNG image
61650_Arch_amerzTDZYW-3-1309490.JPG JPG image
DCFT 102008 - RFI-RESPONSE 2.docx DOCX document
61650_Arch_amerzTDZYW-2-1309322.JPG JPG image
61650_Arch_amerzTDZYW-6-1309001.JPG JPG image
61650_Arch_amerzTDZYW-5-1307452.jpg JPG image
61650_Arch_amerzTDZYW-1-1151913.JPG JPG image
123661.16 - SOLID SURFACING COUNTERTOPS.pdf PDF
RFI Response 1 W50S7U-21-B-0001.pdf PDF
A-001.pdf PDF
AE-310.pdf PDF
AE-103.pdf PDF
AE-311.pdf PDF
AE-601.pdf PDF
102800 - TOILET_ BATH_ AND LAUNDRY ACCESSORIES.pdf PDF
AE-301.pdf PDF
AE-401.pdf PDF
105113 - METAL LOCKERS.pdf PDF
090690 - COLOR SCHEDULE.pdf PDF
009113_3 fl - addenda_No3.pdf PDF
A-002.pdf PDF
P17 Reference Civil_Struct_Arch Dwgs Binder.zip ZIP file
Site Visit Sign-In Sheet CES Repair CRF P-17.pdf PDF
Site Visit Slides - CES Repair CRF P-17.pdf PDF
P17 Reference Canopy Door Dwgs Binder.zip ZIP file
P17 Reference Mech_Elect Dwgs Binder.zip ZIP file
SF 1705.pdf PDF
W50S7U-21-B-0001 -Solicitation - Repair Centralized Repair Facility Building P-17.pdf PDF
SOW - 102008 Final.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

BB

CC

DD

EE

1 1 1

2,3

242526

28 29 30

8'-8" 3'-4" 6'-0" 6'-0" 1

AE

-6

AE

-6

'-0

AE-501

3'-0" 11'-0"

7 7

6' -4

6'

-5

2'-11 1/2"6'-4"

DEMOLITION LEGEND

ITEM TO BE DEMOLISHED

ITEM TO REMAIN

FLOOR SLAB TO BE DEMOLISHED

# INDICATES PHOTO REFERENCE ON

SHEETS AD-101, AD-102, AD-103

LA

YO

U T

DR

AW

N

RE

VI

EW

ED

D0 sheetsof XX

R

EV

IS

IO

N D

AT

E

H an so n No

Fi le na m e

Sc al e

Da te

3d

W in g Ill in oi s Ai r N at io na l G ua rd Sp rin gf ie ld

, I llin oi s

3-

H an so n

Pr of es si on al

S er vi ce s In c.

S ou th

S ix th S tre et

Ph on e:

(2

) 7

-2

O kl am ho m a

C ity

, O K

8-

N G

B

ID

IQ

C on tr ac t #

W

L-

-D

B ro ad w ay E xt en si on

, S ui te

Ph on e:

(4

) 8

-2

C op yr ig ht H an so n Pr of es si on al S er vi ce s In c.

R

EP

A

IR

N D

I B U

IL

D

IN

G

P -1

SP

R

IN

G

FI

EL

D , I

L

TYPE B3 SUBMITTAL 12/12/2019

Si gn ed

/1

2/

Ex pi re s:

1/

/2

C :\U se rs

\a am

\D oc um en ts \M y R ev it\

0_ Ar ch _ a m er zT D

ZY

W

.rv t

4/ 1/

:5

5:

3 7

P M

/1

2/

D

EM

O

LI

TI

O

N P

LA

N

A N

D P

H O

TO

S

AD-101

AA

M

JB

C

SCALE: 1/8" = 1'-0"

1 DEMOLITION PLAN

GENERAL NOTES

SHEET KEYNOTES

0 4' 8' 16'

1/8" = 1'-0"

1. REMOVE CONCRETE SLAB ON GRADE IN AREAS

SHOWN HATCHED. REFER TO PLUMBING DRAWINGS

FOR UNDER SLAB PLUMBING DEMOLITION.

2. REMOVE HANGAR DOOR, HANGAR DOOR TRACK AND

ASSOCIATED OPERATING EQUIPMENT.

3. REMOVE EXISTING TRENCH DRAIN.

4. REMOVE AND SALVAGE EXISTING MEZZANINE.

REINSTALL IN ORIGINAL LOCATION, RECONFIGURE

AND PAINT.

5. REMOVE AND SALVAGE EXISTING PAINT BOOTH AND

TURN OVER IL ANG.

6. REMOVE ALL EXISTING CEILING TILES, GYP BD

CEILINGS, LIGHT FIXTURES, DIFFUSERS AND ANY

ITEM ATTACHED TO THE CEILING.

7. DEMO SLAB AT EMERGENCY EYEWASH/SHOWER.

A. CONTRACTOR TO FIELD VERIFY EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO ANY

FABRICATION OF MATERIAL.

B. NOT ALL DEMOLITION ITEMS ARE ON THE SHEETS,

CONTRACTOR MUST REVIEW ALL SHEETS IN ALL

DISCIPLINES TO LOCATE ALL DEMO ITEMS. FOR

CLARITY SOME DEMO ITEMS ARE IN DETAILS,

SECTIONS, PLANS, ELEVATIONS, ETC.

C. REMOVE ALL EXTERIOR WALL FINISHES DOWN TO

THE STRUCTURAL STEEL GIRTS AT ALL EXTERIOR

WALLS. WALLS SHOWN DASHED ARE INDICATED TO

BE DEMOLISHED. REFER TO SHEET AE-101 FOR NEW

WALL CONSTRUCTION.

D. REMOVE ALL STANDING SEAM METAL ROOF

ELEMENTS DOWN TO THE STRUCTURAL PURLIN.

E. REMOVE ALL EXISTING RESTROOM WATER CLOSETS,

URINALS, SINKS, ACCESSORIES AND ASSOCIATED

ELEMENTS.

F. REMOVE ALL EXISTING CEILING TILES, GYP BD

CEILINGS, LIGHT FIXTURES, DIFFUSERS AND ANY

ITEM ATTACHED TO THE CEILING.

G. GOVERNMENT WILL REMOVE ALL EXISTING UN-

ATTACHED EQUIPMENT, INCLUDING PLASTIC

WRAPPED DUST BOOTH STORED UNDER THE

EXISTING MEZZANINE.

H. EXISTING X-RAY MACHINE - GOVERNMENT TO

REMOVE. X-RAY WALLS AND LEAD LINER (FLOOR

WALLS, AND CEILING) TO BE REMOVED AND

RECYCLED BY CONTRACTOR.

I. DEMOLITION WASTE SHALL BE RECYCLED OR

DISPOSED OF IN ACCORDANCE WITH SPECIFICATION

SECTIONS 01 33 29 - SUSTAINABILITY REPORTING. 01

35 43 - ENVIRONMENTAL PROTECTION. AND 01 74 19 -

CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL. REFER TO SPECIFICATION SECTION 00 31

26 - EXISTING HAZARDOUS MATERIAL INFORMATION

FOR KNOWN HAZARDOUS MATERIALS.

J. REFER TO STRUCTURAL DETAILS ON SD-101 FOR

DEMOLITION DETAIL AT FOUNDATION WALL FOR NEW

DOOR OPENINGS.

1: REMOVE AND SALVAGE

EXISTING PAINT BOOTH

AND TURN OVER IL ANG.

REMOVE EXISTING

SECTIONAL DOOR AND

ACCESSORIES.

2: REMOVE AND

SALVAGE EXISTING

MEZZANINE. REINSTALL

IN ORIGINAL LOCATION,

RECONFIGURE AND

PAINT.

3: REMOVE AND SALVAGE EXISTING

MEZZANINE. REINSTALL IN ORIGINAL

LOCATION, RECONFIGURE AND PAINT.

4: REMOVE ALL EXISTING PIPING

AND CONDUITS ATTACHED TO

WALLS. ALL EXISTING HIGH BAY GAS

FIRED INFARED HEATERS TO BE

REMOVED AND REINSTALLED.

6: REMOVE EXISTING METAL

WALL PANEL SHOWN.

HEATING & AIR CONDITIONING SYSTEM:

A. THE EXISTING GAS-FIRED HEATERS LOCATED IN THE HANGAR BAY WILL REMAIN FOR

CONTINUED USE. THE REMAINING PIECES OF EXISTING EQUIPMENT INSTALLED

THROUGHOUT THE BUILDING INCLUDING HOT WATER HEATING SYSTEM BOILERS,

PUMPS, AND PIPING, HOT WATER FAN COIL UNITS, HOT WATER UNIT HEATERS, AIR

COOLED CONDENSING UNITS AND THE GAS-FIRED INFARED HEATER LOCATED IN THE

STORAGE BAY WEST OF THE CURRENT JOAP OFFICE WILL BE REMOVED.

N

5: GOVERNMENT TO REMOVE

EXISTING X-RAY MACHINE.

CONTRACTOR TO REMOVE LEAD

LINING IN FLOOR, WALLS AND CEILING.

RECYCLE LEAD LINING IF POSSIBLE.

5: STEAM/BOILER

FED UNIT HEATERS

TO BE REMOVED

5: REMOVE

EXISTING HOIST

BEAM

PLAN NORTH

/0

7/

Ad de nd um

File details come from the government source that posted it. Updated .