AD-101.pdf
PDF 2 MB Posted
- Attached to
- 183 CES Repair CRF Building P-17
- Solicitation number
- W50S7U-21-B-0001
- Issued by
-
Department of the Army National Guard
About this file
This document package includes plans and specifications for a construction project. The United States Army National Guard is soliciting fixed-price bids for repairs to Building P-17 at the 183rd Combat Readiness Facility in Springfield, Illinois. Work includes demolition of existing structures, installation of new walls and roofing, HVAC system replacement, and site work. Bids are due by the date and time specified in solicitation number W50S7U-21-B-0001. Plans, specifications, statements of work and site visit details are provided to assist contractors in preparing responses for this opportunity.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AA
BB
CC
DD
EE
1 1 1
2,3
242526
28 29 30
8'-8" 3'-4" 6'-0" 6'-0" 1
AE
-6
AE
-6
'-0
AE-501
3'-0" 11'-0"
7 7
6' -4
6'
-5
2'-11 1/2"6'-4"
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
FLOOR SLAB TO BE DEMOLISHED
# INDICATES PHOTO REFERENCE ON
SHEETS AD-101, AD-102, AD-103
LA
YO
U T
DR
AW
N
RE
VI
EW
ED
D0 sheetsof XX
R
EV
IS
IO
N D
AT
E
H an so n No
Fi le na m e
Sc al e
Da te
3d
W in g Ill in oi s Ai r N at io na l G ua rd Sp rin gf ie ld
, I llin oi s
3-
H an so n
Pr of es si on al
S er vi ce s In c.
S ou th
S ix th S tre et
Ph on e:
(2
) 7
-2
O kl am ho m a
C ity
, O K
8-
N G
B
ID
IQ
C on tr ac t #
W
L-
-D
B ro ad w ay E xt en si on
, S ui te
Ph on e:
(4
) 8
-2
C op yr ig ht H an so n Pr of es si on al S er vi ce s In c.
R
EP
A
IR
N D
I B U
IL
D
IN
G
P -1
SP
R
IN
G
FI
EL
D , I
L
TYPE B3 SUBMITTAL 12/12/2019
Si gn ed
/1
2/
Ex pi re s:
1/
/2
C :\U se rs
\a am
\D oc um en ts \M y R ev it\
0_ Ar ch _ a m er zT D
ZY
W
.rv t
4/ 1/
:5
5:
3 7
P M
/1
2/
D
EM
O
LI
TI
O
N P
LA
N
A N
D P
H O
TO
S
AD-101
AA
M
JB
C
SCALE: 1/8" = 1'-0"
1 DEMOLITION PLAN
GENERAL NOTES
SHEET KEYNOTES
0 4' 8' 16'
1/8" = 1'-0"
1. REMOVE CONCRETE SLAB ON GRADE IN AREAS
SHOWN HATCHED. REFER TO PLUMBING DRAWINGS
FOR UNDER SLAB PLUMBING DEMOLITION.
2. REMOVE HANGAR DOOR, HANGAR DOOR TRACK AND
ASSOCIATED OPERATING EQUIPMENT.
3. REMOVE EXISTING TRENCH DRAIN.
4. REMOVE AND SALVAGE EXISTING MEZZANINE.
REINSTALL IN ORIGINAL LOCATION, RECONFIGURE
AND PAINT.
5. REMOVE AND SALVAGE EXISTING PAINT BOOTH AND
TURN OVER IL ANG.
6. REMOVE ALL EXISTING CEILING TILES, GYP BD
CEILINGS, LIGHT FIXTURES, DIFFUSERS AND ANY
ITEM ATTACHED TO THE CEILING.
7. DEMO SLAB AT EMERGENCY EYEWASH/SHOWER.
A. CONTRACTOR TO FIELD VERIFY EXISTING
CONDITIONS AND DIMENSIONS PRIOR TO ANY
FABRICATION OF MATERIAL.
B. NOT ALL DEMOLITION ITEMS ARE ON THE SHEETS,
CONTRACTOR MUST REVIEW ALL SHEETS IN ALL
DISCIPLINES TO LOCATE ALL DEMO ITEMS. FOR
CLARITY SOME DEMO ITEMS ARE IN DETAILS,
SECTIONS, PLANS, ELEVATIONS, ETC.
C. REMOVE ALL EXTERIOR WALL FINISHES DOWN TO
THE STRUCTURAL STEEL GIRTS AT ALL EXTERIOR
WALLS. WALLS SHOWN DASHED ARE INDICATED TO
BE DEMOLISHED. REFER TO SHEET AE-101 FOR NEW
WALL CONSTRUCTION.
D. REMOVE ALL STANDING SEAM METAL ROOF
ELEMENTS DOWN TO THE STRUCTURAL PURLIN.
E. REMOVE ALL EXISTING RESTROOM WATER CLOSETS,
URINALS, SINKS, ACCESSORIES AND ASSOCIATED
ELEMENTS.
F. REMOVE ALL EXISTING CEILING TILES, GYP BD
CEILINGS, LIGHT FIXTURES, DIFFUSERS AND ANY
ITEM ATTACHED TO THE CEILING.
G. GOVERNMENT WILL REMOVE ALL EXISTING UN-
ATTACHED EQUIPMENT, INCLUDING PLASTIC
WRAPPED DUST BOOTH STORED UNDER THE
EXISTING MEZZANINE.
H. EXISTING X-RAY MACHINE - GOVERNMENT TO
REMOVE. X-RAY WALLS AND LEAD LINER (FLOOR
WALLS, AND CEILING) TO BE REMOVED AND
RECYCLED BY CONTRACTOR.
I. DEMOLITION WASTE SHALL BE RECYCLED OR
DISPOSED OF IN ACCORDANCE WITH SPECIFICATION
SECTIONS 01 33 29 - SUSTAINABILITY REPORTING. 01
35 43 - ENVIRONMENTAL PROTECTION. AND 01 74 19 -
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL. REFER TO SPECIFICATION SECTION 00 31
26 - EXISTING HAZARDOUS MATERIAL INFORMATION
FOR KNOWN HAZARDOUS MATERIALS.
J. REFER TO STRUCTURAL DETAILS ON SD-101 FOR
DEMOLITION DETAIL AT FOUNDATION WALL FOR NEW
DOOR OPENINGS.
1: REMOVE AND SALVAGE
EXISTING PAINT BOOTH
AND TURN OVER IL ANG.
REMOVE EXISTING
SECTIONAL DOOR AND
ACCESSORIES.
2: REMOVE AND
SALVAGE EXISTING
MEZZANINE. REINSTALL
IN ORIGINAL LOCATION,
RECONFIGURE AND
PAINT.
3: REMOVE AND SALVAGE EXISTING
MEZZANINE. REINSTALL IN ORIGINAL
LOCATION, RECONFIGURE AND PAINT.
4: REMOVE ALL EXISTING PIPING
AND CONDUITS ATTACHED TO
WALLS. ALL EXISTING HIGH BAY GAS
FIRED INFARED HEATERS TO BE
REMOVED AND REINSTALLED.
6: REMOVE EXISTING METAL
WALL PANEL SHOWN.
HEATING & AIR CONDITIONING SYSTEM:
A. THE EXISTING GAS-FIRED HEATERS LOCATED IN THE HANGAR BAY WILL REMAIN FOR
CONTINUED USE. THE REMAINING PIECES OF EXISTING EQUIPMENT INSTALLED
THROUGHOUT THE BUILDING INCLUDING HOT WATER HEATING SYSTEM BOILERS,
PUMPS, AND PIPING, HOT WATER FAN COIL UNITS, HOT WATER UNIT HEATERS, AIR
COOLED CONDENSING UNITS AND THE GAS-FIRED INFARED HEATER LOCATED IN THE
STORAGE BAY WEST OF THE CURRENT JOAP OFFICE WILL BE REMOVED.
N
5: GOVERNMENT TO REMOVE
EXISTING X-RAY MACHINE.
CONTRACTOR TO REMOVE LEAD
LINING IN FLOOR, WALLS AND CEILING.
RECYCLE LEAD LINING IF POSSIBLE.
5: STEAM/BOILER
FED UNIT HEATERS
TO BE REMOVED
5: REMOVE
EXISTING HOIST
BEAM
PLAN NORTH
/0
7/
Ad de nd um
File details come from the government source that posted it. Updated .