This document is an Amendment of Solicitation (Standard Form 30) for a Multiple Award Task Order Contract (MATOC) for construction services, issued by the U.S. Army. The amendment extends the solicitation response date to August 28th, 2025, with a submission time changed from 4:00 PM to 2:00 PM. The government intends to award indefinite delivery, indefinite quantity (IDIQ) contracts to all qualifying offerors who submit technically acceptable proposals.
Key evaluation factors include: 1) Corporate Experience - requiring four to five projects demonstrating capabilities in new construction, roof installation/repair, mechanical systems, and facility renovation, with specific minimum project values; 2) Past Performance - assessing quality, timeliness, cost control, and reference ratings; and 3) Single Project Bonding Capability - requiring a surety letter confirming ability to bond at least $1,000,000 for a single construction project. Proposals will be evaluated on an acceptable/unacceptable basis, with the government planning to award multiple contracts without holding discussions, except for potential clarifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S7L25RA003 - Pre-Proposal Conference.pptx | PPTX presentation | |
| Solicitation Amendment - W50S7L25RA0030002.pdf | ||
| MFR Question-Answer amd 2_CS.pdf | ||
| W50S7L25RA003 conf Sign-in roster.pdf | ||
| W50S7L25RA0030001 SF 30.pdf | ||
| W50S7L25RA0030001.pdf | ||
| U09 MATOC EXHIBIT B - PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| Solicitation - W50S7L25RA003_250721.pdf | ||
| U08 MATOC EXHIBIT A - PERFORMANCE RELEVANCY QUESTIONNAIRE.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The purpose of this amendment is to make Block 14 (Description of Amendment/Modification):
changes section 00 22 16, paragraph 3.1.2 b-d and remove the word "within the state of Montana" from each paragraph.
2. Question and answers will be attached to the amendment at the SAM.gov
3. The solicitation conference slides and sign in roster will be attached.
4. The solicitation will be extended by seven days to August 28th. 2025, however the submission by time is changed from 4:00 PM to 2:00 PM.
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Time 04:00 PM 02:00 PM Response Due Date 21 Aug 2025 28 Aug 2025
Section 00 22 16 - Supplementary Instructions to Proposers
Miscellaneous text in this section has been modified to:
PROPOSAL EVALUATIONS AND BASIS FOR AWARD
GENERAL INFORMATION
1. BASIS FOR AWARD
1.1. The Government intends to award Multiple Award Task Order Contracts (MATOCs) from this solicitation. An indefinite delivery indefinite quantity (IDIQ) contract will be awarded to all qualifying offerors in accordance with FAR 15.304(c)(1)(ii)(A). A "qualifying offeror", in accordance with FAR 2.101, is one that is determined to be a responsible source, submits a technically acceptable proposal that conforms to the requirements of the solicitation, and the contracting officer has no reason to believe would be likely to offer other than fair and reasonable pricing. For this evaluation process, interested offerors submit specific experience and past performance proposals for review and consideration by the Government. The Government will evaluate these proposals in accordance with the criteria described herein.
W50S7L25RA0030002
1.2. The Government intends to make the MATOC awards without holding discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, offerors should include their best terms and conditions in their initial offer. Offerors should not assume they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government reserves the right to conduct discussions if the Source Selection Authority (SSA) later determines them to be necessary. By submitting an offer in response to this solicitation, offerors are agreeing to comply with all terms and conditions contained in the solicitation.
1.3. The source selection process will be conducted in accordance with FAR Subpart 15.3, Source Selection procedures. Offers will be evaluated using the criteria listed in "Evaluation Factors for Award." Noncompliance with the RFP requirements may raise serious questions regarding an offeror's technical ability, past performance and/or pricing and may be grounds to eliminate the proposal from consideration for contract award. Failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
1.4. The Contracting Officer will begin the evaluation process by conducting a proposal compliance review for all timely-received proposals for determination of basic proposal adequacy prior to providing the proposals to the evaluators. Failure to provide a complete proposal may result in the proposal being removed from further consideration for award. Failure to address any evaluation factor shall be grounds for elimination from evaluation and consideration for award.
1.5. ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. By submission of the offer, the Offeror agrees that all items proposed (if applicable e.g., key personnel, subcontractors, etc.) will be utilized for the duration of the contract and any substitutions shall require prior Contracting Officer's approval.
2. EVALUATION APPROACH
2.1. All proposals shall be subject to evaluation by the Source Selection Evaluation Board (SSEB). The overarching evaluation approach for all factors and subfactors is as follows:
The proposal submitted will be used to determine whether the offeror is a responsible source, has a proposal that meets the requirements of the solicitation, and provides no reason why the offeror would likely offer other than fair and reasonable pricing.
2.2. The Contracting Officer and Contract Specialist will initiate the source selection process and assemble the SSEB, providing them the proposals that meet the solicitation requirements. Proposals that don't meet these requirements won't be reviewed further by the SSEB. A detailed debriefing will not be available for those proposals not selected for review by the SSEB. While the intent is to award without discussions, clarifications may be made to clarify certain aspects of the proposal or resolve minor or clerical errors consistent with FAR 15.306(a).
2.3. Proposals will be evaluated consistent with the uniform evaluation procedure set forth in this section of the solicitation. The SSEB will conduct an in-depth review and evaluation of all conforming proposals against the factors established in the solicitation. Each member of the SSEB will independently evaluate all information provided in a proposal against the prescribed evaluation factors. The overall evaluation approach for all factors will include evaluating proposals to determine if the offerors proposal satisfies the requirements specified in the solicitation.
2.4. The proposals will be evaluated for technical acceptability (including past performance); they will not be ranked. For an offeror to be considered for award, the proposal must receive an "Acceptable" rating for each evaluation factor. A proposal receiving a rating of "Unacceptable" in any factor will not be eligible for award.
2.5. After SSEB members independently evaluate the proposals, proposal evaluations will then be discussed among the SSEB voting members to reach a consensus on each evaluation factor and on the overall proposal. The results of the evaluations will be summarized in an SSEB report, which will be forwarded to the Source Selection Authority (SSA) for use in making a final award decision. As indicated, awards will be made to all qualifying offerors. The final selection of contractors will be made from the single evaluation.
2.6. Offerors are reminded that unsupported promises to comply with contractual requirements will not be sufficient. Proposals must not merely repeat back the contractual requirements, but rather provide substantive, understandable and realistic evidence to support promised performance.
3. EVALUATION FACTORS
All evaluation factors are to be considered equally.
3.1. Factor 1. Corporate Experience.
3.1.1. The Government will evaluate four (4) but no more than five (5) projects that have been performed by the offeror/team member and for which the offeror was the prime contractor performing and /or managing the work. The projects shall demonstrate the offeror's experience in performance of work similar to the work required by this solicitation. If fewer than four (4) projects are submitted, the offeror will be considered ineligible for award. If more than five (5) projects are submitted, only the first five (5) projects as identified in the proposal will be evaluated.
3.1.2. Offerors must submit projects that meet one or more of the following criteria:
a. At least one (1) of the submitted projects for new construction within the state of Montana. The value of at least one (1) project submitted in this category shall have an award value of no less than $250,000.00.
b. At least one (1) of the submitted projects for roof installation or repair. The project(s) shall convey experience with repair and/or replacement of standard roofing types. The value of at least one (1) project submitted in this category shall have a total award value of no less than $100,000.00. If submitting a general new construction or renovation project that included roofing, offeror shall clearly specify the percentage and dollar value of the project attributed to roofing. The value attributed to roofing shall be at least $100,000.00. The same project cannot be submitted for multiple types of experience.
c. At least one (1) of the submitted projects for construction, repair, or alteration of a mechanical system (e.g., HVAC systems or controls). The value of at least one (1) project submitted in this category shall have a total award value of no less than $50,000.00. If submitting a general new construction or renovation project that included construction, repair or alteration of a mechanical system (e.g., HVAC systems or controls), offeror shall clearly specify the percentage and dollar value of the project attributed to mechanical systems. The value attributed to construction, repair or alteration of a mechanical system (e.g., HVAC systems or controls) shall be at least $50,000.00. The same project cannot be submitted for multiple types of experience.
d. At least one (1) of the submitted projects for renovation or repair of a facility. The value of at least one (1) project submitted in this category shall have an award value of no less than $100,000.00.
e. All submitted projects shall have been awarded to the offeror as the prime contractor. In the case of an offeror which is a Joint Venture (JV), the project shall have been awarded to one (1) of the members of the JV as the prime contractor. In the case of an offeror that is a prime contractor /subcontractor team, the project may have been completed by the subcontractor if a formal teaming agreement is provided.
f. All project information must be submitted using the format of or equivalent to Exhibit A -
PERFORMANCE RELEVANCY QUESTIONNAIRE.
3.1.3 Recency:
3.1.3.1 All submitted projects shall have been completed within five (5) calendar years before the closing date of this solicitation or, if active, shall have at least sixty percent (60%) construction progress completed before the closing date of this solicitation.
3.1.4. Relevancy:
3.1.4.1. Where a project was awarded as a task order under an IDIQ-type contract, offerors are cautioned to submit information specific to the project awarded by task order rather than the base IDIQ contract.
The Government will not permit multiple projects, such as individual task orders, to be combined to meet the minimum value of any of the four (4) project types indicated above. Projects with an award value below the values stated for each category will not be considered. Offerors shall provide sufficient detail to clearly demonstrate relevancy.
3.1.5. For recognized contractor teaming arrangements, offerors shall submit a minimum of one (1) relevant project for each member of the team; but offerors remain responsible to collectively submit the minimum of four (4) relevant projects. Offerors shall not exceed the maximum of five (5) projects.
Offerors shall indicate which team member was the prime contractor on each project. Offerors shall also describe their primary roles/duties in execution of the work (i.e., which major components of the project were completed by the prime's staff and which major components were subcontracted).
3.1.6. Offerors shall clearly demonstrate how their submitted projects are similar in size, scope and complexity, including any distinctive or unique features and any project-specific information that supports the project's relevance to the work required by this solicitation.
3.1.7. Where a project consisting of a base award and one (1) or more options is submitted by an offeror to meet the recency, relevancy or value criteria for Factor 1, the same base contract and options will be used to evaluate the remaining criteria for Factor 1 and Factor 2, Past Performance.
Factor 1 will be rated on an Acceptable/Unacceptable basis, as follows:
Rating Definition
Acceptable
Proposal meets the minimum requirements of the solicitation. The Offeror has submitted four (4) or more projects and has demonstrated experience with all specified criteria among the submitted projects.
Unacceptable
Proposal does not meet the minimum requirements of the solicitation. The Offeror did not submit at least four (4) projects, or the projects submitted did not demonstrate experience with all specified criteria.
3.2. Factor 2. Past Performance.
3.2.1. Offerors shall submit past performance information for each project submitted for Factor 1, Corporate Experience.
3.2.2. For each of the projects submitted for Factor 1, the offeror shall submit an interim or final performance evaluation from the Contractor Performance Assessment Reporting System (CPARS) - AND /OR - request a Past Performance Questionnaire (PPQ) (Exhibit B) from a client reference.
3.2.3. For any projects that did not/do not meet the original schedule or performance requirements, resulting in assessment of liquidated damages, offerors shall provide a brief explanation of the reason(s) for the shortcomings and any corrective actions taken to avoid recurrence.
3.2.4. Past Performance Questionnaire (PPQ). A blank PPQ and sample cover letter are provided as Exhibit B within this solicitation. Offerors shall send a PPQ and cover letter to the client for each project submitted for Factor 1, Corporate Experience, for which a CPARS report is not available. For purposes of this solicitation, the Government defines the "client" as the project owner for the submitted project.
The PPQ package should be sent to the Contracting Officer or the Contracting Officer's Representative (COR) for Government contracts, or to individuals in similar positions (such as Purchasing or Technical Representatives) for commercial contracts. Offerors shall complete all information in Blocks 1-4 of the PPQ form, to include a complete and accurate project description. The client shall complete Blocks 5-8 and the rating sheets. The project clients shall email the completed PPQ forms and rating sheets directly to the Government at and no later than five adam.d.sackman.civ@army.mil jodi.l.zolynski.civ@army.mil
(5) calendar days before the date proposals are due. Completed PPQs should NOT be returned to the offeror. Offerors are responsible for following up with clients to ensure they complete and submit the PPQs on time.
3.2.4.1. For each PPQ sent to a client reference, the offeror shall submit a copy of the PPQ form with Blocks 1-4 completed, along with the name, telephone number, and e-mail address of the client Point of Contact (POC), with their proposal. The Government may contact and interview the POCs and reserves the right to interview other representatives of the reference's firm if the listed POC is not available. The Government may contact references for submitted projects for purposes of assessing and verifying the scope of work performed.
3.2.5. The offeror may also provide performance recognition documents such as awards, letters of appreciation or award fee determinations received for any of the submitted projects within three (3) years from the closing date of this solicitation.
3.2.6. If offerors are submitting as a Joint Venture (JV) or recognized teaming arrangement, PPQ information must be provided for each team member for one (1) or more of the projects submitted (performed by the team member individually or as a member of the same team).
3.2.7. Regardless of the rating or evaluation terminology used in any single past performance information, the Government will determine the acceptability or non-acceptability of an offeror's past performance based on the totality of the information reviewed.
3.2.8. The Government will evaluate past performance information to assess the level of acceptability associated with the offeror's likelihood to successfully perform the requirements of the solicitation. The recency and relevancy of the information (as determined by the Government), the source of the information, context of the data, and general trends in the offeror's performance may be considered.
3.2.9. Offerors must demonstrate the following minimum standards for Past Performance:
a. Demonstrate work on previous projects has been of acceptable quality
b. Demonstrate timely completion of previous projects
c. Demonstrate acceptable cost control on previous projects (if applicable)
d. Overall ratings of Satisfactory or above on all past performance references
e. All past performance references indicate they would hire the offeror to perform work in the future
3.2.10. For any projects that did not/do not meet the original schedule or performance requirements, resulting in the assessment of liquidated damages, offerors shall provide a brief explanation of the reasons
(s) for the shortcomings and any corrective actions taken to avoid recurrence.
3.2.11. In general, projects that the Government did not consider relevant for purposes of evaluating corporate experience will not be considered relevant for the purposes of evaluating past performance.
3.2.12. The Government may consider the past performance of the offeror's business arrangements and relationships, such as Joint Venture participants, teaming partners, and key subcontractors, if the Government believes that such business arrangements may impact the offeror's performance of work under the contracts resulting from this solicitation.
3.2.13. In addition to past performance information submitted by the offeror, the Government may use personal knowledge or information obtained from other sources, such as CPARS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or any other sources available to the Government, in its evaluation of an offeror's past performance.
3.2.14. While the Government may elect to consider data from other sources, the burden lies with the offeror to provide current, accurate and complete past performance information as described in this solicitation.
3.2.15. The assessment of past performance is separate from the responsibility determination required under FAR Subpart 9.1.
Factor 2 will be rated on an Acceptable/Unacceptable basis, as follows:
Rating Definition
Proposal meets the minimum requirements of the solicitation. The Offeror submitted past performance ratings for each of the projects submitted for the Corporate Experience factor. All submitted projects meet the minimum standards described in the evaluation criteria. Based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
In the case of an offeror without a record of recent, relevant past performance (and for which there is also no recent, relevant past performance information for its predecessor companies or key subcontractors), or for whom information on past performance is not available or cannot be verified, the offeror will not be evaluated favorably or unfavorably on past performance (FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, "unknown" shall be considered "acceptable".
Unacceptable
Proposal does not meet the minimum requirements of the solicitation. The Offeror's past performance ratings did not receive an overall rating of satisfactory or above, or the projects did not meet the described minimum standards for past performance. Based on the offeror's performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
3.3. Factor 3: Single Project Bonding Capability.
3.3.1. The offeror shall submit a signed letter from a surety company confirming that the offeror is capable of bonding to at least $1,000,000.00 for a single construction project. The names and addresses of both the offeror and the surety company must be clear in the letter, and the contact information for a surety representative must also be provided.
3.3.2. The surety company shall be listed on the U.S. Department of the Treasury, Bureau of the Fiscal Service's "List of Certified Companies" found at https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html. The surety's name and address on the letter must be the same as shown on the "List of Certified Companies."
Factor 3 will be rated on an Acceptable/Unacceptable basis, as follows:
Rating Definition
Proposal meets the minimum requirements of the solicitation. The Offeror submitted a letter from a certified surety confirming that the Offeror is capable to bond to at least $1,000,000.00 for a single construction project.
Unacceptabl e
Proposal does not meet the minimum requirements of the solicitation. The Offeror did not submit a letter from a certified surety, or the letter submitted does not confirm that the Offeror is capable to bond to at least $1,000,000.00 for a single construction project.
3.4. AWARD and DEBRIEFINGS
3.4.1. AWARD. A written award or acceptance of offer emailed, or otherwise furnished to the successful offeror within the time for acceptance specified in the offer shall be deemed to result in a binding contract without further action by either party.
3.4.2. DEBRIEFINGS. Offerors excluded from the competition before award may submit a written request for a debriefing to the Contracting Officer in accordance with FAR 15.505. A detailed debriefing will not be available for those proposals not selected for review by the Source Selection Evaluation Board due to non-conformance.
3.4.3. After award, unsuccessful offerors may submit a written request for a debriefing to the Contracting Officer in accordance with FAR 15.506. The written request must be on company letterhead and may be emailed directly to the Contracting Officer.
| IDCode: J |
| Page: 1 |
| Pages: 9 |
| AmendNo: 0002 |
| EffDate: 18 AUG 2025 |
| ReqNo: |
| ProjNo: N/A |
| IssCode: W50S7L |
| AdmCode: |
| IssuedBy: W7NK USPFO ACTIVITY MTANG 120 |
KO FOR MTANG DO NOT DELETE, 2800 AIRPORT AVE B
GREAT FALLS, MT 59404-5570
UNITED STATES
ADAM SACKMAN, EMAIL: ADAM.D.SACKMAN.CIV@ARMY.MIL TELEPHONE: (406) 324-3407
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W50S7L25RA003 |
| SolDate: 04 AUG 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: SEE SCHEDULE |
| ContNameTitle: |
| CoNameTitle: ADAM SACKMAN |
| ContDate: |
| CODate: 18 AUG 2025 |
File details come from the government source that posted it. Updated .