This solicitation and addendum seek bids for a firm fixed-price construction contract to replace fire pumps, piping, controls, and perform other repairs at Building 321 of the 120th Airlift Wing in Great Falls, Montana. The project is set aside 100% for small businesses under NAICS 237110, with a size standard of $39.5 million. The estimated value is between $500,000 and $1,000,000. The solicitation was issued by the Department of the Army National Guard. According to the addendum, work includes replacing the roof, HVAC system, fire pumps, piping, controls, lighting, interior and exterior painting, generator maintenance, and site work/pavements. Bids are due by an unspecified date in 2021, and the government anticipates funds will be available by September 30, 2021, to award a contract for this work to the responsible bidder providing the most advantageous price.

View the file

Other files for this federal contract opportunity

Other files attached to B321 Fire Pumps, newest first.
File Type Posted
C4-Abstract - JKSE 182404 Repair Fire Pumps B321.pdf PDF
Amendment 0002.pdf PDF
Addendum 1 MANG-Building 321_E300.pdf PDF
Amendment 0001.pdf PDF
B8-Questions and Answers 12-2-2020.pdf PDF
B7-Site Visit Attendance.pdf PDF
A3-REVISED - B321 FULL SPECIFICATIONS.pdf PDF
A3- B321 full set - drawings.pdf PDF
W50S7L21B0001 Repair Fire Pumps.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UG

150 150

LOAD

BANK

PLUG

LOAD

BANK

PLUG

70A3P

ATS

EXISTING FEEDER SCHEDULE

M

800A

800A

400A 400A

70A 400A 400A 70A GEN225A 225A

G

H L

WIRE AND CONDUIT SIZE

400A

800A

70A

(4#500KCMIL+#1/0G)3-1/2"C

2[(4#500KCMIL+#1/0G)3-1/2"C"C]

(4#4+#6G)1-1/4"C

GEN (4#500KCMIL+#1/0G)3-1/2"C

225A (4#4/0+#4G)2-1/2"C

7 7

6 6

800A

400A

400A

9 8

800A

PAD-MOUNT

TRANSFORMER

DISTRIBUTION BOARD "NDB"

800A , 277/480V, 3PHASE, 4W

UTILITY COMPANY

EXISTING 150KVA

EXISTING 230kW, 277/480V

DIESEL GENERATOR

FIRE PUMP WITH

AUTOMATIC TRANSFER

SWITCH (ATS)

FIRE PUMP WITH

AUTOMATIC TRANSFER

SWITCH (ATS)

DISTRIBUTION BOARD "EDB"

800A , 277/480V, 3PHASE, 4W

A. ELECTRICAL ONE LINE DIAGRAM IS SHOWN FOR REFERENCE ONLY.

B. REFER TO ELECTRICAL DEMOLITION AND ELECTRICAL POWER

PLANS FOR ELECTRICAL REQUIREMENTS ASSOCIATED WITH

BUILDING EQUIPMENT.

C. FEEDER SIZES SHOWN ARE BASED ON EXISTING RECORD

DOCUMENTS, ELECTRICAL CONTRACTOR TO FIELD VERIFY ALL

FEEDER SIZES AND REPORT AN DISCREPANCIES TO THE ENGINEER

OF RECORD.

1. EXISTING 125HP FIRE PUMP CONTROLLER WITH INTEGRAL ATS

BEING REMOVED AND REPLACED WITH NEW 150HP SERVICE

ENTRANCE FIRE PUMP CONTROLLER. SEE POWER PLAN FOR

ADDITIONAL ELECTRICAL REQUIREMENTS AND INFORMATION.

2. EXISTING 70A3P AUTOMATIC TRANSFER SWITCH (ATS) SHALL BE

REMOVED AND REPLACED WITH A NEW 70A3P ATS. TO BE

COMPATIBLE WITH NEW GENERATOR CONTROLS. SEE POWER PLAN

FOR ADDITIONAL ELECTRICAL REQUIREMENTS AND INFORMATION.

3. EXISTING GENERATOR LOAD BANK PLUGS BEING REMOVED AND

REPLACED AT THE EXTERIOR OF THE BUILDING. PROVIDE NEW

FEEDERS FROM 'EDB' TO THE EXTERIOR LOCATIONS OF LOAD BANK

PLUGS. FIELD COORDINATE EXACT ROUTING AND LOCATION OF

PLUGS WITH OWNER PRIOR TO START OF WORK. SEE POWER PLAN

FOR ADDITIONAL ELECTRICAL REQUIREMENTS AND INFORMATION.

4. EXISTING GENERATOR TO BE SERVICED AND NEW CONTROLS

PROVIDED. SEE POWER PLAN FOR ADDITIONAL ELECTRICAL

REQUIREMENTS AND INFORMATION.

5. PROVIDE NEW NEMA 3R JUNCTION BOX AND TAP FIRE PUMP AND

'NDB' FEEDERS TO INCOMING SERVICE ENTRANCE FEEDERS PER

NEC. SIZE TO MEET THE NEC REQUIREMENTS. INSTALL JUNCTION

BOX ON EXTERIOR OF BUILDING BETWEEN ELECTRIC METER AND

GENERATOR INTAKE LOUVER.

6. TAP INCOMING ELECTRICAL FEEDERS IN NEW JUNCTION BOX PER

NEC FOR FIRE PUMP CONTROLLERS. CORE DRILL THROUGH

EXISTING WALL AND PROVIDE CAULKING/SEALS AS NECESSARY TO

MAINTAIN EXISTING EXTERIOR WALL INTEGRITY AND FIRE RATING.

7. INTERCEPT EXISTING FIRE PUMP FEEDER PRIOR TO ENTERING

'NDB' AND EXTEND TO EXTERIOR JUNCTION BOX TO TAP EXISTING

INCOMING ELECTRICAL FEEDER FOR POWER TO SERVICE

ENTRANCE RATED FIRE PUMP CONTROLLERS.

8. PROVIDE NEW FEEDER FROM "NDB" BUSBAR TO EXTERIOR

JUNCTION BOX AND TAP AT INCOMING ELECTRICAL SERVICE

FEEDER.

9. INTERCEPT ELECTRICAL FEEDER WITHIN 'NDB' PRIOR TO BUS BAR

AND EXTEND TO EXTERIOR JUNCTION BOX FOR FIRE PUMP FEEDER

TAP.

800A, 277/480V, 3PHASE, 4WIRE

ELECTRICAL ONE-LINE DIAGRAM

NO SCALE

400A 3P

GENERAL NOTES:

400A 3P

70A 3P

30A/3P 70A2P

480V-120/240V

400A 3P

400A 3P

70A 3P

225A 3P

225A 3P

150A 3P

SPARE

FLAG NOTES (THIS SHEET)

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

920 Front Street, Suite 104 Helena, MT 59601 tel: 406.438.1467

6/10/2019

C:\Revit Local Files\MANG-Building 321_Elec-R19_julie.heitman.rvt

/1

7/

:1 3:

P

M

E4.00

1823 - PN JKSE 182404

2019-06-10

ELECTRICAL ONE LINE

DIAGRAM

Author

Checker

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

TYPE B-3 100% SUBMITTAL

NO. DATE REVISION DESCRIPTION

1 12/17/2020 Addendum #1

Sheets
E4.00 - ELECTRICAL ONE LINE DIAGRAM

File details come from the government source that posted it. Updated .