This document provides details for a firm fixed-price construction contract solicitation for fire pump repairs at Building 321 of the 120th Airlift Wing in Great Falls, Montana. The solicitation seeks to replace the roof, HVAC system, fire pumps, piping control system, lighting and conduct interior and exterior painting, maintain the building generator, and provide site work and pavements. The project is set aside 100% for small businesses under NAICS code 237110 with a size standard of $39.5 million. The estimated value is between $500,000 and $1 million. Funds are not presently available but are expected to be allocated by September 30, 2021. The award will be made to the responsible bidder providing the most advantageous price. The soliciting agency is the Department of the Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C4-Abstract - JKSE 182404 Repair Fire Pumps B321.pdf | ||
| Amendment 0002.pdf | ||
| Addendum 1 MANG-Building 321_E400.pdf | ||
| Amendment 0001.pdf | ||
| B7-Site Visit Attendance.pdf | ||
| B8-Questions and Answers 12-2-2020.pdf | ||
| A3- B321 full set - drawings.pdf | ||
| W50S7L21B0001 Repair Fire Pumps.pdf | ||
| A3-REVISED - B321 FULL SPECIFICATIONS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
F
FACP
A A
B B
Pump and
Controls Room
Generator Room
T
L
H
EDB
NDB
GENERATOR
BATTERIES
230kW GENERATOR
DAY TANK
208208
BIM FILE PATH:
SHEET NO.:
TITLE:
copyright 2018 SMA, P.C.
REVISIONS:
KEYMAP:
HELENA
920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com
ARCHITECT SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY:
CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:
Pl ot
D at e:
BOZEMAN
109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com
920 Front Street, Suite 104 Helena, MT 59601 tel: 406.438.1467
6/10/2019
C:\Revit Local Files\MANG-Building 321_Elec-R19_julie.heitman.rvt
/1
7/
:3 1:
P
M
E3.00
1823 - PN JKSE 182404
2019-06-10
FIRST FLOOR POWER PLAN
JH
CEL
UPGRADE FIRE PUMPS B321
1823 - PN JKSE
182404
MONTANA AIR NATIONAL GUARD
GREAT FALLS AIR NATIONAL GUARD BASE
GREAT FALLS, MT
TYPE B-3 100% SUBMITTAL
1/4" = 1'-0"E3.00
1 FIRST FLOOR POWER PLAN
KEYNOTES - FLOOR PLAN
200 PROVIDE THE FOLLOWING SERVICES FOR THE GENERATOR. ALL WORK TO BE PERFORMED
BY A COMPANY CERTIFIED TO WORK ON CUMMINS GENERATORS, EXAMPLE: CUMMINS
SALES AND SERVICES MISSOULA, MT. 406-728-1300 :
1. CHECK AND REPLACE AS NECESSARY THE FRONT AND REAR CRANK SEAL.
2. REPLACE BELTS AND HOSES.
3. REPLACE IF THE ENGINE LUBE OIL AND ANTIFREEZE MIXTURE
4. REPLACE THE ENGINE START BATTERIES.
5.PROVIDE NEW GENERATOR CONTROLS, CUMMINS POWER COMMAND 1302. PROVIDE
ALL CONNECTIONS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM.
6. CHECK THE ENTIRE GENERATOR PACKAGE FOR RECOMMENDED MAINTENANCE OR
REPAIR ITEMS.
7. RUN THE ENGINE/GENERATOR AND CHECK FOR LEAKS
8. NFPA110 LOAD BANK TEST THE UNIT.
201 CHECK ENTIRE EXISTING DAY TANK FUEL SYSTEM AND REPLACE SHAFT SEALS AND
RECOMMEND MAINTENANCE AND REPAIR ITEMS.
202 PROVIDE NEW 480V/3PH, 70A 3P AUTOMATIC TRANSFER SWITCH FOR PANELBOARDS.
NEW ATS SHALL BE COMPATIBLE WITH NEW GENERATOR CONTROLS.
203 PROVIDE THERMAL OVERLOAD SWITCH AT NEW GAS UNIT AND CONNECT TO EXISTING
CIRCUIT SAVED DURING DEMOLITION.
204 PROVIDE NEW DUPLEX RECEPTACLE IN EXISTING BACK BOX AND CONNECT TO EXISTING
CIRCUIT SAVED DURING DEMOLITION.
205 CONNECT NEW FIRE PUMP CONTROLLER WITH INTEGRAL AUTOMATIC TRANSFER SWITCH
(ATS) TO EXISTING FEEDER SAVED DURING DEMOLITION. ELECTRICAL CONTRACTOR TO
PROVIDE ALL REQUIRED LINE VOLTAGE CONNECTIONS INCLUDING BUT NOT LIMITED TO
THE CONNECTION BETWEEN THE CONTROLLER AND THE FIRE PUMP. FIRE PUMP
CONTROLLER BEING PROVIDED WITH A WYE-DELTA STARTER, COORDINATE NUMBER OF
CONDUCTORS NECESSARY FOR THE CONNECTION BETWEEN THE FIRE PUMP CONTROLLER
AND THE FIRE PUMP WITH THE FIRE PUMP SYSTEM PROVIDER.
206 PROVIDE NEW 480V/3PH, 30A3P DISCONNECT SWITCH IN NEMA 3R ENCLOSURE WITH 5A
LPN-RK FUSES AND CONNECT NEW JOCKEY PUMP TO EXISTING FEEDER SAVED DURING
DEMOLITION. LOAD ADDED IS EQUAL TO LOAD REMOVED.
207 CONNECT NEW FIRE ALARM CONTROL PANEL TO EXISTING CIRCUIT SAVED DURING
DEMOLITION. PROVIDE SURGE PROTECTION DEVICE FOR CIRCUIT SERVING FIRE ALARM
CONTROL PANEL.
208 PROVIDE NEW LOAD BANK PLUGS PER MTANG STANDARD; MELTRIC DR250
39-28027-K14, 600V 3P+N+G. CONNECT NEW PLUGS TO EXISTING CIRCUIT BREAKERS
AND PROVIDE NEW FEEDER FROM BREAKER OUT TO LOAD BANK PLUG LOCATED AT THE
EXTERIOR OF THE BUILDING. COORDINATE EXACT LOCATION FOR PLUGS WITH OWNER
PRIOR TO ROUGH IN. MOUNT AT +3'-0" AFG TO BOTTOM OF LOAD BANK PLUG. SEE ONE
LINE DIAGRAM ON E4.00 FOR ADDITIONAL ELECTRICAL REQUIREMENTS AND
INFORMATION.
209 PROVIDE DUPLEX RECEPTACLE ON A DEDICATED CIRCUIT FOR ERV UNIT. LOCATE
RECEPTACLE WITHIN 36" OF UNIT. COORDINATE EXACT LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO ROUGH IN. CONNECT TO EXISTING SPARE 20A BREAKER AT
PANELBOARD L WITH (2#12+#12G)1/2"C.
SHEET NOTES - FLOOR PLAN
A. THE ELECTICAL CONTRACTOR SHALL COORDINATE ALL LINE VOLTAGE WIRING REQUIRED
FOR ALL THE FIRE PROTECTION RELATED WORK PRIOR TO THE START OF WORK.
B. ALL GENERATOR RELATED WORK TO BE COORDINATED WITH THE OWNER AND
SCHEDULED ACCORDINGLY PRIOR TO THE START OF ANY WORK.
C. COORDINATE ALL MECHANICAL WORK WITH MECHANICAL CONTRACTOR PRIOR TO THE