About this file

This document provides details for a firm fixed-price construction contract solicitation for fire pump replacement and building repairs at a Montana Air National Guard facility. The solicitation seeks to replace roofing, HVAC systems, fire pumps, control systems, lighting, conduct interior and exterior painting, maintain an on-site generator, and provide site work and paving. The project is set aside 100% for small businesses under NAICS code 237110 with a size standard of $39.5 million. The government estimates the contract value will be between $500,000 and $1,000,000. Award will be made to the responsible bidder offering the most advantageous price. Bids are due by midnight on 30 September 2021, provided funds are available by that date as currently anticipated.

View the file

Other files for this federal contract opportunity

Other files attached to B321 Fire Pumps, newest first.
File Type Posted
C4-Abstract - JKSE 182404 Repair Fire Pumps B321.pdf PDF
Addendum 1 MANG-Building 321_E300.pdf PDF
Addendum 1 MANG-Building 321_E400.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
B7-Site Visit Attendance.pdf PDF
B8-Questions and Answers 12-2-2020.pdf PDF
W50S7L21B0001 Repair Fire Pumps.pdf PDF
A3-REVISED - B321 FULL SPECIFICATIONS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OWNER:

MONTANA AIR NATIONAL GUARD

120TH AIRLIFT WING

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT 59404

ARCHITECTS:

SMA ARCHITECTS P.C.

920 FRONT STREET SUITE 101

HELENA, MT 59601

P: 406.442.4933

PETER RUDD

ENGINEERS:

MECHANICAL AND ELECTRICAL:

MKK (N0W IMEG) CONSULTING ENGINEERS, INC.

PO BOX 9643

HELENA, MT 59604

P: 406.545.6426

KEVIN POPE, P.E., LEED AP

PROJECT TEAM

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS TAKE PRECEDENCE.

2. DRAWINGS HAVE BEEN PREPARED ON AN ORIGINAL SHEET SIZE OF 24"X36" AND IN COLOR.

3. HORIZONTAL DIMENSIONS SHOWN INDICATE FACE OF (F.O.) CONCRETE, F.O. STUD, CENTERLINE OF COLUMN GRIDLINE, OR F.O.

FINISH (INTERIOR), U.N.O.; VERTICAL DIMENSIONS INDICATE TOP OF (T.O.) SLAB, T.O. SUBFLOOR, OR T.O. FRAMING, U.N.O.

4. INFORMATION REGARDING EXISTING SITE CONDITIONS USED TO PREPARE THESE DRAWINGS HAS BEEN PROVIDED BY OTHERS.

CONTRACTOR TO FIELD VERIFY EXISTING SITE CONDITIONS PRIOR TO COMMENCING CONSTRUCTION. PROVIDE WRITTEN NOTIFICATION TO THE CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE DRAWINGS.

THE CONTRACTING OFFICER WILL ISSUE A WRITTEN DIRECTIVE IF FURTHER CLARIFICATION IS REQUIRED. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, DATUM, LEVELS AND CONDITIONS PERTAINING TO THE WORK PRIOR TO COMMENCING CONSTRUCTION. PROVIDE WRITTEN NOTIFICATION TO THE CONTRACTING OFFICER OF ANY DISCREPANCIES WITH THE DOCUMENTS. THE CONTRACTING OFFICER WILL ISSUE A WRITTEN DIRECTIVE IF FURTHER CLARIFICATION IS REQUIRED.

SHEET NOTES

SECTION NUMBER N

VIEW CALLOUT NORTH ARROW

EXTERIOR ELEVATION CALLOUT

EXTERIOR WALL TYPE SYMBOL

BUILDING SECTION CALLOUT

WALL SECTION CALLOUT

INTERIOR ELEVATION CALLOUT

DETAIL VIEW CALLOUT

DOOR SYMBOL

WINDOW TYPE SYMBOL

INTERIOR WALL TYPE SYMBOL

KEYNOTE CALLOUT

LEVEL CALLOUT

SHEET NUMBER

DIRECTION OF CUT PROJECT NORTH

SECTION NUMBER

SHEET NUMBER

SECTION NUMBER

SHEET NUMBER

DIRECTION OF CUT

DETAIL NUMBER

SHEET NUMBER

SECTION NUMBER

SHEET NUMBER

DIRECTION OF CUT

VIEW NUMBER

SHEET NUMBER

DIRECTION OF VIEW

LEVEL TITLE

LEVEL ELEVATION

SHEET LEGEND

A3.00

A3.00

24 VIEW NAME

VIEW SCALEA1.00

A0.00 1

A1.00

LEVEL NAME

ELEVATION

100A

A

1A

EW-1A

A1.00

1. CONTRACTOR SHALL COORDINATE LOCATIONS OF ALL BELOW GRADE UTILITES PRIOR TO EXCAVATION AND CONSTRUCTION.

2. CONTRACTOR SHALL USE EXTREME CAUTION WHEN EXCAVATING NEAR UNDERGROUND FACILITIES.

3. ANY DAMAGE TO ABOVE OR BELOW GRADE UTILITIES AND/OR FACILITIES SHALL BE IMMEDIATELY REPORTED TO THE

CONTRACTING OFFICER. ALL DAMAGED UTITLIES AND/OR FACILITIES SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE.

4. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR CONSTRUCTION.

5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY ITEMS DAMAGED DURING CONSTRUCTION.

6. CONTRACTOR SHALL RESTORE ALL SURFACED AND LANDSCAPED AREAS ADJACENT TO THE PROJECT DAMAGED DURING

CONSTRUCTION TO EQUAL OR BETTER CONDITIONS DETERMINED BY CONTRACTING OFFICER.

CONSTRUCTION NOTES

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

PROJECT ADDRESS

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

C:\Users\peterr\Documents\1823 - MANG-Building 321-R19_peterrJNJMV.rvt

7/

/2

:4 8:

A

M

COV

PN JKSE 182404

10 JUNE 2019

COVER SHEET

PAR

TLM

UPGRADE FIRE PUMPS B321

PN JKSE 182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

Type B-3 FINAL SUBMITTAL

UPGRADE FIRE PUMPS B321

Type B-3 FINAL SUBMITTAL | 10 JUNE 2019

PN JKSE 182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

UPGRADE FIRE PUMPS B321 COVER SHEET

COV COVER SHEET

ARCHITECTURAL DRAWINGS

A1.20 Demolition Floor Plan and Roof Plan

A1.25 Demolition Elevations, Section, Details

A2.00 Floor Plan, Roof Plan

A3.00 Elevations, Section, Details

SHEET INDEX

N N

VICINITY MAP SITE MAP

MECHANICAL DRAWINGS

M0.00 Mechanical Cover Sheet

M1.00 First Floor Demo Plan

M2.00 First Floor Mechanical Plan

M3.00 Mechanical Details and Schedules

ELECTRICAL DRAWINGS

E0.00 Electrical Cover Sheet

E1.00 First Floor Electrical Demo Plan

E2.00 First Floor Lighting Plan

E3.00 First Floor Power Plan

E4.00 Electrical One Line Diagram

FIRE PROTECTION DRAWINGS

F050 FIRE PUMP DEMOLITION

F075 TEMPORARY INSTALLATION

F100 FIRE PUMP FLOOR PLAN

F200 FIRE PUMP SECTIONS

F250 FIRE PUMP DETAILS

F275 FIRE PUMP DETAILS

F300 SPRINKLER SYSTEM DESIGN CRITERIA

F400 FIRE ALARM SYSTEM LAYOUT

UBC UNIFORM BUILDING CODE

UG UNDERGROUND

UH UNIT HEATER

UR URINAL

UV UNIT VENTILATOR

V.B. VAPOR BARRIER

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITE TILE

VEN VENEER

VERT. VERTICAL

VEST VESTIBULE

VFY. VERIFY

VG VERTICAL GRAIN

VIN VINYL

VP VENEER PLASTIC

VT VINYL TILE

VWC VINYL WALL COVERING

W WEST/WOMEN'S

W/ WITH

W/D WASHER/DRYER

W/O WITHOUT

WB WOOD BASE

WC WATER CLOSET

WD. WOOD

WH WATER HEATER

WIND. WINDOW

WWF WELDED WIRE FABRIC

WWM WIRE MESH

STD. STANDARD

STL. STEEL

STOR STORAGE

STRUCT. STRUCTURAL

SUBFLR SUBFLOOR

SUSP SUSPENDED

SV SHEET VINYL

SY SQUARE YARD

T&G TONGUE AND GROOVE

T.B. TEST BORE

T.O. TOP OF

T.O. FTG TOP OF FOOTING

T.O. SL. TOP OF SLAB

T.O.B. TOP OF BEAM

T.O.C. TOP OF CONCRETE

T.O.P. TOP OF PLATE

T.O.S. TOP OF STEEL

T.O.W. TOP OF WALL

TB TOWEL BAR

TEL TELEPHONE

TEMP TEMPERATURE

TEMP. TEMPORARY

THERM. THERMOSTAT

THK THICK

THROUGH. THROUGHOUT

THRU THROUGH

TJI TRUSS JOIST INCORPORATED

TOT. TOTAL

TPO THERMOPLASTIC POLYOLEFIN

TS TUBE STEEL

TV TELEVISION

TYP. TYPICAL

U.L. UNDERWRITERS LABORATORIES

U.N.O. UNLESS NOTED OTHERWISE

U/ UNDER

RC ROOF/CEILING

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

RECOMM. RECOMMENDATION(S)

REF REFERENCE

REFR/REF REFRIGERATOR

REINF REINFORCING

REQ. REQUIRED/REQUIREMENT(S)

RES RESILIENT

REV REVERSED

RIG. RIGID

RM ROOM

RO ROUGH OPENING

RV ROOF VENT

S SOUTH

S.C. SOLID CORE

S.I.P. STRUCTURAL INSULATED PANEL

SACT SUSPENDED ACOUSTICAL CEILING TILE

SAT SUSPENDED ACOUSTICAL TILE CEILING

SCHED. SCHEDULE

SECT SECTION

SF SQUARE FEET

SHEATH./SHTHG SHEATHING

SHLVNG SHELVING

SHLVS SHELVES

SHT SHEET

SHWR SHOWER

SIM SIMILAR

SLNT SEALANT

SM SURFACE MOUNTED

SOG SLAB ON GRADE

SPEC. SPECIFICATION

SQ. SQUARE

SS STAINLESS STEEL

NA NOT APPLICABLE

NAT. NATURAL

NEC. NECESSARY

NO NUMBER

NOM. NOMINAL

NTS NOT TO SCALE

O.C. ON CENTER

O.H. OVERHANG

O/ OVER

OCC. OCCUPANTS

OD OUTSIDE DIAMETER

OH OVERHEAD

OPER. OPERABLE

OPNG OPENING

OPP OPPOSITE

PART. PARTITION

PART. BD. PARTICLE BOARD

PC PRECAST CONCRETE

PERIM. PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLAST PLASTIC

PLYWD. PLYWOOD

PNL PANEL

PRE-MAN. PRE-MANUFACTURED

PREFIN. PREFINISHED

PSL PARALLEL STRAND LUMBER

PT POINT

PVC POLYVINYL CHLORIDE PLASTIC POLYMER

PVMT PAVEMENT

QTY QUANTITY

R RISER

RA ROOF ASSEMBLY

RAD RADIUS

RB RUBBER BASE

IECC INTERNATION ENERGY CONSERVATION CODE

IN INCH

INCL INCLUDED

INFIL. INFILTRATION

INFO INFORMATION

INSUL. INSULATION

INT. INTERIOR

IWA INTERIOR WALL ASSEMBLY

JAN JANITOR

JST JOIST

LAV. LAVATORY

LF LINEAL FOOT

LOC. LOCATION

LSL LAMINATED STRAND LUMBER

LVL LAMINATED VENEER LUMBER

LVR LOUVER

LVT LUXURY VINYL TILE

M MEN'S

MACH. MACHINE

MAT. MATERIAL

MAX. MAXIMUM

MDF MEDIUM DENSITY FIBERBOARD

MECH. MECHANICAL

MEMB. MEMBRANE

MEZZ MEZZANINE

MFR. MANUFACTURER

MH MAN HOLE

MIN. MINIMUM or MINUTE

MIRR MIRROR

MISC. MISCELLANEOUS

MO MASONRY OPENING

MTL. METAL

MULL MULLION

N NORTH

N.I.C. NOT IN CONTRACT

FIN. FINISHED

FLR FLOOR

FLUOR FLUORESCENT

FND FOUNDATION

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOUND. FOUNDATION

FOW FACE OF WALL

FRP FIBERGLASS REINFORCED PANEL

FSD FIRE SEPARATION DISTANCE

FT FOOT OR FEET

FT. FOOT

FTG FOOTING

G.A. GYPSUM ASSOCIATION

G.C. GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GEN GENERAL

GEOTECH. GEOTECHNICAL

GI GALVANIZED IRON

GL GLASS

GLB GLULAM BEAM

GR. GROSS

GWB GYPSUM WALL BOARD

GYP GYPSUM

H.M. HOLLOW METAL

HB HOSE BIB

HC HANDICAPPED

HDR HEADER

HORIZ. HORIZONTAL

HR. HOUR

HSS HOLLOW STEEL SECTION

IBC INTERNATIONAL BUILDING CODE

IEBC INTERNATIONAL EXISTING BUILDING CODE

DL DEAD LOAD

DN DOWN

DR DOOR

DS DOWNSPOUT

DTL.(S) DETAIL OR DETAILS

DWG DRAWING

E EAST

E.J. EXPANSION JOINT

E.W. EXTERIOR WALL

EA. EACH

EIFS EXTERIOR INSULATION FINISH SYSTEM

ELEC. ELECTRICAL

ELEV. ELEVATION

ELEV. ELEVATOR

ENCL. ENCLOSURE

EO ELECTRICAL OUTLET

EP ELECTRICAL PANEL

EQ EQUAL

EQUIP. EQUIPMENT

EXH EXHAUST

EXP EXPANSION

EXT. EXTERIOR

EXTR. EXTRUDED

F.F. FLOOR FINISH

F.F.L. FINISHED FLOOR LEVEL

F.O. FACE OF

FA FLOOR ASSEMBLY

FABR FABRICATE

FC FLOOR-CEILING

FDC FIRE DEPARTMENT CONNECTION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFHB FROST FREE HOSE BIB

FG FINISH GRADE

FH FIRE HYDRANT

CG CORNER GUARD

CH CHANNEL

CI CUBIC INCHES

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLR CLEAR

CLR. CLEAR

CMNT CEMENT

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL(S). COLUMNS

COMP. COMPOSITE

CONC. CONCRETE

COND CONDITION

CONF CONFERENCE

CONN CONNECTION

CONST. CONSTRUCTION

CONT. CONTINUOUS

CONT./CONTR. CONTRACTOR

COORD. COORDINATE

CUH CABINET UNIT HEATER

CW COLD WATER

CY CUBIC YARD

DBL DOUBLE

DED. DEDUCTIVE

DEF. DEFINITION

DEMO. DEMOLISH

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DIST. DISTANCE

(E) EXISTING

(N) NEW

A.C.T. ACOUSTIC CEILING TILE

A.F.F. ABOVE FINISHED FLOOR

A.I.B. AIR INFILTRATION BARRIER

A/C AIR CONDITIONING

ACOUST ACOUSTICAL

ADD. ADDITIVE

ADJ ADJACENT

ALT. ALTERNATE

ALUM. ALUMINUM

ANOD. ANODIZED

APPROX. APPROXIMATE

ARCH. ARCHITECT

ARM ADMINISTRATIVE RULES OF MONTANA

ASSEMB. ASSEMBLY

AUTO AUTOMATIC

B.O. BOTTOM OF

B.O.W. BOTTOM OF WALL

BARR. BARRIER

BD BOARD

BITUM. BITUMINOUS

BLDG. BUILDING

BRG BEARING

BSBD BASEBOARD

BTWN BETWEEN

BYND. BEYOND

C.C. CENTER TO CENTER

C.L.L. CONTRACT LINE LIMIT

C.T. CERAMIC TILE

CAB CABINET

CAP CAPACITY

CDX EXTERIOR GRADE PLYWOOD

CENT. CENTERED

CF CUBIC FEET

PROJECT LOCATION

NO. DATE REVISION DESCRIPTION

UP

UP

UP

1. PRIOR TO BIDDING, THE CONTRACTOR SHALL VISIT THE FACILITY AND THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING

CONDITIONS.

2. SCHEDULE DEMOLITION WORK WITH THE OWNER TO MINIMIZE DISRUPTION OF SERVICES AND PROVIDE FOR THE

UNINTERRUPTED FUNCTIONING OF THE FACILITY.

3. THE CONTRACTOR SHALL PROVIDE ALL DEMOLITION INCIDENTAL TO OR REQUIRED FOR NEW AND RENOVATION CONSTRUCTION WHETHER OR NOT IT IS SPECIFICALLY NOTED, INCLUDING BUT NOT LIMITED TO, ALL OTHER WORK THAT MIGHT REASONABLY BE REQUIRED TO BE REMOVED IN PREPARATION FOR SPECIFIED FINISHES. DEMOLITION SHALL BE PERFORMED IN A MANNER THAT WILL NOT DAMAGE ANY SERVICES INDICATED TO REMAIN. SERVICES SHALL BE PATCHED IF NECESSARY TO PROVIDE A SUITABLE

SUB-STRATA FOR NEW FINISHES.

4. REMOVE ALL ITEMS SHOWN AS "DASHED".

5. THE CONTRACTOR SHALL CONSTRUCT DUST BARRIER PARTITIONS AS REQUIRED TO SEPARATE CONSTRUCTION AREAS FROM

OCCUPIED AREAS. EXIT PATHS SHALL BE MAINTAINED CLEAR OF EQUIPMENT, MATERIAL AND DEBRIS.

6. DEBRIS SHALL BE PROMPTLY REMOVED FROM THE BUILDING AND THE SITE AND DISPOSED OF IN A LEGAL MANNER. SURFACES

IN THE CONSTRUCTION AREA SHALL BE MAINTAINED IN A BROOM CLEAN CONDITION AT THE END OF EACH WORK DAY.

7. PORTIONS OF OCCUPIED AREAS WILL REMAIN IN OPERATION AT ALL TIMES. SECURITY MUST BE MAINTAINED AT ALL TIMES.

REVIEW SECURITY PROCEDURES WITH THE OWNER PRIOR TO THE START OF WORK.

8. THE CONTRACTOR SHALL MAINTAIN AND ADHERE TO ALL CURRENT LIFE-SAFETY AND INTERIM LIFE-SAFETY RULES AND

REGULATIONS THROUGHOUT THE CONSTRUCTION OF THIS PROJECT.

9. THE CONTRACTOR SHALL PATCH AND/OR REPAIR ANY AND ALL SURFACES DAMAGED OR REMOVED DURING DEMOLITION TO

MATCH EXISTING SURFACES UNLESS SURFACES ARE TO RECEIVE NEW FINISHES OR UNLESS NOTED OTHERWISE. REFER TO AND

COORDINATE WITH STRUCTURAL.

10. ALL BUILDING SERVICES, INCLUDING MECHANICAL, PLUMBING AND ELECTRICAL SHALL NOT BE DISRUPTED FOR ANY LENGTH OF TIME NO MATTER HOW MINIMAL, UNLESS COORDINATED AND APPROVED BY THE GENERAL CONTRACTOR AND THE OWNER.

11. CONTRACTOR SHALL INSPECT EXISTING CONDITIONS PRIOR TO WORK. PRIOR TO SUBSTANTIAL COMPLETION THE CONTRACTOR WILL REPAIR OR CLEAN DAMAGED OR DIRTY SURFACES ADJACENT TO PROJECT WORK AREAS (CAUSED BY CONSTRUCTION

ACTIVITIES) TO MATCH ORIGINAL CONDITION.

12. SEE MECHANICAL, FIRE PROTECTION, AND ELECTRICAL FOR DEMOLITION REQUIREMENTS FOR THOSE DISCIPLINES.

SHEET NOTES - DEMOLITION PLAN

A A

B B

A1.25

A1.25

A3.00

A3.00

A3.00

A3.001

43'-0"

'-0

12'-0"

A1.251

A1.25

A1.25

A1.25 4

Generator Room

Pump and

Controls Room

0A

100B 101A

12 10

A A

B B

A1.25

A1.25

A3.00

A3.00 3

A3.00

A3.001

43'-0"

'-0

A1.251

A1.25

A1.25

A1.25 4

A1.25

TYP.

A1.25

TYP.

A1.25

TYP.

A1.25

TYP.

A A

B B

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

C:\Users\peterr\Documents\1823 - MANG-Building 321-R19_peterrJNJMV.rvt

6/ 7/

:2

7:

P M

A1.20

1823 - PN JKSE 182404

10 JUNE 2019

Demolition Floor Plan and Roof Plan

PAR

PAR/TM

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

Type B-3 FINAL SUBMITTAL

N

KEYNOTES - DEMOLITION PLANS

1 Remove (E) door hardware at (E) HM doors and frames (to remain in place); prep for repainting and (N) door hardware as required.

2 Clean (E) concrete floor slab and prep for (N) floor coating system - coord. w/Mech. and Elect. for floor mounted equipment and housekeeping pad locations

3 (E) exhaust vent to remain - reuse - see Mechancial

4 (E) plumbing vent to remain

5 Remove (E) Exhaust unit - see mech.

6 Remove (E) single-ply roof membrane and rigid insulation down to (E) metal decking

7 Remove (E) prefinished metal gutters & downspouts

8 Remove (E) gravel landscaping as req. for (N) 4" conc. slab on grade

9 (E) Concrete sidewalk/slab to remain

10 (E) Asphalt paving to remain

11 (E) Steel pipe guard rail to remain - clean and prep for repainting

12 (E) Concrete stair and landing to remain

13 (E) rock landscaping area to remain

14 (E) Power transformer and concrete slab to remain - protect during course of construction

15 (E) Mechancial louver to remain - see mechanical

16 (E) Generator to remain - see electrical

17 (E) Generator controls, electrical panels, and supporting equipment to remain - see electrical

18 See Fire Protection and Electrical drawings for existing fire pumps, controls, panels, etc. to be removed and replaced throughout space

19 (E) Monitor head to remain - protect during course of construction

1/4" = 1'-0"A1.20

1 DEMOLITION FLOOR PLAN

1/4" = 1'-0"A1.20

2 DEMOLITION ROOF PLAN

N

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

AB

FINISH GRADE

96'-0"

101A

2 2 23 3

A1.25

TYP.

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

A1.25

A1.25

FINISH GRADE

96'-0"

2 2 23 34 5 6

A1.25

TYP.

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

1 2

A1.25

A1.25

FINISH GRADE

96'-0"

100A

2 22 3 35 46

A1.25

TYP.

321A12

17 17

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

A B

FINISH GRADE

96'-0"

222 335 4

A1.25

TYP.

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

A B

B.O. TRUSS

110'-2"

FINISH GRADE

96'-0"

224 SF

Generator Room

100B

22 33 5 4

A1.25

REMOVE (E) FULLY ADHERED SINGLE-PLY

ROOF MEMBRANE AND RIGID INSULATION

DOWN TO (E) MTL. DECKING

REMOVE (E) TERM BAR/SEALANT

REMOVE (E) MTL. GUTTERS

& DOWNSPOUTS

(E) TREATED 2X NAILER TO REMAIN

(E) MTL. ROOF

DECKING & OPEN

WEB STEEL TRUSSES

TO REMAIN

(E) EXTERIOR WALL

SYSTEM - MASONRY

VENEER, 2" RIGID INSUL., &

8" CMU BLOCK WALL - TO

REMAIN

REMOVE (E) FULLY ADHERED SINGLE-PLY

ROOF MEMBRANE AND RIGID INSULATION

DOWN TO (E) MTL. DECKING

REMOVE (E) TERM BAR/SEALANT

REMOVE (E) MTL. GUTTERS

& DOWNSPOUTS

(E) TREATED 2X NAILER TO REMAIN

(E) MTL. ROOF

DECKING TO REMAIN

(E) EXTERIOR WALL

SYSTEM - MASONRY

VENEER, 2" RIGID INSUL., &

8" CMU BLOCK WALL - TO

REMAIN

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

C:\Users\peterr\Documents\1823 - MANG-Building 321-R19_peterrJNJMV.rvt

6/ 7/

:2

7:

P M

A1.25

1823 - PN JKSE 182404

10 JUNE 2019

Demolition Elevations, Section, Details

PAR

PAR/TM

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

Type B-3 FINAL SUBMITTAL

1/4" = 1'-0"A1.25

1 DEMOLITION - EAST BUILDING ELEVATION

1/4" = 1'-0"A1.25

2 DEMOLITION - NORTH BUILDING ELEVATION

1/4" = 1'-0"A1.25

3 DEMOLITION - SOUTH BUILDING ELEVATION

1/4" = 1'-0"A1.25

4 DEMOLITION - WEST BUILDING ELEVATION

1/4" = 1'-0"A1.25

5 DEMOLITION - BUILDING SECTION

KEYNOTES - DEMOLITION ELEVATIONS & SECTION

1 Remove (E) door hardware

2 (E) exhaust vent to remain - see Mechanical

3 (E) plumbing vent to remain - see Mechancial

4 Remove (E) Exhaust unit - see mech.

5 Remove (E) prefinished metal gutters & downspouts

6 Remove (E) single-ply roof membrane and rigid insulation down to (E) metal decking

7 Remove (E) Exterior light fixture - see Elect.

8 (E) Fuel filler pipe to remain

9 Mech. Louver - see Mech.

10 (E) Conduit & Elect. box to remain

11 (E) Electrical utitity meter and conduit to remain

12 (E) Building signage to remain

13 (E) Water meter & conduit/piping to remain

14 Demo (E) masonry veneer as req. for (N) load bank testing plugs - coord. w/Elect.

15 (E) Steel pipe guard rail to remain - clean and prep for repainting

16 Remove (E) masonry veneer & wall construction as req. for (N) mech. louver - coord. w/Mech.

17 Demo (E) masonry veneer as req. for (N) fire protection piping - coord w/Fire Protection

3" = 1'-0"A1.25

6 Typ. Roof Edge Eave Demo Detail 3" = 1'-0"A1.25

7 Typ. Roof Edge Rake Demolition Detail

UP

UP

UP

UP

1. DIMENSIONS ARE TYPICALLY TAKEN TO GRID, FACE OF MASONRY, FACE OF CONCRETE, FACE

OF STUD OR DOOR/WINDOW OPENINGS. DIMENSIONS TO OPENINGS ARE NOMINAL, VERIFY

ALL OPENINGS WITH ROUGH OPENING REQUIREMENTS.

2. MASONRY IS DIMENSIONED NOMINALLY TO THE FACE. ACTUAL DIMENSIONS WILL BE +1/2"

FOR INSIDE DIMENSIONS AND MASONRY OPENINGS, AND -1/2" FOR OUTSIDE DIMENSIONS.

3. EXISTING CONSTRUCTION TO REMAIN SHOWN HALF-TONE, TYP.

4. SEE SHEET A1.00 FOR WALL TYPE DESIGNATIONS.SEE SHEET A1.00 FOR WALL TYPE

DESIGNATIONS.

SHEET NOTES - FLOOR PLAN

SEE WALL TYPES, SHEET A01.0 FOR MORE

INFORMATION ON ALL WALL TYPES.

WALL LEGEND - PLANS

FIRE PROTECTION NOTES:

-SEE CODE PLANS FOR FIRE- AND SMOKE-BARRIER

LOCATIONS.

EXTEND WALLS FULL HEIGHT TO

UNDERSIDE OF ROOF ASSEMBLY

DECKING ABOVE - SEE DETAILS

INCLUDE SOUND BATTS TO T.O.

WALL OR B.O. DECK IN INTERIOR

WALLS INDICATED W/ CROSS-

HATCH.

EXTEND WALLS TO UNDERSIDE

OF RATED ROOF-CEILING

ASSEMBLY (GWB) - SEE DETAILS

EXTEND WALLS TO UNDERSIDE

OF RATED ROOF-CEILING

ASSEMBLY (GWB) - SEE

DETAILS - INCLUDE SOUND

BATTS TO B.O. ASSEMBLY

A A

B B

A3.00

A3.00 3

A3.00

A3.001

43'-0"

'-0

100B 101A

0A

224 SF

Generator Room

523 SF

Pump and

Controls Room

A3.00

A3.00

3' -6

9'-6"

COORD. W/STAIR MFR.

16'-9"

12 14

18 16

21 21

A A

B B

A3.00

A3.001

43'-0"

'-0

A1.251

A1.25

A1.25

A3.00

A3.00

4'-0"

4' -0

16'-3"

12'-0"

FLOOR

HPC HIGH PERFORMANCE FLOOR COATING

ROOM FINISH KEY

DOORS & FRAMES

WALL

P1 PAINT COLOR #1

CEILING

P4 PAINT COLOR #1

WATER PIPING

P2 PAINT COLOR #2

P3 PAINT COLOR #3

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

C:\Users\peterr\Documents\1823 - MANG-Building 321-R19_peterrJNJMV.rvt

6/ 7/

:2

7:

P M

A2.00

1823 - PN JKSE 182404

10 JUNE 2019

Floor Plan, Roof Plan

PAR

PAR/TM

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

Type B-3 FINAL SUBMITTAL

N

DOOR SCHEDULE

DOOR # WIDTH X HEIGHT DOOR TYPE FRAME TYPE FIRE RATING HARDWARE HEAD DETAIL JAMB DETAIL THRESHOLD DETAIL COMMENTS

FIRST FLOOR

100A 3'-0"X7'-0" (E) HM (E) HM - 01 Repaint (E) door and frame; install (N) door hardware

100B 3'-0"X7'-0" (E) HM (E) HM - 02 Repaint (E) door and frame; install (N) door hardware

101A 6'-0"X7'-0" (E) HM (E) HM - 03 Repaint (E) door and frame; install (N) door hardware

KEYNOTES - FLOOR& ROOF PLAN

1 Install (N) non-slip high perforamance floor coating throughout

2 Repaint all exposed wall and ceiling surfaces

3 Paint all exposed (N) and (E) mechancial, electrical, fire protection, and pump equipment

4 (N) single ply roof membrane system over (E) mtl. decking - see RC Type - paint top surface of mtl. decking before installation of (N) roof system

5 (N) galv. mtl. decking panel to match (E) - min. 12" larger ea. way - anchor to (E) decking w/sheet metal screws @ 6" o.c. at perimeter cont.

6 (N) mech. vent - see mech.

7 (N) Plumbing vent - see mech.

8 (N) Snow guards - install at locations/sizes shown per mfr.

9 (N) Prefin. mtl. gutter system cont. at entire perimeter of roof

10 (N) 4" conc. slab on grade w/thickened edge

11 (N) Prefabricated galvanized steel stair, landing, and handrail assembly for fuel filler - coordinate location and dimensions with filler location

12 (E) Concrete sidewalk/slab to remain

13 (E) Power transformer and concrete slab to remain - protect during course of construction

14 (E) rock landscaping area to remain

15 (E) Monitor head to remain - protect during course of construction

16 (E) Asphalt paving to remain

17 (E) Steel pipe guard rail to remain - clean and prep for repainting

18 (E) Concrete stair and landing to remain

19 (E) Mechancial louver to remain - see mechanical

20 (E) Generator controls, electrical panels, and supporting equipment to remain - see electrical

21 (N) fire pump equipment and controllers - see fire protection drawings - paint all (N) water piping paint color P2 per specifications

1/4" = 1'-0"A2.00

1 FIRST FLOOR PLAN

1/4" = 1'-0"A2.00

2 ROOF PLAN

N

ROOM FINISH SCHEDULE

ROOM

NUMBER ROOM NAME

FLOOR BASE NORTH WALL EAST WALL SOUTH WALL WEST WALL CODED

NOTES CEILINGMAT FIN CLR FIN CLR MAT FIN CLR MAT FIN CLR MAT FIN CLR MAT FIN CLR

100 Generator Room CONCRETE HPC - - - CMU P1 - CMU P1 - CMU P1 - CMU P1 - P1

101 Pump and Controls Room CONCRETE HPC - - - CMU P1 - CMU P1 - CMU P1 - CMU P1 - P1

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

AB

FINISH GRADE

96'-0"

A3.00

TYP.

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

FINISH GRADE

96'-0"

A3.00

A3.006

A3.00

TYP.

FI

EL

D V

ER

IF

Y

AL

L D

IM

EN

S

IO

N S

9' -1

/8

T.

O

. F

IL

LE

R

3' -9

/8

LA

N

D

IN

G H

EI

G

H T

5' -0

7 9

10 RISERS @ 6"

G U

A R

D R

A

IL

3' -6

H A

N D

R A

IL

3' -0

PLATFORM

4'-0" X 4'-0"

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

A B

FINISH GRADE

96'-0"

A3.00

TYP.

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

1 2

FINISH GRADE

96'-0"

A3.00

A3.00 6

A3.00

TYP.

321A

FIRST FLOOR

100'-0"

T.O. WALL

110'-8"

A B

B.O. TRUSS

110'-2"

FINISH GRADE

96'-0"

A3.00

224 SF

Generator Room

(E) TREATED 2X NAILER TO REMAIN

(E) MTL. ROOF DECKING & OPEN WEB STEEL

TRUSSES TO REMAIN - PAINT EXPOSED TOP

SURFACE OF DECKING BEFORE

INSTALLATION OF ROOF SYSTEM

(E) EXTERIOR WALL

SYSTEM - MASONRY

VENEER, 2" RIGID INSUL., &

8" CMU BLOCK WALL - TO

REMAIN

(N) PREFIN. MTL. GUTTER

WOOD NAILERS AS REQ. PER MEMB. MFR.

SEALANT PER MEMB. MFR.

TERM BAR, FASTENERS, & SEALANT

TAPE PER MEMB. MFR.

WRAP MEMB. DOWN FACE

W/ADHESIVE PER MFR.

MEMB. FLASHING STRIP W/HEAT-WELDED

LAP & SEALANT PER MEMB. MFR.

RC-1

(E) TREATED 2X NAILER TO REMAIN

(E) MTL. ROOF DECKING & OPEN WEB STEEL

TRUSSES TO REMAIN - PAINT EXPOSED TOP

SURFACE OF DECKING BEFORE INSTALLATION OF

ROOF SYSTEM

(E) EXTERIOR WALL

SYSTEM - MASONRY

VENEER, 2" RIGID INSUL., &

8" CMU BLOCK WALL - TO

REMAIN

(N) PREFIN. MTL. GUTTER

WOOD NAILERS AS REQ. PER MEMB. MFR.

SEALANT PER MEMB. MFR.

TERM BAR, FASTENERS, & SEALANT

TAPE PER MEMB. MFR.

WRAP MEMB. DOWN FACE

W/ADHESIVE PER MFR.

MEMB. FLASHING STRIP W/HEAT-WELDED LAP

& SEALANT PER MEMB. MFR.

RC-1

TPO SINGLE-PLY ROOF MEMBRANE -

FULLY ADHERED PER MFR.

1/2" GLASS-FIBER

COVER BOARD

R-30 RIGID INSUL.

AS REQ.

(E) MTL. DECKING TO REMAIN -

PAINT EXPOSED TOP SURFACE OF

DECKING PRIOR TO INSTALLATION OF

(N) ROOF SYSTEM.

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

C:\Users\peterr\Documents\1823 - MANG-Building 321-R19_peterrJNJMV.rvt

6/ 7/

:2

7:

P M

A3.00

1823 - PN JKSE 182404

10 JUNE 2019

Elevations, Section, Details

PAR

PAR/TM

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

Type B-3 FINAL SUBMITTAL

KEYNOTES - EXTERIOR ELEVATIONS

1 (N) Prefabricated galvanized steel stair, landing, and handrail assembly for fuel filler - guard rail @ 42", handrials at 36" - coordinate location and dimensions with filler location

2 (N) Exterior light fixture - see elect.

3 (N) Prefin. mtl. gutter system cont. at entire perimeter of roof

4 Repaint (E) steel pipe rails

5 (N) fire protection piping - see Fire Protection drawings

6 (N) 4" conc. slab on grade w/thickened edge

7 (N) prefin. mtl. louver - see mech.

8 Patch & repair (E) masonry veneer as req. to match (E) adjacent at location of removed fire protection connection - sawtooth opening to accept full bricks - verify

9 (N) fuel filler location - coord. w/mechanical

1/4" = 1'-0"A3.00

1 EAST BUILDING ELEVATION

1/4" = 1'-0"A3.00

2 NORTH BUILDING ELEVATION

1/4" = 1'-0"A3.00

3 WEST BUILDING ELEVATION

1/4" = 1'-0"A3.00

4 SOUTH BUILDING ELEVATION

1/4" = 1'-0"A3.00

5 BUILDING SECTION

3" = 1'-0"A3.00

6 New Roof Edge Eave Detail 3" = 1'-0"A3.00

7 New Roof Edge Rake Detail

3" = 1'-0"A3.00

8 Roof-Ceiling Type RC-1 (New)

MECHANICAL/ELECTRICAL EQUIPMENT SCHEDULE

CONTROLS (NOTE B. BELOW) REFERENCES THE "CONTROLS" COLUMN OF THE EQUIPMENT SCHEDULES.

NOTES:

A. SEE SPECIFICATIONS DIVISION 26 "ELECTRICAL EQUIPMENT AND WIRING FOR MECHANICAL DIVISION"

FOR FURTHER INFORMATION.

B. CONTROLS: (1) FROM LIGHT SWITCH (2) SEPARATE WALL SWITCH (3) SWITCH WITH PILOT LIGHT (4)

RUNS CONTINUOUSLY (5) INTERLOCK TO RUN WITH OTHER EQUIPMENT (6) CONTROLLED BY DIVISION

23 (7) CYCLE FROM REMOTE THERMOSTAT (8) INTERGRAL TO UNIT (9) FIRE ALARM (10) OTHER; SEE

REMARKS * CARRIES FULL CURRENT. WIRING DONE BY DIVISION 26 FOR CONTROL. SEE

SPECIFICATIONS. ALSO SEE "TEMPERATURE CONTROL" SPECIFICATIONS.

C. MAGNETIC STARTERS TO HAVE MAINTAINED CONTACT UNLESS NOTED. ALL STARTERS BY

MECHANICAL UNLESS NOTED TO BE BY ELECTRICAL.

D. MOTORS 1/2 HP AND LESS TO BE 1750 RPM, 115/60/1, MOTORS 3/4 HP AND ABOVE TO BE AS NOTED IN

SCHEDULES.

E. THREE PHASE STARTERS ON MOTORS 5 HP OR GREATER TO HAVE PHASE MONITOR CONTROL RELAY, SEE SPECIFICATION.

M

T

REF

T

F

D

C

NG # PSIG

SIZE

A

CFM

TYPE

SIZE

CFM

MECHANICAL LEGEND

ABBREVIATIONS

CONTROLS LEGEND

PROJECT INFORMATION

GENERAL NOTES:

Mechanical, Electrical & Energy Consultants

Denver 7600 East Orchard Rd Suite 250-S Greenwood Village, CO 80111-2539 303.796.6000

Billings 175 North 27th Street, Suite

1312 Billings, MT 59101-2048 406.545.6420

Cheyenne 500 West 18th Street, Suite 200 Cheyenne, WY 82001-4368 307.459.6100

Salt Lake City 4760 S. Highland Drive, Suite

Salt Lake City, UT 84115

801.360.7024 Helena 920 Front Street, Suite 104 Helena, MT 59601 406.545.6421

Bogota, Colombia Calle 40B # 8-68 Edificio Torre San Marcos, 501

Bogota D.C. 110231 Colombia +57.1.485.0689

920 Front Street, Suite 104 Helena, MT 59601

406.545.6421 www.mkkeng.com

2-WAY VALVES

2 POSITION 3-WAY &

2-WAY VALVES

MODULATING 3-WAY &

LOW TEMPERATURE

DUCT SMOKE DETECTOR

DAMPER ACTUATOR

CONTROL

END SWITCH

EMERGENCY PULL SWITCH

REFRIGERANT DETECTOR

FLOW SWITCH

DETECTION THERMOSTAT

EMER

ES

FS

SWITCHS

DA

GAUGE

LT

2P

M

2P

M

OUTPUT SYMBOL

BINARY INPUT OR

XXX

XXX

OUTPUT SYMBOL

ANALOG INPUT OR

CURRENT SENSOR

DIFFERENTIAL PRESSURE

XXX

XXX

DP

CT

HI LOW

SENSOR

MAIN AIR

CONTROL AIR PIPING

CONTROL WIRING

BUTTERFLY

BUTTERFLY

2-WAY

VALVE

BFV

VALVE

3-WAY

STARTER

MOTOR

BFV

COIL

FILTER

FAN

M

PUMP

FLOW

SENSOR/CONTROLLER

DUCT AVERAGING TEMPERATURE

ROOM THERMOSTAT/TEMP SENSOR

WATER TEMPERATURE SENSOR

SENSOR/CONTROLLED

WATER DIFFERENTIAL PRESSURE

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

SNOW/ICE SENSOR

HUMIDISTAT/HUMIDITY SENSOR

BUILDING STATIC

PRESSURE SENSOR

PRESSURE SENSOR

DUCT STATIC

BSD

T

HI

LO

WITH WELL

LO

DSP

PS

LU

HI

HI

LO

T

T

SENSOR

H

REMOTE BULB

DAMPER

(SYMBOLS LOCATED IN BUILDING AUTOMATION SYSTEM SCHEMATICS)

PROJECT LOCATION: GREAT FALLS, MONTANA

PROJECT ALTITUDE: 3658 FEET ABOVE SEA LEVEL

SUMMER DESIGN TEMPERATURE: 92.1°F DRY BULB, 61°F WET BULB (ASHRAE 0.4% DESIGN)

WINTER DESIGN TEMPERATURE: -17.75°F DRY BULB, 0%RH (ASHRAE 99.6%)

1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE ENTIRE PROJECT

CONSTRUCTION DOCUMENT PACKAGE, PRIOR TO BID, AND BECOME FAMILIAR WITH THE

EXTENT OF THE WORK AND COORDINATION REQUIRED. NO EXTRAS WILL BE ALLOWED

FOR ALTERATIONS OF A FORESEEABLE NATURE REQUIRED TO ACHIEVE THE END RESULT

AS INDICATED BY CONTRACT DOCUMENTS.

2. CONTRACTOR IS TO PROVIDE COMPLETE CONNECTIONS TO ALL EQUIPMENT.

3. ALL CUTTING, PATCHING AND CORE DRILLING FOR THE INSTALLATION OF NEW

EQUIPMENT, DUCTS, HANGERS, ETC. SHALL BE HELD TO A MINIMUM AND BE

ACCOMPLISHED IN A CAREFUL MANNER.

4. CONTRACTOR TO COORDINATE THE LOCATION OF ALL DUCTWORK, CEILING DEVICES,

GRILLES, REGISTERS AND DIFFUSERS WITH REFLECTED CEILING PLAN AND STRUCTURE

PRIOR TO BEGINNING WORK.

5. DUCT DIMENSIONS GIVEN ARE OUTSIDE SHEET METAL DIMENSIONS.

6. MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY INDICATE

EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR

DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED

EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY

WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND

INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE

OWNER.

7. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY

PRECAUTIONS OR TO MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR

PROCEDURES REQUIRED TO PERFORM HIS WORK.

8. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE STATE CODES,

LOCAL CODES AND OWNER'S STANDARDS INDICATED BY THE CONSTRUCTION

DOCUMENTS.

9. ALL EXTERIOR WALL AND ROOF PENETRATIONS SHALL BE SEALED WATERPROOF.

10. ALL MECHANICAL WORK UNDER THIS CONTRACT IS TO FIVE (5) FEET OUTSIDE THE

BUILDING.

11. XX-## REFERS TO EQUIPMENT DESIGNATION. SEE SPECIFICATIONS AND EQUIPMENT

SCHEDULES FOR FURTHER INFORMATION IN REFERENCE TO THAT DESIGNATED PIECE OF

EQUIPMENT.

12. FLAG NOTES SHOWN ON DRAWINGS ARE BASED ON AN ABSOLUTE NUMBERING SYSTEM

AND ARE NOT NECESSARILY NUMBERED SEQUENTIALLY.

CONTROLS (IN PLAN)

CONTROL DAMPER

THERMOSTAT/TEMP SENSOR

HVAC DUCTWORK

24/12

SUPPLY AIR DUCT DOWN

OA, RA OR EXH DUCT DOWN

OPPOSED BLADE DAMPER ( O.B.D. )

TURNING VANES SHOWN IN 90° ELBOW.

PLUMBING

D - DOUBLE WALL CONSTRUCTION

UL - UNLINED DUCTWORK

V - OVAL DUCTWORK

DUCT SIZES ARE OUTSIDE SHEET METAL DIMENSIONS. 1st NO. IS SIZE OF SURFACE SHOWN. 2nd NO. IS DUCT DEPTH.

LETTERS AFTER DIM. CORRESPOND TO FOLLOWING:

ø - ROUND DUCTWORK

SUPPLY DIFFUSER. ALL DIFFUSERS FOUR-WAY THROW

UNLESS NOTED OR THROWS SHOW IN PLAN. SEE

SCHEDULE FOR TYPE.

RETURN/TRANSFER/EXHAUST AIR TAG. SEE SCHEDULE

FOR TYPE.

SECTION THRU OUTSIDE AIR INTAKE OR

SUPPLY AIR DUCT

SECTION THRU RETURN AIR OR

EXHAUST DUCT

W/SETPOINT ADJUSTMENT

W/TEMP INDICATION

W/TEMP AND ADJUSTMENT

W/STAINLESS STEEL COVER

SUBSCRIPTS:

W/LOCKING GUARD

S -

A -

I -

AI -

G -

VARIABLE FREQUENCY DRIVEVFD

AIR FLOW MEASURING

F L O

W

STATION

NITROGEN DIOXIDE SENSOR

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ALT ALTITUDE

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

C COMMON PORT

CFM CUBIC FEET PER MINUTE

SCFM CFM, STANDARD CONDITIONS

CU FT CUBIC FEET

CU IN CUBIC INCH

Cv COEFFICIENT, VALVE FLOW dB DECIBEL

DB DRY BULB

DCW DOMESTIC COLD WATER

DEG OR ° DEGREE

DHW DOMESTIC HOT WATER

DIA DIAMETER

DN DOWN

(E) EXISTING

EAT ENTERING AIR TEMP.

EFF EFFICIENCY

ELEV ELEVATION

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMP.

EXH EXHAUST

F FAHRENHEIT

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FOOT, FEET, FEET WATER COLUMN

FU FIXTURE UNITS

GA GAUGE

GAL GALLONS

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HD HEAD

HG MERCURY

HGT HEIGHT

HORZ HORIZONTAL

HP HORSEPOWER

HR HOUR(S)

HWC HOT WATER CIRCULATING (DOMESTIC)

HZ HERTZ

ID INSIDE DIAMETER

IE INVERT ELEVATION

IJS IN JOIST SPACE

IN INCHES

IN W.C. INCHES IN INCHES WATER COLUMN

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS OR # POUNDS

LF LINEAR FEET

LRA LOCKED ROTOR AMPS

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH BTU PER HOUR (THOUSAND)

MCA MINIMUM CIRCUIT AMPS

MIN MINIMUM

N/A NOT APPLICABLE

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

NC NOISE CRITERIA

NIC NOT IN CONTRACT

NO OR # NUMBER

NTS NOT TO SCALE

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

% PERCENT

PH OR ∅ PHASE (ELECTRICAL)

PPM PARTS PER MILLION

PRESS PRESSURE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA PSI ABSOLUTE

PSIG PSI GAUGE

RA RETURN AIR

RECIRC RECIRCULATE

RH RELATIVE HUMIDITY

RLA RUNNING LOAD AMPS

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SENS SENSIBLE

SL SEA LEVEL

SP STATIC PRESSURE

SPEC SPECIFICATION

SQ SQUARE

STD STANDARD

TD TEMPERATURE DIFFERENCE

TEMP TEMPERATURE

THRU THROUGH

TJO THROUGH JOIST OPENINGS

TONS TONS OF REFRIGERATION

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TYP TYPICAL

V VOLT

VAV VARIABLE AIR VOLUME

VEL VELOCITY

VERT VERTICAL

VOL VOLUME

W WATT

WB WET-BULB

WPD WATER PRESSURE DROP

WT WEIGHT

CO

CO2

NO2

ICE

FLOW METERFLOW

EMERGENCY POWER OFF SWITCHEPO

INDOOR AIR QUALITY SENSORIAQ

PRESSURE SWITCHPS

NATURAL GAS, PRESSURE AS IDENTIFIED

(FOR ALL FIRE PROTECTION, PLUMBING AND MECHANICAL DRAWINGS)

AOM

TN AN

E E

N

No. 13799PE

KEVIN G. POPE

SC

L I E N

DE

S S

R O

F E

P

LI O AN

NG

E

I

R

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

920 Front Street, Suite 104 Helena, MT 59601 tel: 406.438.1467

06/10/2019

BIM 360://2018.03.0036 MTANG Building 321/MANG-Building 321_Mech-Plumb-R19.rvt

6/ 5/

:1

3:

P M

M0.00

1823 - PN JKSE 182404

2019-06-10

MECHANICAL COVER SHEET

CMD

KGP

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

TYPE B-3 100% SUBMITTAL

A A

B B

A A

B B

A A

B B

"x

S L

SL

55"x102"

AOM

TN AN

E E

N

No. 13799PE

KEVIN G. POPE

SC

L I E N

DE

S S

R O

F E

P

LI O AN

NG

E

I

R

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

920 Front Street, Suite 104 Helena, MT 59601 tel: 406.438.1467

06/10/2019

BIM 360://2018.03.0036 MTANG Building 321/MANG-Building 321_Mech-Plumb-R19.rvt

6/ 5/

:1

3:

P M

M1.00

1823 - PN JKSE 182404

2019-06-10

FIRST FLOOR DEMO PLAN

CMD

KGP

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

TYPE B-3 100% SUBMITTAL

1/4" = 1'-0"M1.00

1 MECHANICAL DEMOLITION PLAN

KEYNOTES - FLOOR PLAN

001 EXISTING UNIT HEATER TO BE REMOVED ALONG WITH ALL ASSOCIATED CONTROLS. EXISTING

PIPING TO BE REUSED EXCEPT FOR NEW EQUIPMENT CONNECTIONS AS REQUIRED.

002 EXISTING SUMP PUMP TO BE REMOVED AS REQUIRED. EXISTING DISCHARGE PIPING AND

CONTROLS TO REMAIN AND BE REUSED.

003 EXISTING CONTROL PANEL TO BE REMOVED AND REPLACED AS REQUIRED.

004 EXISTING RELIEF AIR HOOD TO BE REMOVED. COORDINATE WITH G.C. FOR ROOF PATCHING.

005 REPLACE LOUVER DAMPERS AND ACTUATORS AS REQUIRED.

006 EXISTING LOUVER TO REMAIN AND BE REUSED.

007 EXISTING INTAKE FILTERS TO BE REPLACED PRIOR TO PROJECT COMPLETION.

008 EXISTING HIGH INTERIOR TC DAMPER AND ACTUATOR TO BE REMOVED.

SHEET NOTES (MECHANICAL DEMO)

A. DRAWINGS ARE BASED ON BEST AVAILABLE INFORMATION. THESE PLANS DO NOT REPRESENT A

FINAL AS-BUILT CONDITION OF THE EXISTING SYSTEM. CONTRACTORS SHALL REPORT ANY

MAJOR DISCREPANCIES TO THE DESIGN TEAM FOR FIELD CORRDINATION.

B. THE CONTRACTOR SHALL BE COGNIZANT THAT THIS IS A REMODEL PROJECT AND AS SUCH,

CERTAIN ITEMS CANNOT BE FULLY ILLUSTRATED NOR EXPLAINED WITHOUT FIELD OBSERVATION.

THEREFORE, BEFORE SUBMITTING A PROPOSAL, THE CONTRACTOR SHALL VISIT AND EXAMINE

THE PROJECT IN EVERY DETAIL AS PERTAINS TO THIS PROJECT AND MAKE ALLOWANCES IN THEIR

PROPOSAL FOR ALL CONDITIONS THAT WILL AFFECT THE WORK INDICATED IN THE PROJECT

MANUAL AND CONTRACT DOCUMENTS.

C. IT IS ABSOLUTELY NECESSARY THAT ALL TRADES COORDINATE WITH EACH OTHER AND VERIFY

THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, SPRINKLER HEADS,

DIFFUSERS, ELECTRICAL BOXES, EQUIPMENT, AND OTHER ITEMS THROUGHOUT THIS PROJECT

BEFORE FINAL PLACEMENT OF MATERIALS.

T

A A

B B

Generator Room

Pump and

Controls Room

ERV-1

SL-2

SL-1

GUH-2

GUH-1

8"ø

8"ø

8"ø8"ø

SL

55"x102"

"x

S L

AOM

TN AN

E E

N

No. 13799PE

KEVIN G. POPE

SC

L I E N

DE

S S

R O

F E

P

LI O AN

NG

E

I

R

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

920 Front Street, Suite 104 Helena, MT 59601 tel: 406.438.1467

06/10/2019

BIM 360://2018.03.0036 MTANG Building 321/MANG-Building 321_Mech-Plumb-R19.rvt

6/ 5/

:1

3:

P M

M2.00

1823 - PN JKSE 182404

2019-06-10

FIRST FLOOR MECHANICAL

PLAN

CMD

KGP

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

TYPE B-3 100% SUBMITTAL

1/4" = 1'-0"M2.00

1 MECHANICAL NEW PLAN

KEYNOTES - FLOOR PLAN

007 EXISTING INTAKE FILTERS TO BE REPLACED PRIOR TO PROJECT COMPLETION.

100 PROVIDE NEW CONTROLS FOR THIS ROOM AT THIS LOCATION. CONTROLS SHALL INCLUDE

ROOM HEATING, ROOM COOLING, AND GENERATOR VENTILATION. SEE CONTROLS NOTES ON

M3.00.

101 PROVIDE NEW CONTROLS FOR THIS ROOM AT THIS LOCATION. CONTROLS SHALL INCLUDE

ROOM HEATING AND ROOM COOLING. SEE CONTROLS NOTES ON M3.00.

102 NEW LOUVER TC DAMPERS AND ACTUATORS SHALL BE PROVIDED.

103 GUH-# GAS FIRED UNIT HEATER. MOUNT BOTTOM OF HEATER AS HIGH AS POSSIBLE.

PROVIDE FLUE AND COMBUSTION AIR FROM UNIT HEATER TO ROOF CONCENTRIC VENT

TERMINATION. FLUE AND COMBUSTION AIR SHALL BE THE MATERIAL AND SIZE AS REQUIRED

BY THE MANUFACTURER, TYPICAL. SEE EQUIPMENT CONNECTION DETAIL.

104 SP-# SUMP PUMP. PROVIDE NEW PUMP IN PIT AS REQUIRED AND CONNECT INTO EXISTING

WIRING, CONTROLS, AND PIPING.

105 ERV-1 ENERGY RECOVERY VENTILATION. MOUNT ON 4" HOUSEKEEPING PAD THAT 4" WIDER

THAN THE UNIT IN ALL DIRECTIONS. COORDINATE WITH G.C. AS REQUIRED.

106 OPEN DUCT END.

107 OPEN DUCT END POINTED DOWN.

108 PROVIDE SHEET METAL COVER OVER THE PREVIOUS PLENUM OPENING.

SHEET NOTES (MECHANICAL NEW)

A. ALL EQUIPMENT SHALL BE INSTALLED PER THE MANUFACTURER’S WRITTEN INSTALLATION,

OPERATION, AND MAINTENANCE (I.O.M.) INSTRUCTIONS WITH ALL REQUIRED CLEARANCES

MAINTAINED.

B. FOR FURTHER INFORMATION.

C. ALL THERMOSTATS TO BE MOUNTED AT 48" AFF.

D. MECHANICAL CONTRACTOR TO CORRDINATE SEALING OF ALL EXTERIOR PENETRATIONS WITH

THE GENERAL CONTRACTOR.

HEAT RECOVERY VENTILATOR

ITEM SERVICE

FAN DATA HEAT EXCHANGER ELECTRICAL DATA OP MANUFACTURER

NOTES

CON-

SUP EXH FAN (2) SUMMER WINTER SUMMER WINTER

V-PH FLA

WGT & MODEL NO. TROLS

CFM CFM SP (EA) EAT °F EAT °F LAT °F LAT °F EFFECT FAN LBS

IN W.C. DB/WB DB DB/WB DB % HP

ERV-1 VENT AIR 300 300 0.50 92 -19.0 84 39.6 50.00 2/10 120-1 3.3 75 Renewaire EV300 1 DDC

NOTES: 1. PROVIDE 2" PLEATED MERV 8 FILTERS ON HEAT EXCHANGER INLETS.

STATIONARY LOUVER SCHEDULE

ITEM SERVICE CFM

MAX S.P.

DROP

IN.

MAX

VELOCITY

FPM

MIN. FREE

AREA SQ.

FT.

SIZE

MANUFACTURER & MODEL NO. NOTESWIDTH

IN.

HEIGHT

IN.

SL-1 INTAKE 300 0.030 400 0.75 18 18 RUSKIN ELF6375DX 1

SL-2 EXHAUST 300 0.030 400 0.75 18 18 RUSKIN ELF6375DX 1

GENERAL NOTES:

1. ALL LOUVER SIZES (LxWxD) TO BE COORDINATED WITH ARCHITECTURAL DRAWINGS AND CONFIRMED BY ARCHITECT DURING SUBMITTALS.

2. ALL LOUVER WATER PROOFING/ASSEMBLY MOUNTING DETAILS TO BE COORDINATED WITH ARCHITECTURAL DRAWINGS AND CONFIRMED

BY ARCHITECT DURING SUBMITTALS.

3. ALL LOUVER COLORS, INCLUDING FIELD OR FACTORY PAINTING, NEEDS TO BE COORDINATED WITH ARCHITECTURAL DRAWINGS AND CONFIRMED

BY ARCHITECT DURING SUBMITTALS.

SPECIFIC NOTES:

1. PROVIE WITH 1/2"x1/2" BRIDSCREEN ON INSIDE FACE AND EXTENDED SILL.

GAS FIRED HEATER SCHEDULE

ITEM TYPE CFM MBH AIR MOTOR DATA OP MANUFACTURER & NOTES CONTROLS

EAT LAT HP V-PH WGT MODEL #

°F °F LBS

GUH-1 VERT 700 60.0 50 135 3/50 115-1 80.0 REZNOR UDAS 1,2 LOW VOLT TSTAT

GUH-2 VERT 700 30.0 50 92 2/67 115-1 60.0 REZNOR UDAS 1,2 LOW VOLT TSTAT

NOTES: 1. LOUVERS, FAN GUARD, INTEGRAL MANUAL STARTER, SINGLE STAGE INTERMITTENT PILOT

2. SINGLE POINT ELECTRICAL POWER CONNECTION WITH FUSED DISCONNECT FOR FAN, BURNER ASSEMBLY AND OR POWERED EXHAUST AND CONTROLS.

DOMESTIC PUMP SCHEDULE

ITEM TYPE SERVICE GPM

TOTAL

HEAD FT.

W.C.

HP

MOTOR DATA

OP WGT

LBS

MANUFACTURER / MODEL NO. NOTES

RPM V-PH

SP-1,2 SUMP PIT 55 10.0 1/2 1750 115-1 30 LIBERTY PUMPS / 280

NOTES:

1/21/2019

CONTROL NOTES

3/22/2019

GENERATOR ROOM:

1. SPACE HEATING SETPOINT: 60 DEGREES F (ADJUSTABLE).

2. SPACE HEATING SETPOINT: NA

3. ON A CALL FOR HEATING THE GAS FIRED UNIT HEATER SHALL OPERATE TO MAINTAIN ROOM SETPOINT.

4. INTAKE AND EXHAUST LOUVER TC DAMPERS SHALL 100% CLOSED AT ALL TIMES UNTIL GENERATOR OPERATION IN WHICH BOTH SET OF DAMPERS SHALL OPEN.

5. AFTER GENERATOR OPERATION HAS ENDED, DAMPERS SHALL BE 100% CLOSED.

6. AN ALARM SHALL BE INDICATED WITHIN THE BASE EMACS SYSTEM IF THE GENERATOR IS RUNNING AND ETIHER DAMPERS IS CLOSED.

FIRE PUMP ROOM:

1. SPACE HEATING SETPOINT: 60 DEGREES F (ADJUSTABLE).

2. SPACE HEATING SETPOINT: 85 DEGREES F (ADJUSTABLE).

3. ON A CALL FOR HEATING THE GAS FIRED UNIT HEATER SHALL OPERATE TO MAINTAIN ROOM SETPOINT.

4. ON A CALL FOR COOLING THE ENERY RECOVERY VENTILATOR (ERV-1) SHALL OPERATE TO MAINTAIN ROOM SETPOINT.

DDC MONITORING INTO EXISTING SYSTEM:

1. UNIT HEATER (UH-1) STATUS.

2. UNIT HEATER (UH-2) STATUS.

3. ENERGY RECOVERY VENTILATOR (ERV-1) STATUS.

4. GENERATOR ROOM SPACE TEMP.

5. GENERATOR INTAKE LOUVER STATUS

6. GENERATOR EXHAUST LOUVER STATUS

7. FIRE PUMP ROOM SPACE TEMP.

12" MIN

NOTE:

ALL THREADED JOINT MAKE UP

SHALL BE ACCOMPLISHED

WITH APPROVED JOINT

COMPOUND FOR NATURAL AND

MFGRD GAS. MAKE UP WITH

NO LESS THAN 2 THREADS

SHOWING. TEST FOR LEAKS AS

REQ'D BT SPECIFICATIONS.

DIRT LEG

APPLIANCE

CONNECTION

WITH

FLEXIBLE

CONNECTOR

MALLEABLE UNION

MALLEABLE TEE, STD OR

REDUCING AS REQ'D

CLOSE NIPPLE

3/4 & 1" SIZE: USE GROUND

JOINT GAS COCK, OVER 1" USE

LUBRICATED PLUG COCK OR

RATED & APPROVED BALL VALVE

PRIMARY GAS SUPPLY TO

APPLIANCE SEE DRAWING

FOR SIZE

6" MIN

FULL

SUPPLY

PIPE SIZE

MALLEABLE CAP

ALL NIPS

TBE (TYP)

GAS CONECTION DETAIL

NO SCALE

AOM

TN AN

E E

N

No. 13799PE

KEVIN G. POPE

SC

L I E N

DE

S S

R O

F E

P

LI O AN

NG

E

I

R

BIM FILE PATH:

SHEET NO.:

TITLE:

copyright 2018 SMA, P.C.

REVISIONS:

KEYMAP:

HELENA

920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com

ARCHITECT SEAL:

PROJECT:

PROJECT LOCATION:

PREPARED FOR:

LOGO:

CONSULTANT:

PROJECT NUMBER:

DRAWN BY:

CHECKED BY:

TEAM:

PHASE:

DATE:

PROJECT NUMBER:

Pl ot

D at e:

BOZEMAN

109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com

920 Front Street, Suite 104 Helena, MT 59601 tel: 406.438.1467

06/10/2019

BIM 360://2018.03.0036 MTANG Building 321/MANG-Building 321_Mech-Plumb-R19.rvt

6/ 5/

:1

3:

P M

M3.00

1823 - PN JKSE 182404

2019-06-10

MECHANICAL DETAILS AND

SCHEDULES

CMD

KGP

UPGRADE FIRE PUMPS B321

1823 - PN JKSE

182404

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

Mechanical, Electrical & Energy Consultants

Denver 7600 East Orchard Rd Suite 250-S Greenwood Village, CO 80111-2539 303.796.6000

Billings 175 North 27th Street, Suite

1312 Billings, MT 59101-2048 406.545.6420

Cheyenne 500 West 18th Street, Suite 200 Cheyenne, WY 82001-4368 307.459.6100

Salt Lake City 4760 S. Highland Drive, Suite

Salt Lake City, UT 84115

801.360.7024 Helena P.O. Box 9643 Helena, MT 59604 406.438.1467

Bogota, Colombia Calle 40B # 8-68 Edificio Torre San Marcos, 501

Bogota D.C. 110231 Colombia +57.1.485.0689

Box 9643 Helena, MT 59604

406.438.1467 www.mkkeng.com

X

F1

FACP

X

M

A

V

GF

G

J

J

J

X

C

PB

M

F

N

MCC

T

SPD

G

EPO

NOTE: ALL ABBREVIATIONS SHOWN

ARE NOT NECESSARILY USED.

1. THESE DRAWINGS ARE DIAGRAMMATIC. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT

DIMENSIONS.

2. REFER TO THE ARCHITECTURAL PLANS, ELEVATIONS, AND DIAGRAMS FOR LOCATIONS OF THE

FLOOR AND WALL DEVICES. IF DEVICES ARE NOT NOTED OTHERWISE THEY SHALL BE MOUNTED

LONG AXIS VERTICAL AT THE FOLLOWING HEIGHTS AFF TO CENTER OF DEVICE: SWITCHES +42", RECEPTACLES +18", VOICE/DATA JACKS +18".

3. COORDINATE ALL EQUIPMENT LOCATIONS WITH THE MECHANICAL PLANS AND THE

MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN.

4. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO

ADDITIONAL COST TO THE OWNER.

5. ALL 120V BRANCH CIRCUITS SHALL BE 3-WIRE (PHASE,NEUTRAL,GROUND). PHASE, NEUTRAL, AND GROUND CONDUCTORS SHALL BE SIZE 12 AWG UNLESS OTHERWISE NOTED. BRANCH

CIRCUITS SHOWN AS A SINGLE HOMERUN SHALL NOT BE COMBINED WITH OTHER CIRCUITS. ALL

BRANCH CIRCUITS AND FEEDERS SHALL HAVE EQUIPMENT GROUNDING CONDUCTORS

INSTALLED IN THE RACEWAY.

6. THE CONTRACTOR SHALL MAINTAIN FIRE-RATINGS FOR ALL CONDUIT PENETRATIONS THROUGH

FIRE-RATED CONSTRUCTION.

7. COORDINATE THE LOCATIONS AND CONTROLS OF ALL APPLICABLE FIRE/SMOKE DAMPERS WITH

THE MECHANICAL CONTRACTOR, PRIOR TO CONSTRUCTION.

8. ALL MOUNTING OF ELECTRICAL DEVICES (LUMINAIRES, OUTLETS, CONDUIT RUNS, ETC.) SHALL

COMPLY WITH STATE AND LOCAL SEISMIC REQUIREMENTS. ALL LUMINAIRES SHALL BE

SUPPORTED INDEPENDENTLY OF THE CEILING SUPPORT HANGERS IN COMPLIANCE WITH IBC

AND NEC REQUIREMENTS.

9. GFCI DEVICES SHALL BE PROVIDED AS NOTED AND SHALL COMPLY WITH NEC AND LOCAL

REQUIREMENTS. NO FEED-THRU GFCI PROTECTION SHALL BE PERMITTED FOR DOWNSTREAM

DEVICES. GFCI DUPLEX RECEPTACLES SHALL BE UL 943 2006 "LOCK-OUT" ACTION OR

"NOTIFICATION" COMPLIANT.

10. COORDINATE THE INSTALLATION OF COMMUNICATIONS CABLING, ROUTING, MOUNTING BOXES, AND TERMINATIONS WITH THE OWNER OR IT MANAGER, PRIOR TO CONSTRUCTION.

11. THE INFORMATION ON THESE DRAWINGS HAS BEEN ASCERTAINED FROM EXISTING DRAWINGS

AND FIELD OBSERVATIONS. THIS INFORMATION IS AS ACCURATE AS CONDITIONS WOULD

ALLOW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, PRIOR TO BID, AND

BECOME FAMILIAR WITH THE EXTENT OF THE WORK REQUIRED. NO EXTRAS WILL BE ALLOWED

FOR ALTERATIONS OF A FORESEEABLE NATURE THAT ARE REQUIRED TO ACHIEVE THE END

RESULT AS INDICATED BY THE CONTRACT DOCUMENTS.

12. ON DEMOLITION PLANS: ALL ITEMS SHOWN IN LIGHT LINE WEIGHT ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE. ALL ITEMS SHOWN IN HEAVY LINE WEIGHT SHALL BE REMOVED, UNLESS NOTED OTHERWISE.

13. ON NEW FLOOR PLANS: ALL ITEMS SHOWN IN LIGHT LINE WEIGHT ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE. ALL ITEMS SHOWN IN HEAVY LINE WEIGHT ARE NEW OR

RELOCATED AS NOTED.

14. THE NEW WIRING REQUIRED IN REMODELED AREAS SHALL BE FISHED THROUGH EXISTING

WALLS OR CONCEALED IN NEW WALLS OR ABOVE CEILINGS. SURFACE MOUNTED CONDUIT

SHALL NOT BE USED IN ANY FINISHED AREAS. CONTRACTOR SHALL NOT ROUTE ANY CONDUIT

WITHIN STRUCTURAL OR TOPPING SLABS OF FLOORS UNLESS NOTED TO DO SO.

15. ITEMS THAT ARE SHOWN TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY INCLUDING

ALL ASSOCIATED CONDUIT, WIRE, AND HANGERS BACK TO THE POINT OF ORIGIN OR THE

NEAREST EXISTING ITEM THAT IS REMAINING, UNLESS NOTED OTHERWISE. WHERE EXISTING

DEVICES, SWITCHES, MOTOR CONNECTIONS, ETC. ARE TO BE REMOVED FROM WALLS WHICH

ARE REMAINING, WALLS SHALL BE PATCHED TO MATCH ORIGINAL FINISH, AFTER CONDUCTORS

HAVE BEEN REMOVED. BLANK COVERPLATES OVER EXISTING BOXES ARE NOT ACCEPTABLE. IF

EXISTING CONDUITS ARE ROUTED IN CONCRETE FLOOR SLABS, WALLS OR CEILINGS, THEY

SHALL BE CUT BACK TO WITHIN CONCRETE AND FILLED WITH GROUT TO ACHIEVE A SMOOTH

AND EVEN FINISH FLUSH WITH CONCRETE SURFACE AFTER CONDUCTORS HAVE BEEN

REMOVED.

16. MAINTAIN CIRCUIT CONTINUITY FOR EXISTING ITEMS THAT ARE REMAINING OR BEING

RELOCATED.

17. ELECTRICAL DEVICE IDENTIFICATION LABELS: PROVIDE ADHESIVE FILM LABEL, MACHINE

PRINTED, IN BLACK, BY THERMAL TRANSFER OR EQUIVALENT PROCESS WITH MINIMUM LETTER

HEIGHT OF 3/8" ON ALL ELECTRICAL DEVICES. LABEL SHALL IDENTIFY ORIGINATING PANEL AND

CIRCUIT NUMBER IN THE FOLLOWING FORMAT: PANEL-CKT. REFERENCE SPECIFICATIONS FOR

ADDITIONAL LABELING REQUIREMENTS. WHERE THE PROJECT SPECIFICATIONS INDICATE MORE

STRINGENT LABELING REQUIREMENTS, THOSE REQUIREMENTS SHALL TAKE PRECEDENCE.

18. PROVIDE TYPED UPDATED PANEL DIRECTORIES FOR EXISTING PANELS AFFECTED BY REMODEL

WORK. PROVIDE NEW CIRCUIT BREAKER NUMBER IDENTIFICATION AS REQUIRED.

19. FLAG NOTES SHOWN ON DRAWINGS ARE BASED ON AN ABSOLUTE NUMBERING SYSTEM AND

ARE NOT NECESSARILY NUMBERED SEQUENTIALLY.

SUBSCRIPTS:

WALL MOUNTED TELEPHONE OUTLET

WALL MOUNTED DATA OUTLET

WALL MOUNTED COMBINATION TELEPHONE/DATA

CONNECTION TO PRE-WIRED EQUIPMENT

COMMUNICATION SYSTEM

SURGE PROTECTIVE DEVICE

CONDUIT STUB-OUT - CAP & MARK

NO. OF ARROWS INDICATE NO. OF CIRCUITS

CIRCUIT HOMERUN TO PANEL OR CABINET,

SEALOFF

CIRCUIT TURNED UP

CIRCUIT TURNED DOWN

CONDUIT RUN

ENGINE GENERATOR

CIRCUITING

TRANSFORMER

MOTOR CONTROL CENTER

PANELBOARD

OUTLET BOX

= SHUNT TRIP

= MULTISPEED

= VARIABLE FREQUENCY

= SOLID-STATE, REDUCED VOLTAGE

ENCLOSED CIRCUIT BREAKER, MOLDED-CASE,

COMBINATION DISCONNECT AND STARTER

FUSED DISCONNECT SWITCH

SAFETY DISCONNECT SWITCH

SUBSCRIPTS:

ST

THERMAL-MAGNETIC FIXED

SSRV

VF

MS

= ELECTRONIC ADJUSTABLE TRIPEAT

THERMAL-MAGNETIC FIXED

ENCLOSED CIRCUIT BREAKER, MOLDED-CASE,

ENCLOSED FUSED DISCONNECT SWITCH

= SHUNT TRIP

= KEY INTERLOCK

= CURRENT LIMITING

= INSULATED CASE

= GROUND FAULT CIRCUIT INTERRUPTER

= ZONE-SELECTIVE INTERLOCKING

GROUND FAULT PROTECTION

CURRENT TRANSFORMER

MOTOR, NUMBER INDICATES HORSEPOWER

GENERATOR

OUTLET WITH SPECIAL DEVICE, AS NOTED

PEDESTAL OUTLET, AS NOTED

WALL MOUNTED OUTLET WITH SPECIAL DEVICE,

POKE THROUGH, AS NOTED

SURFACE RACEWAY, AS NOTED

MAGNETIC MOTOR STARTER

FLOOR MOUNTED COMBINATION OUTLET BOX,

FLOOR MOUNTED RECEPTACLE, AS NOTED

WALL MOUNTED JUNCTION BOX

JUNCTION BOX, AS NOTED

JUNCTION BOX

CONNECTION TO MOTOR

TELE-POWER POLE

PULL BOX

CLOCK HANGER OUTLET

AS NOTED

AS NOTED

FIRE ALARM

= HOSPITAL GRADE

= HOSPITAL GRADE TAMPER RESISTANT

= SURGE SUPPRESSION

= GROUND FAULT INTERRUPTER

= 6" ABOVE COUNTER

STRAIGHT BLADE SINGLE RECEPTACLE

STRAIGHT BLADE DUPLEX RECEPT. ON EMERGENCY CIRCUIT

STRAIGHT BLADE DUPLEX RECEPT. HALF-SWITCHED

STRAIGHT BLADE DUPLEX RECEPTACLE

STRAIGHT BLADE DOUBLE DUPLEX RECEPT. (FOURPLEX)

HG

SS

AC

HGT

GFI

SUBSCRIPTS:

POWER

VOLT METER

TRANSFER SWITCH

AMMETER

POWER…